What a single-family home pays in Herriman
$17,137 total per unit across 6 fee categories.
- Water connection (tap / SDC)$6,859
- Parks & recreation$3,551
- Sewer connection (tap / SDC)$3,270
- Transportation / roads$2,707
- Fire / EMS$549
- Police$201
Herriman’s $17,137 is close to the Utah tracked median of $16,521.
Full fee schedule — single-family
Impact / development fees
| Fee (local term) | Basis | Amount | Source · effective |
|---|---|---|---|
Transportation / roads Transportation Impact Fee — Herriman City adopted transportation impact fee, Master Fee Schedule effective July 1, 2026. | per dwelling unit | $2,707 | City of Herriman, Utah Jul 1, 2026High |
Fire / EMS Fire Impact Fee (Residential) — Flat per-residential-unit fire/EMS impact fee (applies equally to SFD and MF units). Non-residential is $0.43/sq ft. | per dwelling unit | $549 | City of Herriman, Utah Jul 1, 2026High |
Police Police Impact Fee (Residential) — Flat per-residential-unit police impact fee (applies equally to SFD and MF units). Non-residential is $0.35/sq ft. Fire + Police are reported in Herriman's Public Safety Impact Fee Analysis. | per dwelling unit | $201 | City of Herriman, Utah Jul 1, 2026High |
Parks & recreation Parks, Trails and Recreation Impact Fee (Single Family) — Herriman City Parks, Trails and Recreation impact fee. | per dwelling unit | $3,551 | City of Herriman, Utah Jul 1, 2026High |
Drainage / stormwater Storm Drain Impact Fee (Main Herriman service area) — Storm drain impact fee is charged PER ACRE of development, not per dwelling unit, so it cannot be cleanly normalized to a per-unit basis (varies with lot/density). Representative primary = Main Herriman area. The Towne Center service area is $4,088.17/acre (mutually exclusive geographic variant). | per acre | $2,611 | City of Herriman, Utah Jul 1, 2026High |
Drainage / stormwater Storm Drain Impact Fee (Towne Center service area) — Mutually-exclusive geographic variant of the storm drain impact fee (Towne Center area). Excluded; Main Herriman area is the representative primary. alternative · not added to total | per acre | $4,088 | City of Herriman, Utah Jul 1, 2026High |
Water & sewer connection fees
| Fee (local term) | Basis | Amount | Source · effective |
|---|---|---|---|
Water connection (tap / SDC) Water Impact Fee (Single Family, <0.24 acre lot) - culinary + secondary capacity — Herriman culinary + secondary WATER IMPACT (capacity) fee, tiered by lot size. Representative ~typical SFD lot (<0.24 acre) = $5,274 (Indoor $964 + Outdoor $4,310). This is the capacity/impact fee and is ADDITIVE to the separate water meter Connection Fee below. Larger lots cost more (0.25-0.49ac=$6,932; 0.50-0.74ac=$8,259; 0.75-0.99ac=$8,590; 1ac=$9,585). | per dwelling unit | $5,274 | City of Herriman, Utah Jul 1, 2026High |
Water connection (tap / SDC) Water Connection Fee - Full Installation 3/4" Meter — Physical water meter installation/connection fee for the standard residential 3/4" meter. This is SEPARATE FROM and ADDITIVE TO the water impact (capacity) fee above. Larger meters cost more (1"=$1,785; 1.5"=$1,800; 2"=$2,500). | per meter | $1,585 | City of Herriman, Utah Jul 1, 2026High |
Sewer connection (tap / SDC) Sewer Impact Fee - Single Family Detached (Jordan Basin Improvement District, Service Area 1) — Sewer is NOT provided by Herriman City. It is levied by a SEPARATE district: Jordan Basin Improvement District (formerly South Valley Sewer District, renamed June 12, 2024). Herriman lies in Salt Lake County = JBID Service Area 1. SFD impact (connection) fee = $3,270/unit; 2026 rate unchanged from 2025. The fee is also referred to as a 'connection fee' in Resolution 11-25-2025-04. | per dwelling unit | $3,270 | Jordan Basin Improvement District (formerly South Valley Sewer District) Jan 1, 2026High |
Coverage & caveats
FOUND (all official/current): Herriman City Master Fee Schedule effective July 1, 2026 (herriman.gov) provides Transportation impact fee ($2,707.47/SFD unit, with full ITE land-use table), Fire ($549.16/unit), Police ($201.13/unit), Parks/Trails/Recreation ($3,550.64 SFD; $3,151.19 MF/unit), Storm Drain (per acre: $2,610.84 Main Herriman / $4,088.17 Towne Center), Water impact/capacity fee (lot-size tiered, $5,274 for typical SFD <0.24ac up to $9,585 for 1ac; $1,959 townhome), and a separate physical Water meter Connection fee ($1,585 for 3/4\"). SEWER is provided by a SEPARATE district, the Jordan Basin Improvement District (JBID, formerly South Valley Sewer District, renamed 6/12/2024); Herriman sits in JBID Service Area 1 (Salt Lake County); 2026 sewer impact/connection fee is $3,270/SFD unit and $2,387/other-residential unit, adopted via Resolution 11-25-2025-04 and listed in JBID's 2026 budget. DOES NOT EXIST: No SCHOOL impact fee — school impact fees are not authorized under Utah law (Utah Impact Fees Act enumerated facilities do not include schools; Jordan/Canyons school districts cannot levy impact fees). No standalone library, open-space, affordable-housing, general/capital, or mitigation impact fees in Herriman. CAVEATS: (1) Storm drain fee is per ACRE not per dwelling unit, so it is not normalized into the per-unit total but does apply. (2) Water has TWO distinct one-time charges that are additive: the capacity/impact fee (tiered by lot size, includes indoor culinary + outdoor secondary components) AND the physical meter Connection fee — both included as separate rows. (3) Water impact fee is tiered by lot size; the <0.24-acre tier is used as the representative SFD primary, larger-lot tiers carry excludeFromTotal=true. (4) JBID sewer fee is a separate-district fee attributable to a Herriman builder; the document also calls impact fees 'connection fees.' (5) The Master Fee Schedule's building permit and plan-review fees are valuation-based service fees, not impact fees, and were intentionally omitted. (6) Secondary irrigation water in some areas is provided differently by zone; the standard residential culinary+secondary impact fee was used. All amounts quoted verbatim from official sources; confidence high.
Herriman residential builder one-time impact/connection fees for a representative ~2,000-2,500 sq ft single-family detached home on a small lot (<0.24 acre), as of the July 1, 2026 Master Fee Schedule and JBID 2026 rates. City-levied impact fees: Transportation $2,707.47, Parks $3,550.64, Fire $549.16, Police $201.13, Water capacity/impact $5,274.00, plus the physical Water meter Connection fee $1,585.00. Separate-district sewer (Jordan Basin Improvement District, Service Area 1) impact/connection fee $3,270.00. Storm drain impact fee is assessed PER ACRE ($2,610.84/ac Main Herriman), not per unit, so it is left out of a per-unit total but applies to the development. NOT included in the per-unit total are the excludeFromTotal rows (alternative land uses, lot-size/meter variants, geographic variants). Approximate per-SFD-unit city + sewer impact/connection total ≈ $17,137 (Transportation $2,707.47 + Parks $3,550.64 + Fire $549.16 + Police $201.13 + Water impact $5,274.00 + Water meter connection $1,585.00 + Sewer impact $3,270.00), excluding the per-acre storm drain fee and excluding standard building permit/plan-review fees.
Sources
5 official sources · 14 high-confidence figures.
- 1City of Herriman - Master Fee Schedule (Effective July 1, 2026)City of Herriman, Utah · fee schedule · effective Jul 1, 2026 · retrieved Jun 16, 2026
- 2Master Fee Schedule (city webpage linking current PDF)City of Herriman, Utah · municipal webpage · retrieved Jun 16, 2026
- 3Jordan Basin Improvement District 2026 Tentative Budget (Impact Fee schedule, Service Area 1)Jordan Basin Improvement District (formerly South Valley Sewer District) · government report · effective Jan 1, 2026 · retrieved Jun 16, 2026
- 4Resolution No. 11-25-2025-04 Adopting Sewer Impact Fees on Development within Service Area No. 1Jordan Basin Improvement District · resolution · effective Nov 25, 2025 · retrieved Jun 16, 2026
- 5Herriman, Utah Population 2026 (cites 2024 Census estimate)World Population Review / U.S. Census Bureau · other · retrieved Jun 16, 2026
Herriman impact fees — FAQ
- How much are development impact fees in Herriman, UT for a single-family home?
- As of 2026-06-16, total development fees for a single-family detached home in Herriman are about $17,137 per unit — roughly $7,008 in impact/development fees plus $10,129 in water/sewer connection fees. Figures are normalized from official sources; verify with the jurisdiction before relying on them.
- Are impact fees in Herriman the same as building permit fees?
- No. Impact fees (and water/sewer connection fees) fund off-site capital — roads, parks, schools, utilities — and are charged per new dwelling unit. Building permit and plan-review fees are separate and are not included here.
- How often do Herriman's impact fees change?
- Most jurisdictions adopt fees by ordinance and escalate them annually (often by a construction cost index), with occasional mid-year updates. Always confirm the current adopted schedule with the jurisdiction. ImpactFeeAtlas last verified Herriman on 2026-06-16.