Hutto, TX Development Impact Fees (2026)
Normalized development impact fees, water & sewer connection (tap/SDC) fees, and mitigation fees for Hutto, Texas — per dwelling unit, by category, with links to every official source.
What a single-family home pays in Hutto
$23,752 total per unit across 4 fee categories.
- Sewer connection (tap / SDC)$8,450
- Water connection (tap / SDC)$7,408
- Transportation / roads$5,594
- Parks & recreation$2,300
Hutto’s $23,752 is about 1.4× the Texas tracked median of $16,912 — among the higher-cost places to build in the state.
Full fee schedule — single-family
Impact / development fees
| Fee (local term) | Basis | Amount | Source · effective |
|---|---|---|---|
Transportation / roads Transportation/Traffic Impact Fee - Single-Family Detached (ITE 210) — VERIFIED COMPUTED: City Impact Fee Worksheet (TIF tab, after-2/3/25) row 17 confirms Single-Family Detached Housing, ITE code 210, Dwelling Unit, Veh-miles per Unit = 4.31, Impact fee per Serv. Unit = 1298. 4.31 x $1,298 = $5,594.38/SFD unit. Worksheet note: 'Values from Table 3: Vehicle Miles per Development Unit (Roadway Impact Fee Study)'. The $1,298/veh-mi residential rate is stated verbatim in 2026 A5.004: 'Traffic (for plans approved after February 3, 2025) | Residential Land Use (per vehicle mile) $1,298.00' (up from $784.31 pre-2/3/2025). | per dwelling unit | $5,594 | City of Hutto, TX Feb 3, 2025High |
Drainage / stormwater Stormwater Management Fee - Single Family (one-time, per gross acre) — VERIFIED: Confirmed verbatim in 2026 Fee Schedule: 'Stormwater Management Fee | Single Family (gross acre) $800.00' (Last Updated 9/18/2025, matching effectiveDate). One-time stormwater/drainage development fee per GROSS ACRE (Single Family $800; Multi-family $1,600; Commercial/Industrial $2,400). Acre basis cannot be normalized to per-DU without a density assumption, so correctly excludeFromTotal. Separate $4.00 RECURRING MONTHLY drainage utility fee (A5.005) is not a one-time development fee. alternative · not added to total | per acre | $800 | City of Hutto, TX Sep 18, 2025High |
Parks & recreation Parkland Dedication Fee-in-Lieu - Residential (per dwelling unit) — VERIFIED: Confirmed verbatim in 2026 Fee Schedule: 'Parkland Fee-in-Lieu | Residential (per dwelling unit) $2,300.00'. Subdivision-ordinance parkland dedication fee-in-lieu, NOT a Ch.395 impact fee (park impact fees are illegal in TX). Charged per residential dwelling unit when land is not dedicated; legally distinct but additive. Correctly NOT excluded from per-DU total. Non-residential = $975 for first 3 acres + $975/acre above 3 acres. | per dwelling unit | $2,300 | City of Hutto, TX Apr 14, 2026High |
Water & sewer connection fees
| Fee (local term) | Basis | Amount | Source · effective |
|---|---|---|---|
Water connection (tap / SDC) Water Impact Fee - Single-Family Detached (per service unit / LUE) — VERIFIED: Confirmed verbatim in 2026 Fee Schedule A5.004 (Last Updated 4/14/2026): 'For plats approved after February 3, 2025 | Water (per service unit) $6,808.00'. SFD = 1.0 LUE = 1 service unit per City LUE Table line 29 ('Residence, Single Family or Townhouse | 1.0 | 1 Unit'), so per-service-unit = per-DU. WIF worksheet tab confirms Impact fee per Serv. Unit = 6808 (5/8" Positive Displacement meter). Corroborated by 2025 schedule ($6,808) and news coverage. | per dwelling unit | $6,808 | City of Hutto, TX Feb 3, 2025High |
Sewer connection (tap / SDC) Wastewater Impact Fee - Single-Family Detached residential (per service unit / LUE) — VERIFIED: Confirmed verbatim in 2026 Fee Schedule A5.004: 'Wastewater (residential) (per service unit) $7,600.00'. SFD = 1.0 LUE = 1 service unit (LUE Table line 29). WWIF worksheet tab confirms 7600 (Res). A separate NON-residential wastewater rate of $12,670/service unit is captured as an excluded reference row. Corroborated by 2025 schedule ($7,600) and news coverage. | per dwelling unit | $7,600 | City of Hutto, TX Feb 3, 2025High |
Water connection (tap / SDC) Water Connection (tap) Fee - 5/8" or 3/4" meter (standard residential) — VERIFIED: Confirmed verbatim in 2026 Fee Schedule A5.002: 'Water | 5/8" and 3/4" meter $600.00'. Physical water meter/connection (tap) fee, additive to the water impact fee. 5/8"/3/4" is the standard residential service. Larger-meter rates (1"=$750, 1.5"=$1,100, 2"=$1,300, >2"=meter cost+$300) are mutually-exclusive variants, correctly not listed separately. | per meter | $600 | City of Hutto, TX Apr 14, 2026High |
Sewer connection (tap / SDC) Wastewater Connection Fee - up to 8" connection (city-installed) — VERIFIED: Confirmed verbatim in 2026 Fee Schedule A5.002: 'Wastewater | Up to 8" connection $850.00'. Physical wastewater connection fee, additive to the wastewater impact fee. $850 city-installed (standard residential case); $300 developer-installed (up to 8") is a mutually-exclusive variant. Additive to impact fee. | per meter | $850 | City of Hutto, TX Apr 14, 2026High |
Coverage & caveats
WHAT EXISTS (Texas Local Government Code Ch. 395 limits impact fees to WATER, WASTEWATER, ROADWAY, and DRAINAGE only): Hutto charges WATER and WASTEWATER impact fees and a ROADWAY/Transportation (Traffic) impact fee. Current rates apply to plats approved AFTER February 3, 2025 (a major increase adopted early 2025; roadway updated via Ordinance O-2024-068). REPRESENTATIVE SINGLE-FAMILY DETACHED (1 service unit / 1.0 LUE; ~2,000-2,500 sq ft home is not size-tiered here - Hutto assesses residential water/wastewater per LUE and roadway per ITE-210 dwelling unit, neither tiered by home size): - Water impact fee: $6,808 / service unit - Wastewater (residential) impact fee: $7,600 / service unit - Transportation/Traffic impact fee: 4.31 veh-mi x $1,298/veh-mi = $5,594.38 / dwelling unit - Water connection (tap) fee, 5/8\"/3/4\" meter: $600 - Wastewater connection fee (up to 8\", city-installed): $850 - Parkland dedication fee-in-lieu (residential): $2,300 / dwelling unit (subdivision exaction, NOT a Ch.395 impact fee, but additive) Representative one-time residential total (impact fees + connection + parkland fee-in-lieu): 6808 + 7600 + 5594.38 + 600 + 850 + 2300 = $23,752.38 per single-family home. No double-counting (impact fees and connection/tap fees are distinct charges; parkland is a separate exaction). CONFIRMED PER-DWELLING-UNIT BASIS: The City's Living Unit Equivalent (LUE) Table line 29 sets 'Residence, Single Family or Townhouse = 1.0 LUE = 1 Unit', so the per-service-unit water/wastewater impact fees equal the per-dwelling-unit fees. The Transportation Impact Fee Worksheet (TIF tab, row 17) lists Single-Family Detached Housing (ITE 210) at 4.31 vehicle-miles per Dwelling Unit; multiplied by the $1,298/veh-mi residential rate stated verbatim in the fee schedule. These figures are identical across the FY2026 fee schedule (Last Updated 4/14/2026), the FY2025 schedule (Last Updated 11/21/2024), and the official impact-fee calculation worksheet (TIF/WIF/WWIF tabs), and are corroborated by news coverage of the early-2025 increase. WHAT DOES NOT EXIST (and is not legally allowed as impact fees in Texas): NO school impact fee, NO park impact fee, NO police impact fee, NO fire impact fee, NO library impact fee, NO open-space impact fee, NO affordable-housing/mitigation fee, NO general/capital impact fee. Ch.395 forbids all of these. Hutto ISD cannot levy school impact fees. (A subdivision-ordinance PARKLAND fee-in-lieu of $2,300/residential unit DOES exist - captured above - but it is an exaction, not a Ch.395 impact fee.) DRAINAGE: Hutto has a ONE-TIME Stormwater Management Fee assessed per GROSS ACRE (Single Family $800/acre, Multi-family $1,600/acre, Commercial/Industrial $2,400/acre) - captured but excludeFromTotal (acre basis, not per-DU). There is also a SEPARATE RECURRING MONTHLY drainage utility charge of $4.00 (A5.005) - not a one-time development fee. OTHER CHARGES NOTED BUT NOT PER-UNIT (excluded): (1) Service Extension Request (SER) review fees, tiered by project size in LUEs - Water SER Tier 1 (0-149 LUEs) $1,600 up to Tier 4 (900-1,499 LUEs) $5,320; Wastewater SER Tier 1 $2,340 up to Tier 4 $9,690 - administrative service-extension review fees, not per-unit capacity charges. (2) Water/Wastewater LUE Reservation = $70 per LUE per YEAR each (recurring capacity-reservation charge). (3) Water meter deposits and account/service charges are utility-billing fees, not development fees. (4) New Residential Building Permit Fee $1,600 is a permit fee, not an impact/connection/mitigation fee (excluded from scope). SEPARATE DISTRICTS: Hutto operates its own municipal water and wastewater utility (no separate water/sewer district levies a duplicate impact fee on a Hutto city builder). Some accounts are served by Manville WSC (noted in A5.003 disconnect-fee passthrough), but the City's own impact/connection fees apply to development within the City. No separate highway-district or school-district impact fee applies (school impact fees illegal in TX). CAVEATS: SFD water/wastewater/roadway/connection/parkland figures are HIGH confidence (exact verbatim quotes or direct worksheet computations from official City sources). Multifamily per-unit water/wastewater (0.8 LUE/unit) are MEDIUM confidence because multifamily utility impact fees are commonly assessed per master/domestic meter rather than strictly per unit. The wastewater non-residential rate ($12,670) and all multifamily/non-SFD rows are excludeFromTotal so they do not contaminate the single-family representative total. VERIFY: confirmed 12 of 12 rows; dropped 0. All amounts independently re-fetched and confirmed: (a) 2026 Fee Schedule PDF (sourceIndex 0) confirms verbatim A5.004 impact fees ($6,808 water / $7,600 residential wastewater / $12,670 non-residential wastewater / $1,298 per-veh-mi residential traffic), A5.002 connection fees ($600 water 5/8\"-3/4\", $850 wastewater up to 8\"), Stormwater Management Fee Single Family $800/gross acre, and Parkland Fee-in-Lieu Residential $2,300/DU; (b) Impact Fee Worksheet xlsx (sourceIndex 1) TIF tab row 17 confirms SFD ITE 210 = 4.31 veh-mi x 1298 = $5,594.38 and row 19 confirms MF Low-Rise ITE 220 = 2.34 veh-mi x 1298 = $3,037.32, WIF tab confirms water 6808, WWIF tab confirms wastewater 7600 (Res); (c) LUE Table PDF (sourceIndex 2) line 29 confirms SFD = 1.0 LUE = 1 Unit and line 28 confirms apartment/condo = 1.0 LUE per 1.25 Units (0.8 LUE/unit), validating MF computed amounts $5,446.40 (water) and $6,080 (wastewater); (d) 2025 Fee Schedule (sourceIndex 4) and CitizenPortal/Community Impact news (sourceIndex 5) corroborate identical $6,808/$7,600/$12,670/$1,298 figures. excludeFromTotal corrections: NONE - all flags were already correct (excluded: stormwater [acre basis], 3 multifamily rows [non-SFD land use], non-residential wastewater [reference]; included: 2 SFD utility impact fees, SFD transportation, 2 SFD connection fees, SFD parkland fee-in-lieu). Representative per-DU total $23,752.38 verified sane with no double-counting. Minor note: the non-residential wastewater reference row carries unitBasis=per_dwelling_unit although it is technically per service unit, but it is excluded so it does not affect the per-DU total.
Current rates apply to plats approved AFTER February 3, 2025. SFD = 1.0 LUE = 1 service unit (per City LUE Table line 29), so per-service-unit water ($6,808) and residential wastewater ($7,600) impact fees equal the per-dwelling-unit amounts. Traffic impact fee is collected per vehicle-mile ($1,298/veh-mi residential) x ITE-210 single-family rate of 4.31 veh-mi/unit = $5,594.38/home (verified from the City's official TIF worksheet row 17). Connection (tap) fees ($600 water 5/8\"-3/4\" meter, $850 wastewater up to 8\") are additive on top of impact fees. A $2,300/unit residential parkland fee-in-lieu (subdivision exaction, not a Ch.395 impact fee) also applies. Stormwater Management Fee is $800/gross acre for single family (acre basis, excluded from per-DU total). No school/park/police/fire/library/open-space/affordable-housing impact fees exist (forbidden under TX Ch.395). VERIFIED 2026-06-17: all 12 rows independently confirmed against the City of Hutto FY2026 Fee Schedule (Appendix A, Last Updated 4/14/2026), the official Impact Fee Worksheet xlsx (TIF/WIF/WWIF tabs, after 2/3/25), and the LUE Table; corroborated by the FY2025 schedule and news coverage. 0 rows dropped; no excludeFromTotal corrections needed.
Sources
6 official sources · 9 high-confidence figures.
- 12026 City of Hutto Fee Schedule (Appendix A) - A5.004 Impact Fees, A5.002 Connection Fees, A1.x Stormwater/Parkland/SER feesCity of Hutto, TX · fee schedule · effective Apr 14, 2026 · retrieved Jun 17, 2026
- 2Hutto Impact Fee Worksheet (for plats approved after 2-3-25) - TIF/WIF/WWIF tabs with ITE codes, veh-miles per unit, service unitsCity of Hutto, TX · fee schedule · effective Feb 3, 2025 · retrieved Jun 17, 2026
- 3Living Unit Equivalent (LUE) Table - 2021 (water & wastewater service unit equivalents by development type)City of Hutto, TX · fee study · retrieved Jun 17, 2026
- 4Impact Fees page (worksheets, ordinances O-2024-068, O-2023-014, O-2021-014; Engineering Dept. 512-759-4015)City of Hutto, TX · municipal webpage · retrieved Jun 17, 2026
- 52025 City of Hutto Fee Schedule (Appendix A) - A5.004 Impact Fees (Last Updated 11/21/2024) - corroborates identical impact-fee amountsCity of Hutto, TX · fee schedule · effective Nov 21, 2024 · retrieved Jun 17, 2026
- 6Hutto debates drastic water fee hikes amid housing concerns (water $6,808 / residential wastewater $7,600 / commercial $12,670; effective plats after Feb 3, 2025)CitizenPortal.ai · news article · effective Feb 3, 2025 · retrieved Jun 17, 2026
Hutto impact fees — FAQ
- How much are development impact fees in Hutto, TX for a single-family home?
- As of 2026-06-17, total development fees for a single-family detached home in Hutto are about $23,752 per unit — roughly $7,894 in impact/development fees plus $15,858 in water/sewer connection fees. Figures are normalized from official sources; verify with the jurisdiction before relying on them.
- Are impact fees in Hutto the same as building permit fees?
- No. Impact fees (and water/sewer connection fees) fund off-site capital — roads, parks, schools, utilities — and are charged per new dwelling unit. Building permit and plan-review fees are separate and are not included here.
- How often do Hutto's impact fees change?
- Most jurisdictions adopt fees by ordinance and escalate them annually (often by a construction cost index), with occasional mid-year updates. Always confirm the current adopted schedule with the jurisdiction. ImpactFeeAtlas last verified Hutto on 2026-06-17.