ImpactFeeAtlasCompare fees
CitySalt Lake CountyVerified Jun 16, 2026

Herriman, UT Development Impact Fees (2026)

A new single-family home in Herriman, Utah pays about $17,137 in total development impact and water/sewer connection fees per unit as of Jun 16, 2026 — about $7,008 in impact/development fees plus $10,129 in water & sewer connection (tap/SDC) fees. Every figure below is normalized per dwelling unit by category, with a link to its official source.

$17,137
Total per single-family home
impact + connection fees
$7,008
Impact / development fees
roads, parks, schools…
$10,129
Water & sewer connection
tap / capacity / SDC
Per multifamily unit
total fees / unit

What a single-family home pays in Herriman

$17,137 total per unit across 6 fee categories.

  • Water connection (tap / SDC)$6,859
  • Parks & recreation$3,551
  • Sewer connection (tap / SDC)$3,270
  • Transportation / roads$2,707
  • Fire / EMS$549
  • Police$201

Herriman’s $17,137 is close to the Utah tracked median of $16,967.

Full fee schedule — single-family detached

Impact / development fees

Fee (local term)BasisAmountSource · effective
Transportation / roads
Transportation Impact Fee — Herriman City adopted transportation impact fee, Master Fee Schedule effective July 1, 2026. VERIFIED verbatim (line 292).
per dwelling unit$2,707City of Herriman, Utah
Jul 1, 2026High
Fire / EMS
Fire Impact Fee (Residential) — Flat per-residential-unit fire/EMS impact fee (applies equally to SFD and MF units). Non-residential is $0.43/sq ft. VERIFIED verbatim (line 366).
per dwelling unit$549City of Herriman, Utah
Jul 1, 2026High
Police
Police Impact Fee (Residential) — Flat per-residential-unit police impact fee (applies equally to SFD and MF units). Non-residential is $0.35/sq ft. VERIFIED verbatim (line 369).
per dwelling unit$201City of Herriman, Utah
Jul 1, 2026High
Parks & recreation
Parks, Trails and Recreation Impact Fee (Single Family) — Herriman City Parks, Trails and Recreation impact fee. VERIFIED verbatim (line 375, under 'Parks Impact Fee' header).
per dwelling unit$3,551City of Herriman, Utah
Jul 1, 2026High
Drainage / stormwater
Storm Drain Impact Fee (Main Herriman service area) — Storm drain impact fee is charged PER ACRE of development, not per dwelling unit, so it cannot be cleanly normalized to a per-unit basis (varies with lot/density) and is intentionally left out of the per-unit total. Representative primary = Main Herriman area. The Towne Center service area is $4,088.17/acre (mutually exclusive geographic variant). VERIFIED verbatim (line 372).
per acre$2,611City of Herriman, Utah
Jul 1, 2026High
Drainage / stormwater
Storm Drain Impact Fee (Towne Center service area) — Mutually-exclusive geographic variant of the storm drain impact fee (Towne Center area). Excluded; Main Herriman area is the representative primary. VERIFIED verbatim (line 373).
alternative · not added to total
per acre$4,088City of Herriman, Utah
Jul 1, 2026High

Water & sewer connection fees

Fee (local term)BasisAmountSource · effective
Water connection (tap / SDC)
Water Impact Fee (Single Family, <0.24 acre lot) - culinary + secondary capacity — Herriman culinary + secondary WATER IMPACT (capacity) fee, tiered by lot size. Representative ~typical SFD lot (<0.24 acre) = $5,274 (Indoor $964 + Outdoor $4,310). This is the capacity/impact fee and is ADDITIVE to the separate water meter Connection Fee below. Larger lots cost more (0.25-0.49ac=$6,932; 0.50-0.74ac=$8,259; 0.75-0.99ac=$8,590; 1ac=$9,585). VERIFIED verbatim (line 380, under 'Water Impact Fee Schedule').
per dwelling unit$5,274City of Herriman, Utah
Jul 1, 2026High
Water connection (tap / SDC)
Water Connection Fee - Full Installation 3/4" Meter — Physical water meter installation/connection fee for the standard residential 3/4" meter. This is SEPARATE FROM and ADDITIVE TO the water impact (capacity) fee above. Larger meters cost more (1"=$1,785; 1.5"=$1,800; 2"=$2,500). VERIFIED verbatim (line 233, under 'Water Connection Fees').
per meter$1,585City of Herriman, Utah
Jul 1, 2026High
Sewer connection (tap / SDC)
Sewer Impact Fee - Single Family Detached (Jordan Basin Improvement District, Service Area 1) — Sewer is NOT provided by Herriman City. It is levied by a SEPARATE district: Jordan Basin Improvement District (formerly South Valley Sewer District, renamed 2024). Confirmed Herriman lies in Salt Lake County = JBID Service Area 1 (budget states 'Service Area 1 basically encompasses Salt Lake County'). SFD impact (connection) fee = $3,270/unit; 2026 rate unchanged from 2025. Resolution 11-25-2025-04 calls impact fees 'connection fee(s)' and adopts them for Service Area No. 1. VERIFIED verbatim in 2026 budget (line 901).
per dwelling unit$3,270Jordan Basin Improvement District (formerly South Valley Sewer District)
Jan 1, 2026High

Single-family attached (townhome) impact fees in Herriman

Impact / development fees

Fee (local term)BasisAmountSource · effective
Transportation / roads
Transportation Impact Fee (Single-Family Attached) — Alternative residential land-use variant of the transportation impact fee; excluded to avoid double-count with the SFD primary row. VERIFIED verbatim.
alternative · not added to total
per dwelling unit$1,957City of Herriman, Utah
Jul 1, 2026High

Water & sewer connection fees

Fee (local term)BasisAmountSource · effective
Water connection (tap / SDC)
Water Impact Fee (Townhome / SF attached unit) — Townhome water impact (capacity) fee = $1,959 (Indoor $964 + Outdoor $995). Lot-size/land-use variant of the water impact fee; excluded from the SFD primary. VERIFIED verbatim (line 378).
alternative · not added to total
per dwelling unit$1,959City of Herriman, Utah
Jul 1, 2026High

Multifamily (per unit) impact fees in Herriman

Impact / development fees

Fee (local term)BasisAmountSource · effective
Transportation / roads
Transportation Impact Fee (Multifamily Low-Rise) — Multifamily (low-rise) per-unit transportation impact fee. Mid-rise (4-10 stories) is $1,328.42/unit. Excluded from SFD total; this is the per-unit MF figure. VERIFIED verbatim.
alternative · not added to total
per dwelling unit$1,850City of Herriman, Utah
Jul 1, 2026High
Parks & recreation
Parks, Trails and Recreation Impact Fee (Multi-Family) — Per-unit multifamily parks impact fee. Excluded from SFD total; this is the per-unit MF figure. VERIFIED verbatim.
alternative · not added to total
per dwelling unit$3,151City of Herriman, Utah
Jul 1, 2026High

Water & sewer connection fees

Fee (local term)BasisAmountSource · effective
Sewer connection (tap / SDC)
Sewer Impact Fee - All Other Residential / Multifamily (Jordan Basin Improvement District, Service Area 1) — JBID Service Area 1 sewer impact fee for 'All Other Residential Units' (multifamily/townhome/condo), $2,387/unit. Assisted living = $2,376/bed. Excluded from SFD total; this is the per-unit MF figure. Separate district fee. VERIFIED verbatim in 2026 budget (line 902).
alternative · not added to total
per dwelling unit$2,387Jordan Basin Improvement District (formerly South Valley Sewer District)
Jan 1, 2026High

Coverage & caveats

FOUND (all official/current): Herriman City Master Fee Schedule effective July 1, 2026 (herriman.gov) provides Transportation impact fee ($2,707.47/SFD unit, full ITE land-use table), Fire ($549.16/unit), Police ($201.13/unit), Parks/Trails/Recreation ($3,550.64 SFD; $3,151.19 MF/unit), Storm Drain (per acre: $2,610.84 Main Herriman / $4,088.17 Towne Center), Water impact/capacity fee (lot-size tiered, $5,274 for typical SFD <0.24ac up to $9,585 for 1ac; $1,959 townhome), and a separate physical Water meter Connection fee ($1,585 for 3/4"). SEWER is provided by a SEPARATE district, the Jordan Basin Improvement District (JBID, formerly South Valley Sewer District); Herriman sits in JBID Service Area 1 (Salt Lake County); 2026 sewer impact/connection fee is $3,270/SFD unit and $2,387/other-residential unit, adopted via Resolution 11-25-2025-04 and listed in JBID's 2026 budget.

Does not exist

No SCHOOL impact fee (not authorized under Utah's Impact Fees Act); no standalone library, open-space, affordable-housing, general/capital, or mitigation impact fees in Herriman.

Caveats

(1) Storm drain fee is per ACRE not per dwelling unit, kept but excluded from per-unit total. (2) Water has TWO additive one-time charges: capacity/impact fee AND physical meter Connection fee. (3) Water impact fee is tiered by lot size; <0.24ac tier is the representative SFD primary, larger-lot tiers excluded. (4) JBID sewer is a separate-district fee; document also calls impact fees 'connection fees.' (5) Valuation-based building permit/plan-review fees intentionally omitted (service fees, not impact fees).

Verify

confirmed 15 of 15 rows (all amounts and sourceQuotes matched the re-fetched source PDFs verbatim — Herriman lines 233/292/293/294/366/369/372/373/375/376/378/380; JBID 2026 budget lines 901/902); dropped 0; excludeFromTotal corrections: none needed (all mutually-exclusive variants — SF-attached/MF land uses, townhome water variant, Towne Center geographic variant, larger-lot water tiers, and JBID 'all other residential' — already correctly flagged true; the per-acre storm drain primary is correctly excluded from the per-unit total). All three source PDFs and the JBID-serves-Herriman/Service-Area-1 attribution re-confirmed live; no dead links.

Population correction

researcher reported 60,049 (claimed 2024 Census estimate) but the cited World Population Review page now shows a 2026 projected population of 64,814 and a 2020 Census count of 56,209; the 60,049 figure could not be reconfirmed, so population set to the confirmable 2020 Census figure (56,209). Confidence high on all surviving fee rows.

Herriman residential builder one-time impact/connection fees for a representative ~2,000-2,500 sq ft single-family detached home on a small lot (<0.24 acre), as of the July 1, 2026 Master Fee Schedule and JBID 2026 rates. City-levied impact fees: Transportation $2,707.47, Parks $3,550.64, Fire $549.16, Police $201.13, Water capacity/impact $5,274.00, plus the physical Water meter Connection fee $1,585.00. Separate-district sewer (Jordan Basin Improvement District, Service Area 1) impact/connection fee $3,270.00. Storm drain impact fee is assessed PER ACRE ($2,610.84/ac Main Herriman), not per unit, so it is left out of a per-unit total but applies to the development. NOT included in the per-unit total are the excludeFromTotal rows (alternative land uses, lot-size/meter variants, geographic variants). Independently verified per-SFD-unit city + sewer impact/connection total = $17,137.40 (Transportation $2,707.47 + Parks $3,550.64 + Fire $549.16 + Police $201.13 + Water impact $5,274.00 + Water meter connection $1,585.00 + Sewer impact $3,270.00), excluding the per-acre storm drain fee and excluding valuation-based building permit/plan-review service fees. No double-counting: each primary row is a distinct fee category.

Sources

5 official sources · 14 high-confidence figures.

  1. 1City of Herriman - Master Fee Schedule (Effective July 1, 2026)City of Herriman, Utah · fee schedule · effective Jul 1, 2026 · retrieved Jun 16, 2026
  2. 2Master Fee Schedule (city webpage linking current PDF)City of Herriman, Utah · municipal webpage · retrieved Jun 16, 2026
  3. 3Jordan Basin Improvement District 2026 Tentative Budget (Impact Fee schedule, Service Area 1)Jordan Basin Improvement District (formerly South Valley Sewer District) · government report · effective Jan 1, 2026 · retrieved Jun 16, 2026
  4. 4Resolution No. 11-25-2025-04 Adopting Sewer Impact Fees on Development within Service Area No. 1Jordan Basin Improvement District · resolution · effective Nov 25, 2025 · retrieved Jun 16, 2026
  5. 5Herriman, Utah Population 2026World Population Review / U.S. Census Bureau · other · retrieved Jun 16, 2026

Herriman impact fees — FAQ

How much are development impact fees in Herriman, UT for a single-family home?
As of 2026-06-16, total development fees for a single-family detached home in Herriman are about $17,137 per unit — roughly $7,008 in impact/development fees plus $10,129 in water/sewer connection fees. Figures are normalized from official sources; verify with the jurisdiction before relying on them.
Are impact fees in Herriman the same as building permit fees?
No. Impact fees (and water/sewer connection fees) fund off-site capital — roads, parks, schools, utilities — and are charged per new dwelling unit. Building permit and plan-review fees are separate and are not included here.
How often do Herriman's impact fees change?
Most jurisdictions adopt fees by ordinance and escalate them annually (often by a construction cost index), with occasional mid-year updates. Always confirm the current adopted schedule with the jurisdiction. ImpactFeeAtlas last verified Herriman on 2026-06-16.

Compare impact fees in nearby Utah jurisdictions

Cities with a similar fee burden

Jurisdictions in other states with total single-family fees close to Herriman’s $17,137 per home.