ImpactFeeAtlasCompare fees
CityMaricopa CountyVerified Jun 16, 2026

Surprise, AZ Development Impact Fees (2026)

A new single-family home in Surprise, Arizona pays about $17,781 in total development impact and water/sewer connection fees per unit as of Jun 16, 2026 — about $4,326 in impact/development fees plus $13,455 in water & sewer connection (tap/SDC) fees. Every figure below is normalized per dwelling unit by category, with a link to its official source.

$17,781
Total per single-family home
impact + connection fees
$4,326
Impact / development fees
roads, parks, schools…
$13,455
Water & sewer connection
tap / capacity / SDC
Per multifamily unit
total fees / unit

What a single-family home pays in Surprise

$17,781 total per unit across 6 fee categories.

  • Water connection (tap / SDC)$8,974
  • Sewer connection (tap / SDC)$4,481
  • Parks & recreation$1,800
  • Fire / EMS$1,737
  • Police$581
  • General government / capital$208

Surprise’s $17,781 is close to the Arizona tracked median of $15,719.

Full fee schedule — single-family detached

Impact / development fees

Fee (local term)BasisAmountSource · effective
Fire / EMS
Fire Development Impact Fee — Residential - Fee per Dwelling, Fire column. 'Single Family' includes detached and attached (townhouse) units. VERIFIED against PDF line 337.
per dwelling unit$1,737City of Surprise Community Development
Apr 1, 2025High
Parks & recreation
Parks & Recreation Development Impact Fee — Residential - Fee per Dwelling, Parks column. VERIFIED against PDF line 337.
per dwelling unit$1,800City of Surprise Community Development
Apr 1, 2025High
Police
Police Development Impact Fee — Residential - Fee per Dwelling, Police column. VERIFIED against PDF line 337.
per dwelling unit$581City of Surprise Community Development
Apr 1, 2025High
General government / capital
General Government Development Impact Fee — Residential - Fee per Dwelling, General Government column. VERIFIED against PDF line 337.
per dwelling unit$208City of Surprise Community Development
Apr 1, 2025High

Water & sewer connection fees

Fee (local term)BasisAmountSource · effective
Water connection (tap / SDC)
Water System Development Fee (SDF) - 3/4" meter, SPA 1 — Water System SDF by meter size; base residential 3/4" meter = 1.00 EDU. Representative = Service Planning Area (SPA) 1 ($5,325). Other SPAs are mutually-exclusive geographic service zones: SPA 2 $5,296, SPA 3 $3,142, SPA 4 $2,966, SPA 5 not served (-). This is the base water capacity charge; the Water Resource fee below is ADDITIVE on top. VERIFIED against PDF Water System table.
per meter$5,325City of Surprise Community Development
Apr 1, 2025High
Water connection (tap / SDC)
Water System SDF - 3/4" meter, SPA 2 (variant) — Mutually-exclusive SPA 2 variant of the Water System SDF (3/4" meter). Excluded from total; SPA 1 used as primary. VERIFIED; excludeFromTotal correct.
alternative · not added to total
per meter$5,296City of Surprise Community Development
Apr 1, 2025High
Water connection (tap / SDC)
Water System SDF - 3/4" meter, SPA 3 (variant) — Mutually-exclusive SPA 3 variant of the Water System SDF (3/4" meter). Excluded from total. VERIFIED; excludeFromTotal correct.
alternative · not added to total
per meter$3,142City of Surprise Community Development
Apr 1, 2025High
Water connection (tap / SDC)
Water System SDF - 3/4" meter, SPA 4 (variant) — Mutually-exclusive SPA 4 variant of the Water System SDF (3/4" meter). Excluded from total. VERIFIED; excludeFromTotal correct.
alternative · not added to total
per meter$2,966City of Surprise Community Development
Apr 1, 2025High
Water connection (tap / SDC)
Water Resource Development Fee (SDF) - 3/4" meter — Water Resource SDF is ADDITIVE on top of the Water System SDF. Uniform $3,649 across all SPAs for the 3/4" meter (1.00 EDU). Combined base water charge (System + Resource, SPA 1, 3/4") = $8,974. VERIFIED against PDF Water Resource table.
per meter$3,649City of Surprise Community Development
Apr 1, 2025High
Sewer connection (tap / SDC)
Wastewater System Development Fee (SDF) - 3/4" meter, SPA 1 — Wastewater SDF by meter size; base residential 3/4" meter = 1.00 EDU. Representative = SPA 1 ($4,481). Mutually-exclusive SPAs vary widely: SPA 2 $9,003, SPA 3 $9,108, SPA 4 $9,190, SPA 5 $9,190. SPA 1 is the lowest; a builder's actual fee depends on which service planning area the parcel is in. VERIFIED against PDF Wastewater table.
per meter$4,481City of Surprise Community Development
Apr 1, 2025High
Sewer connection (tap / SDC)
Wastewater SDF - 3/4" meter, SPA 4/5 (variant, highest) — Mutually-exclusive Wastewater SDF variant for SPA 4 and SPA 5 (3/4" meter), the highest wastewater zone. Excluded from total; SPA 1 used as primary. Included to show the range ($4,481-$9,190). VERIFIED; excludeFromTotal correct.
alternative · not added to total
per meter$9,190City of Surprise Community Development
Apr 1, 2025High
Water connection (tap / SDC)
Water Meter Installation Fee - 3/4" ultrasonic (FY2025) — Operational meter-installation (hardware + labor) cost, NOT a capacity/system development fee. Market Cost updated each July 1. Excluded from impact-fee total but a real cost a residential builder pays at building permit within the Surprise water service area. VERIFIED against PDF line 649; excludeFromTotal correct.
alternative · not added to total
per meter$423City of Surprise Community Development
Apr 1, 2025High

Multifamily (per unit) impact fees in Surprise

Impact / development fees

Fee (local term)BasisAmountSource · effective
Fire / EMS
Fire Development Impact Fee (Multi-Family) — Multi-family per-dwelling fee (structures with 2+ units). Excluded from single-family total. VERIFIED against PDF line 338; excludeFromTotal correct.
alternative · not added to total
per dwelling unit$1,064City of Surprise Community Development
Apr 1, 2025High
Parks & recreation
Parks & Recreation Impact Fee (Multi-Family) — Multi-family per-dwelling Parks fee. Excluded from single-family total. VERIFIED against PDF line 338.
alternative · not added to total
per dwelling unit$1,102City of Surprise Community Development
Apr 1, 2025High
Police
Police Impact Fee (Multi-Family) — Multi-family per-dwelling Police fee. Excluded from single-family total. VERIFIED against PDF line 338.
alternative · not added to total
per dwelling unit$356City of Surprise Community Development
Apr 1, 2025High
General government / capital
General Government Impact Fee (Multi-Family) — Multi-family per-dwelling General Government fee. Excluded from single-family total. VERIFIED against PDF line 338.
alternative · not added to total
per dwelling unit$143City of Surprise Community Development
Apr 1, 2025High

Mobile / manufactured home impact fees in Surprise

Impact / development fees

Fee (local term)BasisAmountSource · effective
Fire / EMS
Fire Impact Fee (Mobile Home) — Mobile home / RV unit per-dwelling Fire fee. Excluded from single-family total. (Other mobile-home columns: Parks $760, Police $245, General Gov $132.) VERIFIED against PDF line 339.
alternative · not added to total
per dwelling unit$734City of Surprise Community Development
Apr 1, 2025High

Coverage & caveats

Source: official adopted City of Surprise Development Services Fee Schedule (CD 04/2025), the citywide schedule linked from the city's Development Impact Fees page. FOUND (residential, per dwelling, single-family): Fire $1,737, Parks $1,800, Police $581, General Government $208. Utility System Development Fees (per ARS 9-463.05), priced by water meter size, base 3/4" residential meter: Water System SDF $5,325 (SPA 1; ranges $2,966-$5,325 across service planning areas), Water Resource SDF $3,649 (uniform, ADDITIVE on top of Water System), Wastewater SDF $4,481 (SPA 1; ranges up to $9,190 in SPA 4/5). Multi-family and mobile-home per-unit tiers also captured (excluded from single-family total). DOES NOT EXIST in Surprise: (1) NO transportation/roadway/streets impact fee — the residential impact-fee table has only Fire, Parks, Police, and General Government columns; (2) NO library impact fee; (3) NO drainage impact fee; (4) NO open-space, affordable-housing, or general mitigation impact fee; (5) NO SCHOOL impact fee — not an authorized category under Arizona law (ARS 9-463.05); Arizona school districts cannot levy impact fees.

Caveats

(a) The impact fees derive from a TischlerBise Development Fee Study (categories effective Aug 5, 2019); the fee schedule notes both 'Grandfathered' and 'New' impact fees are assessed and due at building-permit issuance. (b) 'Single Family' in this schedule explicitly includes detached AND attached (townhouse) units; there is no separate ADU line. (c) Utility SDFs apply only within the City of Surprise water/wastewater service area; the SPA (Service Planning Area 1-5) determines the water and wastewater amount. (d) Additional area-specific Sewer Line Extension reimbursement fees exist for certain districts (Bell Pointe $410, Cactus $116/$118 residential, Litchfield $220, Paradise Acres $3,035, Sarival $153) — localized cost-recovery charges, not citywide impact fees, not added to main rows; these were also confirmed present in the PDF (line 627-631). (e) Water meter installation fee ($422.70 for 3/4", FY2025) is an operational hardware/labor cost updated each July 1, not a capacity SDF. (f) Maricopa County does not levy a separate county residential development impact fee within municipal limits.

Verify

confirmed 17 of 17 rows; dropped 0; all amounts and sourceQuotes confirmed verbatim against the re-fetched CD 04/2025 PDF (impact table PDF lines 337-339; Water System/Water Resource/Wastewater tables p.9-10; meter install p.16 line 649). excludeFromTotal corrections: none needed — all mutually-exclusive SPA variants (Water System SPA2/3/4, Wastewater SPA4/5), all multi-family and mobile-home tiers, and the operational meter-installation fee were already correctly flagged excludeFromTotal=true; the four single-family impact fees plus the representative SPA 1 Water System ($5,325), Water Resource ($3,649, additive), and Wastewater SPA 1 ($4,481) are the only rows counted in the total — no double-counting detected. Note the source CD 04/2025 PDF lists Wastewater SPA1 2.00" meter as "$23886" (missing comma, =$23,886) but this does not affect any captured row. Confidence retained at 'high' for all rows; the official adopted PDF directly substantiates every figure.

All residential impact-fee amounts are per dwelling unit and were read verbatim from the City of Surprise Development Services Fee Schedule stamped 'CD 04/2025' (current adopted schedule). Single-family impact-fee subtotal (Fire $1,737 + Parks $1,800 + Police $581 + General Government $208) = $4,326 per dwelling. Utility SDFs are priced by water meter size; the base residential 3/4" meter (1.00 EDU) is used as primary. For a typical detached home in SPA 1: Water System $5,325 + Water Resource $3,649 (additive) + Wastewater $4,481 = $13,455 in utility SDFs. Note Wastewater varies dramatically by SPA ($4,481 in SPA 1 up to $9,190 in SPA 4/5) and Water System varies ($2,966-$5,325), so the all-in figure depends on the parcel's service planning area. AZ SDFs do not auto-escalate (5-year study cycle); however the water METER INSTALLATION fee (a separate operational charge, $422.70 for 3/4") is updated annually each July 1.

Sources

3 official sources · 17 high-confidence figures.

  1. 1City of Surprise Development Services Fee Schedule (CD 04/2025)City of Surprise Community Development · fee schedule · effective Apr 1, 2025 · retrieved Jun 16, 2026
  2. 2Development Impact Fees - Surprise, AZ Official WebsiteCity of Surprise · municipal webpage · retrieved Jun 16, 2026
  3. 3Development Impact Fee Study - Surprise, AZ Official WebsiteCity of Surprise · fee study · effective Aug 5, 2019 · retrieved Jun 16, 2026

Surprise impact fees — FAQ

How much are development impact fees in Surprise, AZ for a single-family home?
As of 2026-06-16, total development fees for a single-family detached home in Surprise are about $17,781 per unit — roughly $4,326 in impact/development fees plus $13,455 in water/sewer connection fees. Figures are normalized from official sources; verify with the jurisdiction before relying on them.
Are impact fees in Surprise the same as building permit fees?
No. Impact fees (and water/sewer connection fees) fund off-site capital — roads, parks, schools, utilities — and are charged per new dwelling unit. Building permit and plan-review fees are separate and are not included here.
How often do Surprise's impact fees change?
Most jurisdictions adopt fees by ordinance and escalate them annually (often by a construction cost index), with occasional mid-year updates. Always confirm the current adopted schedule with the jurisdiction. ImpactFeeAtlas last verified Surprise on 2026-06-16.

Compare impact fees in nearby Arizona jurisdictions

Cities with a similar fee burden

Jurisdictions in other states with total single-family fees close to Surprise’s $17,781 per home.