ImpactFeeAtlasCompare fees
CityUtah CountyVerified Jun 16, 2026

Lehi, UT Development Impact Fees (2026)

Normalized development impact fees, water & sewer connection (tap/SDC) fees, and mitigation fees for Lehi, Utah — per dwelling unit, by category, with links to every official source.

$12,517
Total per single-family home
impact + connection fees
$4,232
Impact / development fees
roads, parks, schools…
$8,285
Water & sewer connection
tap / capacity / SDC
Per multifamily unit
total fees / unit

What a single-family home pays in Lehi

$12,517 total per unit across 6 fee categories.

  • Sewer connection (tap / SDC)$6,665
  • Parks & recreation$2,773
  • Water connection (tap / SDC)$1,620
  • Transportation / roads$1,163
  • Fire / EMS$198
  • Police$98.35

At $12,517, Lehi is below the Utah tracked median of $16,521 — relatively affordable to build in.

Full fee schedule — single-family

Impact / development fees

Fee (local term)BasisAmountSource · effective
Transportation / roads
Transportation (Roads) Impact Fee — FY2020 fee amount, still in force per the March 2, 2026 schedule. No connection fee (Not Applicable).
per dwelling unit$1,163Lehi City Corporation
Jul 1, 2019Highdated 2019
Parks & recreation
Parks and Recreation Impact Fee — FY2020 fee amount. No connection fee (Not Applicable).
per dwelling unit$2,773Lehi City Corporation
Jul 1, 2019Highdated 2019
Fire / EMS
Fire/EMT Impact Fee — FY2020 fee amount. Non-residential is $126.73 per building KSF.
per dwelling unit$198Lehi City Corporation
Jul 1, 2019Highdated 2019
Police
Police Impact Fee — FY2020 fee amount. Non-residential is $96.67 per building KSF.
per dwelling unit$98.35Lehi City Corporation
Jul 1, 2019Highdated 2019
Drainage / stormwater
Storm Drain Impact Fee (per acre, all uses) — Assessed per acre (0.25-acre minimum), not per dwelling unit — excluded from per-unit total. A typical SFD lot of ~0.2-0.25 acre would pay roughly the 0.25-acre minimum (~$348). Connection fee Not Applicable.
alternative · not added to total
per acre$1,391Lehi City Corporation
Jul 1, 2019Highdated 2019
Other
Electric Power Impact Fee (residential 200A single-phase, FY2026) — Lehi is a municipal electric utility. Power impact fee scales with service size (100A=$1,596, 125A=$1,915, 150A=$2,234, 200A=$2,554, 400A=$4,469). Representative new SFD ~200A service shown. Per-service, treated as per dwelling unit equivalent.
$2,554Lehi City Corporation
Jul 1, 2025High
Other
Electric Power Connection Fee (residential up to 200A self-contained) — Additive electric connection fee for a new residential service up to 200A. 201-400A is $442.02.
$374Lehi City Corporation
Mar 2, 2026High

Water & sewer connection fees

Fee (local term)BasisAmountSource · effective
Water connection (tap / SDC)
Culinary Water Impact Fee (3/4" residential meter) — Residential 3/4" meter base (primary). Larger meters are non-residential (1"=$3,184.19, 1.5"=$3,980.23, 2"=$12,736.75, etc.) and omitted as non-residential variants.
per dwelling unit$1,194Lehi City Corporation
Jul 1, 2019Highdated 2019
Water connection (tap / SDC)
Culinary Water Connection Fee (3/4" meter) — Additive physical-connection fee on top of the water impact fee. 3/4" residential meter used as primary; other meter sizes (1"=$514.67, 1.5"=$1,691.38, 2"=$2,713.39, etc.) omitted as larger-meter variants.
per meter$426Lehi City Corporation
Mar 2, 2026High
Sewer connection (tap / SDC)
Lehi City Sewer Impact Fee (local, 3/4" residential) — Lehi's LOCAL sewer collection impact fee (connection fee Not Applicable). This is in ADDITION to the Timpanogos SSD regional treatment impact fee. Larger meters are non-residential and omitted.
per dwelling unit$872Lehi City Corporation
Jul 1, 2019Highdated 2019
Sewer connection (tap / SDC)
Timpanogos Special Service District — Regional Sewer Treatment Impact Fee (separate district) — SEPARATE DISTRICT fee (Timpanogos Special Service District, regional wastewater treatment) collected by/through Lehi on a builder in Lehi. FY2026 amount. Multi-family/multi-unit residential is also $5,793.00 per dwelling unit. Additive to Lehi's local sewer impact fee of $872.44.
per dwelling unit$5,793Lehi City Corporation
Jul 1, 2025High
Water connection (tap / SDC)
Pressurized (Secondary) Irrigation Impact Fee (per acre, residential) — Secondary (irrigation) water impact fee, assessed per acre with 0.25-acre minimum — excluded from per-unit total. A typical SFD lot pays roughly the 0.25-acre minimum (~$1,402). Applies where PI service is available.
alternative · not added to total
per acre$5,609Lehi City Corporation
Jul 1, 2019Highdated 2019
Water connection (tap / SDC)
Pressurized Irrigation Connection Fee (1" meter) — Physical PI connection fee; smallest published meter is 1" ($541.66). Excluded from base SFD total as it applies only where PI is provided. Larger meters omitted.
alternative · not added to total
per meter$542Lehi City Corporation
Mar 2, 2026High

Coverage & caveats

All residential impact and connection fees were taken from the official "Lehi City Connection and Impact Fees, Updated March 2, 2026" PDF hosted on lehi-ut.gov — the city's current authoritative schedule. Most categories carry a "FY 2020 Fee Amount" header, meaning Lehi has not escalated these impact-fee amounts since its FY2020 impact fee analysis; they remain the rates in force per the March 2026 document. CATEGORIES FOUND (residential, per dwelling unit unless noted): Transportation/roads ($1,163 SFD / $708 MF), Parks & Recreation ($2,772.98 SFD / $2,415.41 MF), Fire/EMT ($198.02 SFD / $81.98 MF), Police ($98.35 SFD / $117.03 MF), Culinary Water impact ($1,194.07 at 3/4" residential meter) plus a water CONNECTION fee ($425.62 at 3/4"), Local Lehi Sewer impact ($872.44 at 3/4" residential), Storm Drain ($1,391.00 per acre, all uses — billed per acre not per unit), and Pressurized (secondary) Irrigation impact ($5,609.36 per acre residential, 0.25-acre minimum) with a PI connection fee ($541.66 at 1" meter). Lehi is a municipal electric utility, so an Electric Power connection fee ($374.02 residential up to 200A) and a Power Impact Fee (FY2026: $2,554 for a 200A single-phase residential service) also apply to new homes. SEPARATE DISTRICT: Timpanogos Special Service District (regional sewer treatment plant) charges a sewer impact fee of $5,793.00 per single-family house / per dwelling unit (FY 2026). This is collected on top of Lehi's own local sewer impact fee of $872.44 and is paid by a builder in Lehi — attributed in that row's notes. WHAT DOES NOT EXIST HERE: NO SCHOOL IMPACT FEE — Utah law does not authorize school impact fees (schools are funded via property tax by Alpine School District / its successor districts, not impact fees). No library, no open space, no affordable housing, and no general/capital or mitigation impact fee line items appear on Lehi's schedule. Sewer, storm drain, transportation, parks, fire, police, and Timpanogos sewer have "Connection Fee: Not Applicable" — only an impact fee applies; water, pressurized irrigation, and electric power have BOTH a connection fee and an impact fee. ADU CAVEAT: Per Utah HB 462 (2022), Lehi can no longer collect impact fees on INTERNAL accessory dwelling units (e.g., basement apartments). No separate ADU impact-fee row is published; an internal ADU is impact-fee-exempt by statute. Detached ADUs may be treated as additional dwelling units — not separately published, so omitted. NORMALIZATION: Water and local sewer impact fees are tiered by meter size; the residential base 3/4" meter is used as the primary per_dwelling_unit row, with larger meter sizes (non-residential) omitted. Single-family detached is primary; multifamily per-unit rows are included as additive same-category alternatives (not excluded, since a project is one OR the other — multifamily rows are marked excludeFromTotal=true so a single-family total is not double-counted). Storm drain and pressurized irrigation are assessed per acre, not per unit, so they are included with excludeFromTotal=true and a note (a typical ~0.2-0.25 acre SFD lot would pay roughly the 0.25-acre minimum). Power impact fee for a representative 200A residential service shown. CONFIDENCE: High for all rows — exact verbatim quotes from the current official March 2, 2026 city document. Population is the 2024 Census ACS 5-yr estimate (~85,173); the city is growing fast (2026 projections ~96k-102k).

Lehi impact fees are largely held at FY2020 amounts per the March 2, 2026 schedule. A representative new single-family detached home in Lehi pays, at minimum, the following ADDITIVE impact fees (per dwelling unit): Transportation $1,163.00 + Parks & Rec $2,772.98 + Fire/EMT $198.02 + Police $98.35 + Culinary Water impact $1,194.07 + Local Lehi Sewer impact $872.44 + Timpanogos SSD regional sewer $5,793.00 = $12,091.86 in per-unit impact fees, PLUS per-acre Storm Drain ($1,391.00/acre, 0.25-acre min) and Pressurized Irrigation ($5,609.36/acre, 0.25-acre min), PLUS connection fees (water $425.62, PI $541.66, electric $374.02) and an electric Power Impact Fee (~$2,554 for 200A). Exact totals depend on lot size and meter/service sizing. Multifamily figures are per-unit and shown separately.

Sources

4 official sources · 17 high-confidence figures.

  1. 1Lehi City Connection and Impact Fees (Updated March 2, 2026)Lehi City Corporation · fee schedule · effective Mar 2, 2026 · retrieved Jun 16, 2026
  2. 2Lehi City FY 2026 Fee Schedule (Approved)Lehi City Corporation · fee schedule · effective Jul 1, 2025 · retrieved Jun 16, 2026
  3. 3City of Lehi can no longer collect impact fees for internal units (HB 462)FOX 13 News (KSTU) · news article · retrieved Jun 16, 2026
  4. 4U.S. Census Bureau QuickFacts: Lehi city, UtahU.S. Census Bureau · government report · retrieved Jun 16, 2026

Lehi impact fees — FAQ

How much are development impact fees in Lehi, UT for a single-family home?
As of 2026-06-16, total development fees for a single-family detached home in Lehi are about $12,517 per unit — roughly $4,232 in impact/development fees plus $8,285 in water/sewer connection fees. Figures are normalized from official sources; verify with the jurisdiction before relying on them.
Are impact fees in Lehi the same as building permit fees?
No. Impact fees (and water/sewer connection fees) fund off-site capital — roads, parks, schools, utilities — and are charged per new dwelling unit. Building permit and plan-review fees are separate and are not included here.
How often do Lehi's impact fees change?
Most jurisdictions adopt fees by ordinance and escalate them annually (often by a construction cost index), with occasional mid-year updates. Always confirm the current adopted schedule with the jurisdiction. ImpactFeeAtlas last verified Lehi on 2026-06-16.

More Utah jurisdictions