Queen Creek, AZ Development Impact Fees (2026)

A new single-family home in Queen Creek, Arizona pays about $13,038 in total development impact and water/sewer connection fees per unit as of Jun 16, 2026 — about $4,512 in impact/development fees plus $8,526 in water & sewer connection (tap/SDC) fees. Every figure below is normalized per dwelling unit by category, with a link to its official source.

$13,038
Total per single-family home
impact + connection fees
$4,512
Impact / development fees
roads, parks, schools…
$8,526
Water & sewer connection
tap / capacity / SDC
$8,007
Per multifamily unit
total fees / unit

What a single-family home pays in Queen Creek

$13,038 total per unit across 6 fee categories.

  • Sewer connection (tap / SDC)$6,144
  • Water connection (tap / SDC)$2,382
  • Parks & recreation$2,061
  • Transportation / roads$1,189
  • Fire / EMS$840
  • Police$422

At $13,038, Queen Creek is below the Arizona tracked median of $15,719 — relatively affordable to build in.

Full fee schedule — single-family detached

Impact / development fees

Fee (local term)BasisAmountSource · effective
Parks & recreation
Parks Facilities Development Fee — Flat per-unit, not tiered by home size. Development fee under ARS 9-463.05 (parks & recreation). Confirmed by rendering image-only PDF doc 40036 to PNG; same figure also in text-layer doc 40782.
per dwelling unit$1,933Town of Queen Creek
May 12, 2025High
Parks & recreation
Trails Development Fee — Separate Trails line item under parks/recreation; additive to Parks Facilities. Confirmed visually + text-layer cross-check.
per dwelling unit$128Town of Queen Creek
May 12, 2025High
Police
Police Facilities Development Fee — 'Public safety' category under ARS 9-463.05(D). Confirmed visually + text-layer cross-check.
per dwelling unit$422Town of Queen Creek
May 12, 2025High
Transportation / roads
Street Facilities Development Fee — Transportation category under ARS 9-463.05(D). Confirmed visually + text-layer cross-check.
per dwelling unit$1,189Town of Queen Creek
May 12, 2025High
Fire / EMS
Fire Facilities Development Fee — Fire category under ARS 9-463.05(D). Confirmed visually + text-layer cross-check.
per dwelling unit$840Town of Queen Creek
May 12, 2025High

Water & sewer connection fees

Fee (local term)BasisAmountSource · effective
Water connection (tap / SDC)
Water Capacity Fee (3/4" meter) — Base residential 3/4" (0.75") meter. Water capacity fee is the same for all uses ('ALL'). Collected at building permit issuance, in addition to meter install fees. Confirmed verbatim in doc 40782 text layer: 0.75 Displacement row, WATER CAPACITY FEE ALL column = $2,382.
per meter$2,382Town of Queen Creek
Jan 5, 2026High
Sewer connection (tap / SDC)
Sewer (Wastewater) Capacity Fee (3/4" meter, residential) — Base residential 3/4" meter. Confirmed verbatim in doc 40782 text layer: 0.75 Displacement row, SEWER CAPACITY FEE RESIDENTIAL column = $6,144 (effective Jan 5, 2026).
per meter$6,144Town of Queen Creek
Jan 5, 2026High
Water connection (tap / SDC)
Water Capacity Fee (1" meter) - variant — Mutually-exclusive larger meter variant; correctly excluded. Confirmed in doc 40782 text layer: 1.00 Displacement row, WATER CAPACITY FEE ALL = $3,978.
alternative · not added to total
per meter$3,978Town of Queen Creek
Jan 5, 2026High
Sewer connection (tap / SDC)
Sewer Capacity Fee (1" meter, residential) - variant — Mutually-exclusive larger meter variant; correctly excluded. Confirmed in doc 40782 text layer: 1.00 Displacement row, SEWER CAPACITY FEE RESIDENTIAL = $6,144 (same as 0.75").
alternative · not added to total
per meter$6,144Town of Queen Creek
Jan 5, 2026High

Multifamily (per unit) impact fees in Queen Creek

About $8,007 per unit ($3,399 impact + $4,608 water/sewer connection).

Impact / development fees

Fee (local term)BasisAmountSource · effective
Parks & recreation
Parks Facilities Development Fee — Per multifamily unit (2+ Multi-Family). Confirmed visually + text-layer cross-check.
per dwelling unit$1,510Town of Queen Creek
May 12, 2025High
Parks & recreation
Trails Development Fee — Per multifamily unit. Confirmed visually + text-layer cross-check.
per dwelling unit$100Town of Queen Creek
May 12, 2025High
Police
Police Facilities Development Fee — Per multifamily unit. Confirmed visually + text-layer cross-check.
per dwelling unit$330Town of Queen Creek
May 12, 2025High
Transportation / roads
Street Facilities Development Fee — Per multifamily unit. Confirmed visually + text-layer cross-check.
per dwelling unit$803Town of Queen Creek
May 12, 2025High
Fire / EMS
Fire Facilities Development Fee — Per multifamily unit. Confirmed visually + text-layer cross-check.
per dwelling unit$656Town of Queen Creek
May 12, 2025High

Water & sewer connection fees

Fee (local term)BasisAmountSource · effective
Sewer connection (tap / SDC)
Sewer (Wastewater) Capacity Fee (multifamily per unit) — Multifamily sewer capacity fee billed per dwelling unit (schedule note 3). Quote confirmed verbatim in doc 40782 text layer.
per dwelling unit$4,608Town of Queen Creek
Jan 5, 2026High

Coverage & caveats

Queen Creek, AZ (Maricopa County) levies development/impact fees as "development fees" under ARS 9-463.05, plus separate water and wastewater (sewer) "capacity fees." TWO distinct schedules apply and BOTH are included as additive, current fees a residential builder pays: 1) DEVELOPMENT FEE SCHEDULE — effective May 12, 2025 (5-year study cycle; do not escalate). Per the Town's adopted schedule, the infrastructure improvements plan covers exactly these necessary public services under ARS 9-463.05(D): parks & recreation, transportation (streets), fire, and public safety (police). The fee schedule itemizes these as five line items: Parks Facilities, Trails, Police Facilities, Street Facilities, Fire Facilities. For Single Family Detached (PRIMARY land use, flat per-unit, NOT tiered by home size): Parks $1,933 + Trails $128 + Police $422 + Streets $1,189 + Fire $840 = $4,512/unit. For 2+ Multi-Family: Parks $1,510 + Trails $100 + Police $330 + Streets $803 + Fire $656 = $3,399/unit. 2) CAPACITY FEE SCHEDULE — effective Jan 5, 2026. Water and wastewater capacity fees are charged by water METER size and are collected at building permit issuance, IN ADDITION TO meter installation fees. Using the base residential 3/4" (0.75") meter: Water Capacity Fee = $2,382; Residential Sewer Capacity Fee = $6,144. Multi-Family units are assessed a sewer capacity fee of $4,608/unit (per schedule note 3). Other meter sizes (1", 1.5", 2"+) are mutually-exclusive variants of the same fee and are excluded from the primary total. Water capacity fee is the same for residential and non-residential ("ALL").

Categories that do not exist here

NO school impact fee (not an authorized category under Arizona law). NO library, NO drainage/stormwater, NO open space, NO affordable housing, NO general/capital, and NO standalone mitigation impact fee — the ARS 9-463.05 plan is limited to parks/recreation, transportation, fire, and public safety (police). No separate highway/road district or independent water/sewer district levies a builder fee here — water and sewer are Town-operated utilities. NOT INCLUDED (out of scope): construction permit fees and plan review fees (valuation-based); the $500 meter cost, $25 meter installation/est fee, and $125 security deposit (service/connection administrative charges, not impact/capacity fees). Diversified Water Utility service area has its own separate rates and is not the primary Town schedule.

Verify

confirmed 15 of 15 rows; dropped 0. Both source PDFs were independently re-retrieved using full browser headers + Sec-Ch-Ua client hints (Akamai 403-blocks simple requests, confirming the researcher's caveat). Doc 40782 (effective Jan 5, 2026) contains BOTH the Capacity Fee Schedule AND the Development Fee Schedule — its development fee figures are byte-for-byte identical to the May-12-2025 image-only PDF (doc 40036), giving an extra cross-check that the development fees remain current. Doc 40036 is image-only and was confirmed by rendering to PNG and reading visually: SFD Parks $1,933 / Trails $128 / Police $422 / Streets $1,189 / Fire $840 and MF Parks $1,510 / Trails $100 / Police $330 / Streets $803 / Fire $656 all confirmed exactly. Capacity PDF text layer confirms 0.75" meter: Water ALL $2,382, Sewer Residential $6,144; 1.00" meter: Water ALL $3,978, Sewer Residential $6,144; and verbatim note "(3) Multi-Family units are assessed sewer capacity fees of $4,608.00 per unit." The capacity-fee sourceQuotes are tabular reconstructions (column labels + row value) but every label and number is present and correct in the source. Webpage sources (indices 2,3,4) return HTTP 403 via WebFetch and could not be re-confirmed live; however they are cited only as overview/cross-checks and are NOT the source for any numeric fee row (all rows cite sourceIndex 0 or 1, both fully confirmed). excludeFromTotal corrections: none needed — the two 1"-meter variant rows are correctly flagged excludeFromTotal=true; the 0.75" water+sewer and all development-fee rows are correctly retained in the primary total (no double-counting; SFD all-in primary = $4,512 development + $2,382 water + $6,144 sewer = $13,038/unit).

Two effective dates: Development (impact) fees effective May 12, 2025; Water/Sewer capacity fees effective Jan 5, 2026. The development fee PDF (doc 40036) is an image-only PDF, confirmed by rendering to PNG and reading visually; the same development fee figures also appear in the text-layer doc 40782 (effective Jan 5, 2026), confirming they remain current. Capacity fee figures were extracted from the text-layer Capacity Fee Schedule PDF (doc 40782). SFD development fee total = $4,512/unit (additive across all five categories). All capacity fees use the base residential 3/4" meter; larger meter rows are excluded as mutually-exclusive variants.

Sources

5 official sources · 15 high-confidence figures.

  1. 1Town of Queen Creek Development Fee Schedule (Effective May 12, 2025)Town of Queen Creek · fee schedule · effective May 12, 2025 · retrieved Jun 16, 2026
  2. 2Town of Queen Creek Capacity Fee Schedule & Development Fee Schedule (Effective January 5, 2026)Town of Queen Creek · fee schedule · effective Jan 5, 2026 · retrieved Jun 16, 2026
  3. 3Water Rates and Fees (Meter Installation & Capacity Charges)Town of Queen Creek · municipal webpage · effective Jan 5, 2026 · retrieved Jun 16, 2026
  4. 4Development Services Fee Schedule page (impact & capacity fee overview)Town of Queen Creek · municipal webpage · retrieved Jun 16, 2026
  5. 5Impact Fees / Impact Fee Focus Group (ARS 9-463.05 services list & studies)Town of Queen Creek · government report · retrieved Jun 16, 2026

Queen Creek impact fees — FAQ

How much are development impact fees in Queen Creek, AZ for a single-family home?
As of 2026-06-16, total development fees for a single-family detached home in Queen Creek are about $13,038 per unit — roughly $4,512 in impact/development fees plus $8,526 in water/sewer connection fees. Figures are normalized from official sources; verify with the jurisdiction before relying on them.
What are the impact fees per multifamily unit in Queen Creek, AZ?
Total development fees for a multifamily unit in Queen Creek are about $8,007 per unit as of 2026-06-16.
Are impact fees in Queen Creek the same as building permit fees?
No. Impact fees (and water/sewer connection fees) fund off-site capital — roads, parks, schools, utilities — and are charged per new dwelling unit. Building permit and plan-review fees are separate and are not included here.
How often do Queen Creek's impact fees change?
Most jurisdictions adopt fees by ordinance and escalate them annually (often by a construction cost index), with occasional mid-year updates. Always confirm the current adopted schedule with the jurisdiction. ImpactFeeAtlas last verified Queen Creek on 2026-06-16.