ImpactFeeAtlasCompare fees
TownUtah CountyVerified Jun 16, 2026

Vineyard, UT Development Impact Fees (2026)

Normalized development impact fees, water & sewer connection (tap/SDC) fees, and mitigation fees for Vineyard, Utah — per dwelling unit, by category, with links to every official source.

$14,862
Total per single-family home
impact + connection fees
$3,645
Impact / development fees
roads, parks, schools…
$11,217
Water & sewer connection
tap / capacity / SDC
Per multifamily unit
total fees / unit

What a single-family home pays in Vineyard

$14,862 total per unit across 4 fee categories.

  • Sewer connection (tap / SDC)$6,430
  • Water connection (tap / SDC)$4,787
  • Parks & recreation$3,423
  • Drainage / stormwater$222

Vineyard’s $14,862 is close to the Utah tracked median of $16,521.

Full fee schedule — single-family

Impact / development fees

Fee (local term)BasisAmountSource · effective
Transportation / roads
Roadway Facilities Impact Fee - Area A (citywide) — PRIMARY transportation/roadway impact fee for the main citywide Area A. Vineyard charges per ITE 'trip end,' NOT per dwelling unit. The published Consolidated Fee Schedule does not state a residential trips-per-dwelling-unit multiplier, so a clean per-dwelling-unit figure cannot be derived from the fee schedule alone (would require the residential ITE trip-generation rate from the Transportation Impact Fee Analysis, which could not be retrieved - utah.gov PDFs are geo/bot-blocked). amount is per trip end.
per trip$3,586Utah Public Notice Website / Vineyard City
Jan 1, 2026High
Transportation / roads
Roadway Facilities Impact Fee - Area B (RDA) — Mutually-exclusive geographic variant: lower roadway impact fee applies only in Area B (the Redevelopment Agency / RDA area). Area A (citywide) is the representative primary row. Excluded from total. Per ITE trip end, not per dwelling unit.
alternative · not added to total
per trip$1,286Utah Public Notice Website / Vineyard City
Jan 1, 2026High
Parks & recreation
Parks and Recreation Facilities Impact Fee — Parks impact fee charged per household (= per dwelling unit; 'Household as defined by US Census Bureau'). Applies to new residential development including single-family and multifamily per unit. This figure was updated in the June 11, 2025 fee-schedule amendment and remains current.
per dwelling unit$3,423Utah Public Notice Website / Vineyard City
Jan 1, 2026High
Drainage / stormwater
Storm and Ground Water Impact Fee - Area A — PRIMARY storm/ground water impact fee per ERU (= one single-family dwelling). Three mutually-exclusive drainage areas exist; Area A is used as the representative primary. Additional fee may apply to sites above the city's maximum impervious-area requirement. Stable across the 06.25.2025, 12.10.2025, and current schedules.
per dwelling unit$222Vineyard City (Utah)
Jan 1, 2026High
Drainage / stormwater
Storm and Ground Water Impact Fee - Area B — Mutually-exclusive drainage-area variant (Area B). Area A is the representative primary. Excluded from total.
alternative · not added to total
per dwelling unit$337Vineyard City (Utah)
Jan 1, 2026High
Drainage / stormwater
Storm and Ground Water Impact Fee - Area C — Mutually-exclusive drainage-area variant (Area C). Area A is the representative primary. Excluded from total.
alternative · not added to total
per dwelling unit$237Vineyard City (Utah)
Jan 1, 2026High

Water & sewer connection fees

Fee (local term)BasisAmountSource · effective
Water connection (tap / SDC)
Drinking Water Impact Fee — Vineyard City drinking-water impact fee. 3/4-inch water connection = 1 ERU = one single-family dwelling. Base ERU rate shown; larger meters scale per Table 19 of the Water Impact Fee Analysis. This figure was updated downward from the prior $4,708/ERU (June 2025 schedule) following an updated Water Impact Fee Analysis adopted in late 2025/early 2026. Multifamily is charged per ERU based on meter size / fixture demand.
per dwelling unit$4,207Utah Public Notice Website / Vineyard City
Jan 1, 2026High
Water connection (tap / SDC)
Drinking Water Impact Fee (prior June 2025 value, superseded) — SUPERSEDED. This was the drinking water impact fee in the 06.25.2025 adopted schedule. It was replaced by $4,207.49/ERU in the current schedule. Included for reference only; excluded from total.
alternative · not added to total
per dwelling unit$4,708Vineyard City (Utah)
Jun 25, 2025High
Sewer connection (tap / SDC)
Sewer Facilities Impact Fee (Vineyard local) — Vineyard City local sewer (collection) facilities impact fee per ERU (= one single-family dwelling). This is ADDITIVE to the regional wastewater-treatment pass-through fee charged by Timpanogos Special Service District (TSSD) and/or Orem Water Reclamation (see separate rows / pass-through note). Unchanged from the June 2025 schedule.
per dwelling unit$637Utah Public Notice Website / Vineyard City
Jan 1, 2026High
Sewer connection (tap / SDC)
Wastewater Treatment Impact Fee - Timpanogos Special Service District (pass-through) — SEPARATE DISTRICT pass-through. Vineyard's Consolidated Fee Schedule charges 'Timpanogos Special Service District Equal to District's impact fee as dictated [by] current Impact Fee Facilities [Plan].' TSSD provides regional wastewater treatment. Adopted residential fee = $5,793/ERU effective 1/1/2026 (down from $5,931). The TSSD Aug 2025 IFA computed a maximum allowable fee of $7,023.05/ERU for 2026 (gross $9,590.19 before credits), but the District adopted a lower fee. A builder pays this IN ADDITION to Vineyard's $637/ERU local sewer fee where the property drains to TSSD.
per dwelling unit$5,793American Fork City (Utah)
Jan 1, 2026Medium
Sewer connection (tap / SDC)
Wastewater Treatment Impact Fee - TSSD maximum allowable (alternative, not the adopted fee) — This is the MAXIMUM legally allowable TSSD sewer impact fee per ERU calculated in the Aug 29, 2025 Impact Fee Analysis, NOT the fee actually adopted/charged. The District adopted the lower $5,793/ERU (separate row). Excluded from total to avoid double counting.
alternative · not added to total
per dwelling unit$7,023Timpanogos Special Service District
Jan 1, 2026Medium
Water connection (tap / SDC)
Water Meter & Connection Fee - 3/4" (physical meter/connection, separate from impact fee) — Physical water meter & connection (tap) fee for the base residential 3/4-inch meter. This is the meter installation/connection charge, SEPARATE from and IN ADDITION TO the $4,207.49/ERU drinking-water IMPACT fee. Larger meters: 1" = $795, 1.5" = $1,240, 2" = $1,930 (excluded variants).
per meter$580Vineyard City (Utah)
Jun 25, 2025High
Water connection (tap / SDC)
Water Meter & Connection Fee - 1" (variant) — Larger-meter variant. Base residential 3/4-inch meter ($580) is the representative primary. Excluded from total.
alternative · not added to total
per meter$795Vineyard City (Utah)
Jun 25, 2025High

Coverage & caveats

Vineyard is an incorporated town/city in Utah County, UT. Its development impact fees are set in the adopted Consolidated Fee Schedule (CFS). The CFS lists exactly FIVE Vineyard impact-fee categories, all assessed at building-permit issuance and based on Equivalent Residential Units (ERU; a 3/4-inch water connection = 1 ERU = one single-family dwelling): (1) Drinking Water $4,207.49/ERU (current; updated down from $4,708/ERU in the June 2025 schedule per an updated Water Impact Fee Analysis); (2) Sewer Facilities $637/ERU (local collection only); (3) Roadway/Transportation, charged per ITE trip end ($3,586/trip end Area A citywide; $1,286/trip end Area B/RDA); (4) Storm & Ground Water, per ERU by area ($222 Area A / $337 Area B / $237 Area C); (5) Parks & Recreation $3,422.88 per household. WATER & SEWER STRUCTURE: Vineyard's local sewer fee ($637/ERU) is ADDITIVE to a regional wastewater-treatment PASS-THROUGH charged by a SEPARATE DISTRICT - Timpanogos Special Service District (TSSD), whose adopted residential fee is $5,793/ERU effective 1/1/2026 (down from $5,931; TSSD's max allowable was $7,023.05/ERU). The CFS also lists pass-throughs for 'Orem Water Reclamation' (sewer treatment for properties served by Orem) and 'Orem Water Rights' (each 'Equal to Orem City's ... current ... fee') - exact Orem per-ERU dollar amounts could NOT be verified (Orem's published doc was an ACFR-style impact-fee fund report, not a clean per-ERU schedule), so those rows are OMITTED rather than guessed. The physical water meter/connection (tap) fee ($580 for a 3/4-inch meter) is separate from and additive to the water impact fee. WHAT DOES NOT EXIST IN VINEYARD: NO school impact fee (prohibited statewide in Utah; Alpine School District / its successor cannot levy impact fees); NO fire impact fee, NO police/public-safety impact fee (Vineyard contracts fire service - 'Fire Inspection Equal to Orem Fire's fee' - and the CFS impact-fee section contains no fire or police line); NO library impact fee; NO general/capital-facilities impact fee; NO affordable-housing, open-space, or mitigation impact fee. CAVEATS: (a) Transportation is published per ITE trip end, not per dwelling unit; the CFS does not state a residential trips-per-DU multiplier, so a clean per-DU transportation figure cannot be derived from the fee schedule alone - the underlying Transportation IFA (which would give the residential trip rate) is on utah.gov PDFs that are CloudFront geo/bot-blocked and could not be retrieved. (b) Vineyard's own .gov and .org websites and all utah.gov public-notice PDFs return 403/CloudFront geo-blocks to automated fetching; figures were obtained from the directly-downloaded adopted CFS PDF (06.25.2025 redline, hosted on the city's CivicPlus/Revize CMS) and cross-confirmed via verbatim search-engine snippets of the current utah.gov public-notice CFS documents (files 1330261/1283501) showing the updated $4,207.49 water fee with all other figures unchanged. (c) Vineyard adopted further CFS amendments (12.10.2025 'Passed' and 04.07.2026 redline); the only impact-fee change identified versus June 2025 is the drinking-water fee ($4,708 -> $4,207.49); roadway, storm, parks, and sewer impact fees were stable across all 2025-2026 versions reviewed.

Representative single-family detached (~2,000-2,500 sq ft) residence connecting via a standard 3/4-inch meter (= 1 ERU = 1 household) in the citywide Area A. Vineyard-levied impact fees that are additive for a typical SFD: Drinking Water $4,207.49 + Sewer (local) $637 + Storm/Ground Water (Area A) $222 + Parks $3,422.88 = $8,489.37, PLUS the Roadway impact fee (charged per ITE trip end at $3,586/trip end - not included in this subtotal because the fee schedule gives no residential trip-end-per-unit factor), PLUS the physical 3/4-inch water meter/connection fee $580. SEPARATE-DISTRICT pass-through (additive, paid by the builder): Timpanogos Special Service District wastewater-treatment impact fee $5,793/ERU (eff. 1/1/2026) where the property drains to TSSD. Orem Water Reclamation and Orem Water Rights pass-throughs also apply (amounts not verified; equal to Orem City's current fees). Variants marked excludeFromTotal: superseded $4,708 water fee; Area B/RDA roadway ($1,286/trip end); Storm Areas B ($337) and C ($237); larger water meters (1\"=$795, etc.); TSSD maximum-allowable $7,023.05 (vs adopted $5,793). Utah charges NO school, fire, police, library, general, affordable-housing, open-space, or mitigation impact fees in Vineyard.

Sources

6 official sources · 11 high-confidence figures.

  1. 1Vineyard City Consolidated Fee Schedule (Amendments 06.25.2025 Redline)Vineyard City (Utah) · fee schedule · effective Jun 25, 2025 · retrieved Jun 16, 2026
  2. 2Vineyard City Consolidated Fee Schedule - Impact Fees (Public Notice, current schedule showing $4,207.49/ERU water)Utah Public Notice Website / Vineyard City · fee schedule · effective Jan 1, 2026 · retrieved Jun 16, 2026
  3. 3Vineyard City Council Notice - Consolidated Fee Schedule Impact Fee table (Roadway, Storm, Parks, Sewer per ERU)Utah Public Notice Website / Vineyard City · fee schedule · effective Dec 10, 2025 · retrieved Jun 16, 2026
  4. 4Timpanogos Special Service District Amended Sewer Impact Fee Analysis (Aug 29, 2025)Timpanogos Special Service District · fee study · effective Jan 1, 2026 · retrieved Jun 16, 2026
  5. 5American Fork Building Department - TSSD impact fee notice (fee decreasing from $5,931 to $5,793 effective Jan 1, 2026)American Fork City (Utah) · municipal webpage · effective Jan 1, 2026 · retrieved Jun 16, 2026
  6. 6Vineyard adopts consolidated fee changes; parks impact fee and concessions rates updated (June 11, 2025 council meeting)Citizen Portal AI · news article · effective Jun 11, 2025 · retrieved Jun 16, 2026

Vineyard impact fees — FAQ

How much are development impact fees in Vineyard, UT for a single-family home?
As of 2026-06-16, total development fees for a single-family detached home in Vineyard are about $14,862 per unit — roughly $3,645 in impact/development fees plus $11,217 in water/sewer connection fees. Figures are normalized from official sources; verify with the jurisdiction before relying on them.
Are impact fees in Vineyard the same as building permit fees?
No. Impact fees (and water/sewer connection fees) fund off-site capital — roads, parks, schools, utilities — and are charged per new dwelling unit. Building permit and plan-review fees are separate and are not included here.
How often do Vineyard's impact fees change?
Most jurisdictions adopt fees by ordinance and escalate them annually (often by a construction cost index), with occasional mid-year updates. Always confirm the current adopted schedule with the jurisdiction. ImpactFeeAtlas last verified Vineyard on 2026-06-16.

More Utah jurisdictions