ImpactFeeAtlasCompare fees
CityUtah CountyVerified Jun 17, 2026

American Fork, UT Development Impact Fees (2026)

Normalized development impact fees, water & sewer connection (tap/SDC) fees, and mitigation fees for American Fork, Utah — per dwelling unit, by category, with links to every official source.

$12,228
Total per single-family home
impact + connection fees
$8,160
Impact / development fees
roads, parks, schools…
$4,068
Water & sewer connection
tap / capacity / SDC
Per multifamily unit
total fees / unit

What a single-family home pays in American Fork

$12,228 total per unit across 6 fee categories.

  • Parks & recreation$3,856
  • Transportation / roads$3,548
  • Water connection (tap / SDC)$2,977
  • Sewer connection (tap / SDC)$1,090
  • Fire / EMS$429
  • Police$326

At $12,228, American Fork is below the Utah tracked median of $16,967 — relatively affordable to build in.

Full fee schedule — single-family

Impact / development fees

Fee (local term)BasisAmountSource · effective
Fire / EMS
Fire Impact Fee (single-family) — City fire impact fee per single-family dwelling unit. VERIFIED verbatim.
per dwelling unit$429American Fork City
Jul 1, 2025High
Parks & recreation
Parks & Recreation Impact Fee (single-family) — City parks & recreation impact fee per single-family unit. VERIFIED verbatim.
per dwelling unit$3,856American Fork City
Jul 1, 2025High
Police
Police Impact Fee (single-family) — City police impact fee per single-family unit. VERIFIED verbatim.
per dwelling unit$326American Fork City
Jul 1, 2025High
Transportation / roads
Roads Impact Fee (single-family, non-TOD) — Standard (non-Transit-Oriented-Development) road impact fee per single-family unit; primary. VERIFIED verbatim (Single Family Residential (non-TOD) - per unit 3,548.30).
per dwelling unit$3,548American Fork City
Jul 1, 2025High
Transportation / roads
Roads Impact Fee (single-family, TOD) — Transit-Oriented-Development zone alternative rate; excluded (mutually exclusive with non-TOD). VERIFIED verbatim.
alternative · not added to total
per dwelling unit$3,016American Fork City
Jul 1, 2025High
Drainage / stormwater
Storm Drain Impact Fee — Charged per GROSS square foot (varies by lot/footprint), not a fixed per-DU amount; same rate for SFR/MFR/non-residential. Excluded from per-unit total. ADDITIVE where applicable. VERIFIED verbatim.
alternative · not added to total
per sq ft$0.15American Fork City
Jul 1, 2025High

Water & sewer connection fees

Fee (local term)BasisAmountSource · effective
Water connection (tap / SDC)
Culinary Water Impact Fee (3/4" meter) — Primary residential meter size (3/4"). City culinary water impact fee. Larger meters are mutually-exclusive alternatives (see excluded rows). VERIFIED verbatim against FY2025-26 Adopted Fee Schedule.
per meter$2,502American Fork City
Jul 1, 2025High
Water connection (tap / SDC)
Culinary Water Impact Fee (1" meter) — Alternative meter size to the 3/4" primary; excluded to avoid double-count. VERIFIED verbatim.
alternative · not added to total
per meter$4,179American Fork City
Jul 1, 2025High
Water connection (tap / SDC)
Culinary Water Impact Fee (2" meter) — Alternative meter size to the 3/4" primary; excluded. VERIFIED verbatim.
alternative · not added to total
per meter$13,338American Fork City
Jul 1, 2025High
Sewer connection (tap / SDC)
Sanitary Sewer Impact Fee - city collection (3/4" meter) — City COLLECTION-system sewer impact fee (3/4" meter, primary). This is separate from and ADDITIVE to the TSSD treatment impact fee. Larger meters are mutually-exclusive alternatives. VERIFIED verbatim.
per meter$840American Fork City
Jul 1, 2025High
Sewer connection (tap / SDC)
Sanitary Sewer Impact Fee - city collection (1" meter) — Alternative meter size to the 3/4" primary; excluded. VERIFIED verbatim.
alternative · not added to total
per meter$1,403American Fork City
Jul 1, 2025High
Water connection (tap / SDC)
Pressurized Irrigation Impact Fee — Secondary (irrigation) water impact fee, charged per IRRIGATED square foot where PI service is provided; varies by irrigated area, not fixed per-DU. Same rate for SFR/MFR/non-residential. VERIFIED verbatim.
alternative · not added to total
per sq ft$0.42American Fork City
Jul 1, 2025High
Water connection (tap / SDC)
Water Connection (Hook Up) Fee (0.750 inch) — Physical water connection/tap (hook-up) fee for base 3/4" residential meter; ADDITIVE to the water impact fee. Larger meters excluded as alternatives. VERIFIED verbatim (Utility Hook Up Fees section).
per meter$475American Fork City
Jul 1, 2025High
Sewer connection (tap / SDC)
Sewer Connection (Hook Up) Fee — Physical sewer connection/hook-up fee; ADDITIVE to sewer impact fees. Flat residential rate. VERIFIED verbatim (Utility Hook Up Fees section).
per dwelling unit$235American Fork City
Jul 1, 2025High
Water connection (tap / SDC)
Pressurized Irrigation Connection (Hook Up) Fee (0.750 inch) — Secondary-water (PI) connection/hook-up fee for base 3/4" meter; applies only on lots receiving pressurized irrigation service. Excluded from base total since not all SFD lots have PI. VERIFIED verbatim (Utility Hook Up Fees section; note a separate $250 'Pressurized Irrigation Connection fee' appears under Utilities, but this $475 hook-up matches the cited quote).
alternative · not added to total
per meter$475American Fork City
Jul 1, 2025High
Sewer connection (tap / SDC)
TSSD Sewer (Treatment) Impact Fee - Timpanogos Special Service District — SEPARATE DISTRICT fee (per ERU) that an American Fork residential builder MUST pay. Collected on the city building permit but paid to TSSD. $5,793.00/ERU effective Jan 1, 2026 (down from $5,931.00). This is the wastewater TREATMENT impact fee, ADDITIVE to the city's own sewer collection impact fee ($840.08 for 3/4"). TSSD's Dec-2025 IFA (source index 3) shows a MAXIMUM allowable 2026 fee of $7,023.05/ERU (CONFIRMED in PDF), but the adopted/charged fee is $5,793.00. CONFIDENCE LOWERED to medium: city Building Department host timed out on direct fetch; the sourceQuote was confirmed verbatim only via a search-engine snippet of that page. The city fee schedule itself lists 'TSSD Impact Fee - per ERU ... As adopted by TSSD' (no fixed dollar).
$5,793American Fork City
Jan 1, 2026Medium
Sewer connection (tap / SDC)
TSSD Sewer Impact Processing Fee (city) — Small city administrative processing fee for handling the TSSD impact fee on the building permit. VERIFIED verbatim against FY2025-26 Adopted Fee Schedule.
per dwelling unit$15American Fork City
Jul 1, 2025High

Coverage & caveats

All city impact/connection fees are from the American Fork City ADOPTED Fee Schedule, Effective July 1, 2025 (adopted June 10, 2025) — the current official master fee schedule (high confidence, exact quotes). American Fork levies city impact fees for: Culinary Water (by meter size), Fire, Parks & Recreation, Police, Pressurized Irrigation (per irrigated sq ft), Sanitary Sewer (city collection, by meter size), Storm Drain (per gross sq ft), and Roads (with separate non-TOD and TOD rate sets). Separate, ADDITIVE city "Utility Hook Up Fees" exist for Water connection, Sewer connection, and Pressurized Irrigation connection (these are tap/connection fees charged on top of the impact fees). PRIMARY ROWS: For single_family_detached I used the per-unit categories plus the 3/4" meter water impact fee, the 3/4" meter sanitary sewer impact fee, and the non-TOD road impact fee. All larger meter sizes, all TOD road variants, and all multifamily variants are marked excludeFromTotal=true (they are mutually-exclusive alternatives or a different land use). Storm Drain ($0.1536/gross sq ft) and Pressurized Irrigation ($0.42/irrigated sq ft) impact fees are charged per square foot, not per dwelling unit, so they are included with their published per-sqft basis and marked excludeFromTotal=true (cannot be expressed as a fixed per-DU amount without assuming lot/irrigated area). SEPARATE DISTRICT (must be paid by an AF residential builder): Sanitary sewer TREATMENT impact fees are levied by Timpanogos Special Service District (TSSD), not the city. Per the American Fork Building Department, effective January 1, 2026 the TSSD impact fee is $5,793.00 per ERU (decreased from $5,931.00); all permits issued after Dec 31, 2025 are charged $5,793.00. This is collected on the city building permit but paid to TSSD; the city also adds a $15.00 TSSD Sewer Impact Processing Fee. The TSSD Dec-2025 Impact Fee Analysis (Zions Public Finance) shows a MAXIMUM allowable 2026 fee of $7,023.05/ERU, but TSSD ADOPTED the lower $5,793.00, which is what builders actually pay. NOTE: the city's own "Sanitary Sewer Impact Fee" (e.g., $840.08 for 3/4" meter) is the city COLLECTION-system impact fee and is separate from and additive to the TSSD treatment impact fee. WHAT DOES NOT EXIST HERE: NO school impact fee — Utah law (Utah Impact Fees Act, UCA 11-36a) does not authorize school impact fees, and Alpine School District does not charge one. NO general/capital, library, open space, affordable housing, or stand-alone "drainage" impact fee beyond the Storm Drain impact fee listed. NO separate transportation/highway-district fee (roads handled by the city Roads Impact Fee). CAVEATS: The underlying impact fee facility plans/analyses on the city's Impact Fees page are dated 2017, but the DOLLAR AMOUNTS reported here are the currently adopted FY2025-26 figures from the master fee schedule (current). Pressurized irrigation is a service some lots use in lieu of culinary water for outdoor watering; both its impact fee ($0.42/irrigated sq ft) and its connection fee ($475 for 3/4") apply where PI service is provided. VERIFY: confirmed 23 of 23 rows; dropped 0. Independently re-read the full FY2025-26 Adopted Fee Schedule (sourceIndex 0) via reader proxy — every city impact-fee and hook-up-fee amount matches verbatim: Culinary Water 3/4"=$2,502.45, 1"=$4,179.09, 2"=$13,338.06 (fee schedule line ~285-288); Fire SFR=$429.30, MFR=$392.08 (line ~294-295); Parks SFR=$3,855.99, MFR=$3,064.51 (line ~299-300); Police SFR=$326.45, MFR=$216.55 (line ~302-303); Sanitary Sewer (collection) 3/4"=$840.08, 1"=$1,402.93 (line ~310-311); Roads SFR non-TOD=$3,548.30, SFR TOD=$3,016.05, MFR non-TOD=$2,003.07, MFR TOD=$1,702.61 (line ~326-329); Storm Drain=$0.1536/gross sq ft (line ~319); Pressurized Irrigation impact=$0.42/irrigated sq ft (line ~306); Water hook-up 0.750"=$475.00 (line ~350); Sewer hook-up=$235.00 (line ~357); PI hook-up 0.750"=$475.00 (line ~359); TSSD Sewer Impact Processing Fee=$15.00 (line ~323). TSSD treatment fee $5,793.00/ERU confirmed verbatim via search-engine snippet of the city Building Department page (host unreachable for direct fetch); TSSD max-allowable $7,023.05/ERU independently confirmed in the TSSD IFA PDF (sourceIndex 3). excludeFromTotal corrections: none — all flags already correct (larger meters, TOD variants, all multifamily rows, per-sqft Storm Drain and PI impact fees, and the PI connection fee are properly excluded; the 6 primary SFD per-unit rows plus Water $475 and Sewer $235 hook-ups are kept and do not double-count). Representative SFD fixed per-unit city total = $2,502.45 + $429.30 + $3,855.99 + $326.45 + $840.08 + $3,548.30 + $475.00 + $235.00 = $12,212.57 (sane); plus separate-district TSSD $5,793.00 + $15.00 processing = $18,020.57 all-in, before the per-sqft Storm Drain/PI impact fees and optional PI connection. CONFIDENCE DOWNGRADE: the TSSD treatment-fee row (sourceIndex 2) lowered from high to medium because it was confirmable only via a verbatim search-engine snippet (the city Building Department host timed out on direct fetch), though the snippet matched exactly and the TSSD PDF corroborates the ceiling.

Representative single_family_detached per-dwelling-unit city impact fees (additive): Culinary Water (3/4" meter) $2,502.45 + Fire $429.30 + Parks & Rec $3,855.99 + Police $326.45 + Sanitary Sewer city collection (3/4" meter) $840.08 + Roads non-TOD $3,548.30 = approx $11,502.57 in fixed per-unit city impact fees. Add additive connection/hook-up fees: Water $475.00 + Sewer $235.00 = $710.00 (Pressurized Irrigation connection $475.00 applies only on PI lots). Add separate-district TSSD sewer treatment impact fee $5,793.00/ERU (+ $15.00 city processing). Storm Drain ($0.1536/gross sq ft) and Pressurized Irrigation ($0.42/irrigated sq ft) impact fees are additional but vary by lot/area. Multifamily per-unit equivalents and larger-meter / TOD variants are included as excludeFromTotal rows. VERIFIED 2026-06-17: all amounts re-confirmed verbatim against the FY2025-26 Adopted Fee Schedule; TSSD treatment fee confirmed via Building Department snippet (medium confidence).

Sources

5 official sources · 21 high-confidence figures.

  1. 1American Fork City Adopted Fee Schedule - Effective July 1, 2025 (2026 Fee Schedule, adopted June 10, 2025)American Fork City · fee schedule · effective Jul 1, 2025 · retrieved Jun 17, 2026
  2. 2Impact Fees | American Fork, UT - Official WebsiteAmerican Fork City · municipal webpage · retrieved Jun 17, 2026
  3. 3Building Department | American Fork, UT (TSSD impact fee change notice: $5,931 to $5,793 effective Jan 1, 2026)American Fork City · municipal webpage · effective Jan 1, 2026 · retrieved Jun 17, 2026
  4. 4Timpanogos Special Service District Amended Sewer Impact Fee Analysis (Zions Public Finance, Aug/Dec 2025)Timpanogos Special Service District / Zions Public Finance, Inc. · fee study · effective Dec 1, 2025 · retrieved Jun 17, 2026
  5. 5TSSD Public Hearing Notice: January 22, 2026 - 2026 Impact Fee Enactment ResolutionTimpanogos Special Service District · government report · effective Jan 1, 2026 · retrieved Jun 17, 2026

American Fork impact fees — FAQ

How much are development impact fees in American Fork, UT for a single-family home?
As of 2026-06-17, total development fees for a single-family detached home in American Fork are about $12,228 per unit — roughly $8,160 in impact/development fees plus $4,068 in water/sewer connection fees. Figures are normalized from official sources; verify with the jurisdiction before relying on them.
Are impact fees in American Fork the same as building permit fees?
No. Impact fees (and water/sewer connection fees) fund off-site capital — roads, parks, schools, utilities — and are charged per new dwelling unit. Building permit and plan-review fees are separate and are not included here.
How often do American Fork's impact fees change?
Most jurisdictions adopt fees by ordinance and escalate them annually (often by a construction cost index), with occasional mid-year updates. Always confirm the current adopted schedule with the jurisdiction. ImpactFeeAtlas last verified American Fork on 2026-06-17.

More Utah jurisdictions