New Braunfels, TX Development Impact Fees (2026)
A new single-family home in New Braunfels, Texas pays about $33,884 in total development impact and water/sewer connection fees per unit as of Jun 16, 2026 — about $8,192 in impact/development fees plus $25,692 in water & sewer connection (tap/SDC) fees. Every figure below is normalized per dwelling unit by category, with a link to its official source.
What a single-family home pays in New Braunfels
$33,884 total per unit across 3 fee categories.
- Water connection (tap / SDC)$19,448
- Transportation / roads$8,192
- Sewer connection (tap / SDC)$6,244
New Braunfels’s $33,884 is about 2.0× the Texas tracked median of $16,912 — among the higher-cost places to build in the state.
Full fee schedule — single-family detached
Impact / development fees
| Fee (local term) | Basis | Amount | Source · effective |
|---|---|---|---|
Transportation / roads Roadway Impact Fee (City) - Single-Family Detached, Service Area 6 (representative) — VERIFIED: City of New Braunfels Roadway Impact Fee, Chapter 100 / Ordinance 2022-87, Exhibit 2 collected fees for final plats on/after March 1, 2023, confirmed exact - SF Detached (ITE 210, 4.61 veh-mi/DU): SA1 $4,914, SA2 $1,471, SA3 $2,328, SA4 $10,829, SA5 $6,320, SA6 $8,192 per dwelling unit. Fee varies by SIX mutually-exclusive service areas (a parcel is in exactly one). SA6 ($8,192) used as a mid-high representative for the primary total; ACTUAL fee depends on the development's service area (range $1,471-$10,829 per SF unit). Other 5 service-area variants included below with excludeFromTotal=true (correct - no double-counting). | per dwelling unit | $8,192 | City of New Braunfels Mar 1, 2023High |
Transportation / roads Roadway Impact Fee - Single-Family Detached, Service Area 1 — VERIFIED exact in Exhibit 2 table. Mutually-exclusive alternative service area. Roadway impact fee for SF detached in Service Area 1 = $4,914/DU. Correctly excluded from total (SA6 used as primary representative). alternative · not added to total | per dwelling unit | $4,914 | City of New Braunfels Mar 1, 2023High |
Transportation / roads Roadway Impact Fee - Single-Family Detached, Service Area 2 — VERIFIED exact in Exhibit 2 table. Mutually-exclusive alternative service area. Roadway impact fee for SF detached in Service Area 2 = $1,471/DU (lowest of the six areas). Correctly excluded from total. alternative · not added to total | per dwelling unit | $1,471 | City of New Braunfels Mar 1, 2023High |
Transportation / roads Roadway Impact Fee - Single-Family Detached, Service Area 3 — VERIFIED exact in Exhibit 2 table. Mutually-exclusive alternative service area. Roadway impact fee for SF detached in Service Area 3 = $2,328/DU. Correctly excluded from total. alternative · not added to total | per dwelling unit | $2,328 | City of New Braunfels Mar 1, 2023High |
Transportation / roads Roadway Impact Fee - Single-Family Detached, Service Area 4 — VERIFIED exact in Exhibit 2 table. Mutually-exclusive alternative service area. Roadway impact fee for SF detached in Service Area 4 = $10,829/DU (highest of the six areas). Correctly excluded from total. alternative · not added to total | per dwelling unit | $10,829 | City of New Braunfels Mar 1, 2023High |
Transportation / roads Roadway Impact Fee - Single-Family Detached, Service Area 5 — VERIFIED exact in Exhibit 2 table. Mutually-exclusive alternative service area. Roadway impact fee for SF detached in Service Area 5 = $6,320/DU. Correctly excluded from total. alternative · not added to total | per dwelling unit | $6,320 | City of New Braunfels Mar 1, 2023High |
Water & sewer connection fees
| Fee (local term) | Basis | Amount | Source · effective |
|---|---|---|---|
Water connection (tap / SDC) Water Impact Fee (NBU) - per LUE — VERIFIED: SCHEDULE 3 (Impact Fees To Be Collected) of the NBU Impact Fee Policy confirmed exact - Water $19,448.00 per LUE for plats recorded after January 31, 2023 or development without platting. 2023 NBU Impact Fee Report meter table (line: 5/8" meter = 1.0 LUE = $19,448 water) confirms a single-family detached home on a standard 5/8" x 3/4" meter = 1.0 LUE = $19,448 per dwelling unit. Schedule 3 (collected) equals Schedule 2 (maximum), confirming NBU collects at 100% of the maximum assessable fee. Charged by New Braunfels Utilities (NBU), the separate municipally-owned water/wastewater utility for the City of New Braunfels service area - a builder in the city must pay this. | per dwelling unit | $19,448 | New Braunfels Utilities (NBU) Feb 1, 2023High |
Sewer connection (tap / SDC) Wastewater Impact Fee (NBU) - per LUE — VERIFIED: SCHEDULE 3 of the NBU Impact Fee Policy confirmed exact - Wastewater $6,244.00 per LUE. Single-family detached on 5/8" x 3/4" meter = 1.0 LUE = $6,244 wastewater impact fee per dwelling unit (confirmed in 2023 NBU Impact Fee Report meter-size table: 5/8" meter, 1.0 LUE, $19,448 + $6,244 = $25,692 total). NBU collects at 100% of maximum (Schedule 3 = Schedule 2). Charged by New Braunfels Utilities (NBU), the separate municipal utility. | per dwelling unit | $6,244 | New Braunfels Utilities (NBU) Feb 1, 2023High |
Multifamily (per unit) impact fees in New Braunfels
Impact / development fees
| Fee (local term) | Basis | Amount | Source · effective |
|---|---|---|---|
Transportation / roads Roadway Impact Fee (City) - Multifamily (Mid-Rise default), Service Area 6 (representative) — VERIFIED exact in Exhibit 2 table. City Roadway Impact Fee for multifamily (ITE 221 Mid-Rise, the default multifamily, 2.05 veh-mi/DU), per unit, for plats on/after March 1, 2023: SA1 $2,185, SA2 $654, SA3 $1,035, SA4 $4,815, SA5 $2,811, SA6 $3,643. SA6 shown as representative. Correctly excluded from the single-family-based total (separate land use). For a multifamily project, ALSO add NBU water $19,448 + wastewater $6,244 per LUE; per the 2023 NBU Impact Fee Report, multi-family master meters are calculated at 0.5 LUE per dwelling unit - confirm per project meter sizing. alternative · not added to total | per dwelling unit | $3,643 | City of New Braunfels Mar 1, 2023High |
Coverage & caveats
RESIDENTIAL development impact fees in New Braunfels are levied by TWO jurisdictions: (1) the City of New Braunfels collects ROADWAY impact fees, and (2) New Braunfels Utilities (NBU) - the separate municipally-owned water/wastewater utility serving the city's service area - collects WATER and WASTEWATER impact fees. A builder must pay both. CONFIRMED CURRENT FEES (all official, high confidence): - Water impact fee: $19,448 per LUE (NBU Impact Fee Policy Schedule 3, effective 02/01/2023, collected at 100% of max; Schedule 3 = Schedule 2 maximum). - Wastewater impact fee: $6,244 per LUE (same source). A standard single-family home on a 5/8" x 3/4" meter = 1.0 LUE, so combined water+wastewater = $25,692 per single-family dwelling unit (confirmed in 2023 NBU Impact Fee Report meter table). - Roadway impact fee (City, Chapter 100 / Ordinance 2022-87, Exhibit 2, effective 03/01/2023, now collected at 100% of max): SINGLE-FAMILY DETACHED ranges from $1,471 (SA2) to $10,829 (SA4) per dwelling unit across SIX mutually-exclusive service areas (SA1 $4,914, SA2 $1,471, SA3 $2,328, SA4 $10,829, SA5 $6,320, SA6 $8,192). The exact roadway fee depends entirely on which of the six service areas the parcel is in - SA6 ($8,192) is used as the representative primary row; the other five are included as excludeFromTotal rows so the full range is visible. Multifamily (mid-rise default, ITE 221) roadway fee ranges $654-$4,815/unit by service area. REPRESENTATIVE SINGLE-FAMILY TOTAL (primary rows): Water $19,448 + Wastewater $6,244 + Roadway SA6 $8,192 = ~$33,884 per single-family detached dwelling unit. Using the lowest roadway area (SA2) the total is ~$27,163; using the highest (SA4) ~$36,521. The impact fees are NOT tiered by home square footage - they are per LUE / per dwelling unit, so no size-based tiering applies. WHAT DOES NOT EXIST HERE (Texas Local Government Code Ch. 395 limits impact fees to water, wastewater, roadway, and drainage ONLY): NO school, park, police, fire, library, open-space, affordable-housing, or general/capital impact fees - prohibited under Texas law. New Braunfels has NO municipal DRAINAGE impact fee (only a discretionary, case-by-case 'Stormwater Connection Fee' under City Code Sec. 143-20, not a standard per-dwelling-unit development fee).
Caveats
NBU also charges minor administrative/meter-set charges and standard service-tap installation costs not publicly itemized; small relative to impact fees and not separately verified. NBU's FY26-FY27 'rate adjustments' (eff. 08/01/2025) are utility CONSUMPTION rates, not impact fees. Census 2024 population for New Braunfels city ~116,477. New Braunfels spans BOTH Comal and Guadalupe Counties but is the seat of Comal County.
Verify
confirmed 10 of 10 rows; dropped 0. Both NBU figures ($19,448 water, $6,244 wastewater) verified exact against Schedule 3 of the Impact Fee Policy PDF and cross-confirmed against the 2023 NBU Impact Fee Report meter table (5/8" = 1.0 LUE = $25,692 combined); both sourceQuotes present verbatim. All 8 roadway values (6 SFD service areas + multifamily SA6) verified exact against the Chapter 100 Exhibit 2 rate table (ITE 210 SFD 4.61 veh-mi: SA1 $4,914/SA2 $1,471/SA3 $2,328/SA4 $10,829/SA5 $6,320/SA6 $8,192; ITE 221 MF mid-rise 2.05: SA1 $2,185/SA2 $654/SA3 $1,035/SA4 $4,815/SA5 $2,811/SA6 $3,643) for the 'on or after March 1, 2023' column; sourceQuotes present. excludeFromTotal corrections: NONE - the six SFD service areas are mutually exclusive, SA6 correctly retained as the single included representative with SA1-SA5 correctly flagged excludeFromTotal=true, and the multifamily row correctly flagged excludeFromTotal=true (separate land use). Representative SFD per-dwelling-unit total ($33,884) is sane and not double-counting. Census QuickFacts URL returned HTTP 403 on re-fetch but population 116,477 corroborated via multiple secondary sources; population is not a fee row.
Two source documents drive the figures, both independently re-fetched and confirmed. (1) NBU Impact Fee Policy Schedule 3 (Fees To Be Collected) confirms water $19,448/LUE + wastewater $6,244/LUE; the 2023 NBU Impact Fee Report meter-size table confirms 5/8" meter = 1.0 LUE = $19,448 + $6,244 = $25,692 for a typical single-family home, effective 02/01/2023, collected at 100% of the City-assessed maximum (Schedule 3 = Schedule 2). (2) City Chapter 100 Exhibit 2 'Collected Roadway Impact Fees' gives the per-dwelling-unit roadway fee for plats on/after 03/01/2023, all values verified verbatim. Roadway fees are inherently per-service-area; six mutually-exclusive areas exist, so only one (SA6) is counted in the primary total and the rest are excludeFromTotal. Multifamily water/wastewater impact fees apply per LUE; the NBU report calculates multi-family master meters at 0.5 LUE per dwelling unit (confirm per project meter sizing). No size/bedroom tiering exists for any New Braunfels impact fee. All 10 rows verified; none dropped; no excludeFromTotal corrections needed.
Sources
7 official sources · 9 high-confidence figures.
- 1New Braunfels Utilities Impact Fee Policy (Schedules 1-3, eff. 02/01/2023)New Braunfels Utilities (NBU) · ordinance · effective Feb 1, 2023 · retrieved Jun 16, 2026
- 2Water & Wastewater Impact Fee Update Report (2023 NBU Impact Fee Report)New Braunfels Utilities (NBU) · fee study · effective Feb 1, 2023 · retrieved Jun 16, 2026
- 3Chapter 100 - Roadway Impact Fees, Exhibit 2 - Collected Roadway Impact Fees (Rate Table, eff. 03/01/2023)City of New Braunfels · fee schedule · effective Mar 1, 2023 · retrieved Jun 16, 2026
- 4Roadway Impact Fees (Official Website - Ordinance 2022-87, effective 03/01/2023)City of New Braunfels · municipal webpage · effective Mar 1, 2023 · retrieved Jun 16, 2026
- 5Roadway Impact Fee - Collected Fee and Funding Improvements (Community Meeting presentation)City of New Braunfels · government report · effective Jun 23, 2022 · retrieved Jun 16, 2026
- 6Developers to pay maximum allowable water, wastewater impact fees in New BraunfelsCommunity Impact · news article · effective Dec 14, 2022 · retrieved Jun 16, 2026
- 7U.S. Census Bureau QuickFacts: New Braunfels city, TexasU.S. Census Bureau · government report · effective Jul 1, 2024 · retrieved Jun 16, 2026
New Braunfels impact fees — FAQ
- How much are development impact fees in New Braunfels, TX for a single-family home?
- As of 2026-06-16, total development fees for a single-family detached home in New Braunfels are about $33,884 per unit — roughly $8,192 in impact/development fees plus $25,692 in water/sewer connection fees. Figures are normalized from official sources; verify with the jurisdiction before relying on them.
- Are impact fees in New Braunfels the same as building permit fees?
- No. Impact fees (and water/sewer connection fees) fund off-site capital — roads, parks, schools, utilities — and are charged per new dwelling unit. Building permit and plan-review fees are separate and are not included here.
- How often do New Braunfels's impact fees change?
- Most jurisdictions adopt fees by ordinance and escalate them annually (often by a construction cost index), with occasional mid-year updates. Always confirm the current adopted schedule with the jurisdiction. ImpactFeeAtlas last verified New Braunfels on 2026-06-16.
Compare impact fees in nearby Texas jurisdictions
Cities with a similar fee burden
Jurisdictions in other states with total single-family fees close to New Braunfels’s $33,884 per home.