ImpactFeeAtlasCompare fees
CityWilliamson CountyVerified Jun 16, 2026

Georgetown, TX Development Impact Fees (2026)

Normalized development impact fees, water & sewer connection (tap/SDC) fees, and mitigation fees for Georgetown, Texas — per dwelling unit, by category, with links to every official source.

$26,114
Total per single-family home
impact + connection fees
$5,599
Impact / development fees
roads, parks, schools…
$20,515
Water & sewer connection
tap / capacity / SDC
Per multifamily unit
total fees / unit

What a single-family home pays in Georgetown

$26,114 total per unit across 4 fee categories.

  • Water connection (tap / SDC)$12,265
  • Sewer connection (tap / SDC)$8,250
  • Transportation / roads$3,619
  • Parks & recreation$1,980

Georgetown’s $26,114 is about 2.0× the Texas tracked median of $12,871 — among the higher-cost places to build in the state.

Full fee schedule — single-family

Impact / development fees

Fee (local term)BasisAmountSource · effective
Transportation / roads
Roadway (Transportation) Impact Fee - Service Area A, single family (current 3/1/2023-3/1/2026 collection) — Roadway Impact Fee under TX LGC Ch. 395 / Ord. 2021-16 (adopted 3/23/2021, effective/collected from 3/1/2023). HIGHLY VARIABLE: there are 9 service areas (A, B, C, D, E, F, Sun City + two $0 areas Downtown & Lake Georgetown). Max assessable fee per service unit (per vehicle-mile) ranges A=$1,699 to F=$4,577; single-family detached = 4.26 veh-mi/unit. Area A is used as the representative (it has the most collections per the semi-annual report). Current single-family collected fee by area (1-2 family assessed rate 32-52% in the 3/1/2023-3/1/2026 window): roughly Sun City $3,984, A $5,429 max-rate basis; the $3,619 figure reflects the originally adopted Area A SF collection rate. NOTE: a 2025 Transportation Impact Fee Study was adopted by City Council 8/22/2025 raising fees 100% to over 250% across categories, phasing fully in by Sept 2026; the new per-single-family-unit dollar amounts are NOT publicly published (city TIF page/calculator returns HTTP 403 to all automated access; ZoneFee notes 'Amounts not publicly available'). Treat as a representative current-program figure pending the 2025-study-updated schedule.
per dwelling unit$3,619City of Georgetown, Texas
Mar 1, 2023Medium
Parks & recreation
Parkland Dedication fee-in-lieu (1-2 dwelling units per lot/parcel) — Parkland DEDICATION fee-in-lieu under the Unified Development Code (NOT a Ch. 395 impact fee - TX prohibits park impact fees, but allows parkland dedication/fee-in-lieu ordinances). $780 per unit for 1-2 units; $570/unit for 3+ units (excluded variant). Charged when land is not dedicated.
per dwelling unit$780City of Georgetown, Texas (Laserfiche WebLink public records)
Oct 1, 2025High
Parks & recreation
Parkland Development fee-in-lieu (1-2 dwelling units per lot/parcel) — Parkland DEVELOPMENT fee-in-lieu under the UDC (separate from and additive to the parkland dedication fee). $1,200 per unit for 1-2 units; $900/unit for 3+ units (excluded variant). Funds park improvements where the developer does not build them.
per dwelling unit$1,200City of Georgetown, Texas (Laserfiche WebLink public records)
Oct 1, 2025High

Water & sewer connection fees

Fee (local term)BasisAmountSource · effective
Water connection (tap / SDC)
Water Impact Fee (3/4" meter / 1 LUE) — City of Georgetown (GUS, a city-operated utility) water impact fee under Code Ch. 13.32 / TX LGC Ch. 395. Base residential is a 3/4" meter = 1 LUE. Per the Aug 2025 adopted ordinance and Community Impact, this rises to $12,000 on 8/31/2026 and $13,000 on 8/31/2027 (see excluded rows). Applies city-wide; not service-area dependent.
per dwelling unit$11,000City of Georgetown, Texas (Laserfiche WebLink public records)
Oct 1, 2023High
Sewer connection (tap / SDC)
Wastewater Impact Fee (3/4" meter / 1 LUE) — City wastewater impact fee under Code Ch. 13.32 / TX LGC Ch. 395, 3/4" meter = 1 LUE. Current effective fee (eff. 8/31/2025) is $7,000; previously-platted lots remain at $6,129. Rises to $10,250 on 8/31/2026 and $13,500 on 8/31/2027 (see excluded rows). South Fork wastewater service area carries identical amounts.
per dwelling unit$7,000City of Georgetown, Texas (Laserfiche WebLink public records)
Aug 31, 2025High
Water connection (tap / SDC)
Water Meter Connection 3/4" (inside city) — FY26 adopted physical water meter set/connection fee for the base residential 3/4" meter inside city limits. Separate from and additive to the water impact fee. Outside-city 3/4" is $660 (excluded variant).
per meter$640City of Georgetown, Texas (Laserfiche WebLink public records)
Oct 1, 2025High
Sewer connection (tap / SDC)
Sewer Tap 4" (inside city) - smallest residential tap — FY26 adopted sewer tap fee; 4" is the smallest (residential) tap size inside city limits. Additive to wastewater impact fee. Outside-city 4" is $2,100 (excluded variant). ZoneFee's $300 reflects the old/Current-Fee column; FY26 adopted amount is $1,790.
$1,790City of Georgetown, Texas (Laserfiche WebLink public records)
Oct 1, 2025High
Water connection (tap / SDC)
Water Engineering & Inspection Fee - single family per dwelling unit — FY26 adopted water engineering/inspection fee per single-family dwelling unit.
per dwelling unit$625City of Georgetown, Texas (Laserfiche WebLink public records)
Oct 1, 2025High
Sewer connection (tap / SDC)
Wastewater Engineering & Inspection Fee - single family per dwelling unit — FY26 adopted wastewater engineering/inspection fee per single-family dwelling unit.
per dwelling unit$625City of Georgetown, Texas (Laserfiche WebLink public records)
Oct 1, 2025High
Sewer connection (tap / SDC)
Sewer Tap Engineering & Inspection Fee (inside city) - single family — FY26 adopted sewer tap engineering/inspection fee for single-family, inside city limits.
per dwelling unit$625City of Georgetown, Texas (Laserfiche WebLink public records)
Oct 1, 2025High
Water connection (tap / SDC)
Water Impact Fee 3/4" - SCHEDULED increase 8/31/2026 — Scheduled (already adopted) future water impact fee per 3/4" meter; takes effect 8/31/2026, then $13,000 on 8/31/2027. Excluded to avoid double-counting with the current $11,000 row.
alternative · not added to total
per dwelling unit$12,000Community Impact
Aug 31, 2026High
Sewer connection (tap / SDC)
Wastewater Impact Fee 3/4" - SCHEDULED increase 8/31/2026 — Scheduled (already adopted) future wastewater impact fee per 3/4" meter; takes effect 8/31/2026, then $13,500 on 8/31/2027. Excluded to avoid double-counting with the current $7,000 row.
alternative · not added to total
per dwelling unit$10,250Community Impact
Aug 31, 2026High
Water connection (tap / SDC)
Water Impact Fee 5/8" meter (variant) — Mutually-exclusive meter-size variant. The base residential meter is 3/4" (1 LUE), used as the primary water impact fee row; the 5/8" rate is included here only as an alternative.
alternative · not added to total
per meter$7,337City of Georgetown, Texas (Laserfiche WebLink public records)
Oct 1, 2023High
Sewer connection (tap / SDC)
Wastewater Impact Fee 5/8" meter (variant) — Mutually-exclusive meter-size variant (current eff. 8/31/2025 amount). Primary residential basis is the 3/4" meter.
alternative · not added to total
per meter$4,669City of Georgetown, Texas (Laserfiche WebLink public records)
Aug 31, 2025High

Coverage & caveats

Jurisdiction: City of Georgetown, Williamson County, TX (home-rule city; utilities provided directly by city-operated Georgetown Utility Systems/GUS - NOT an independent MUD or water district). All figures verified 2026-06-16. PRIMARY SOURCE: The City's official FY26 Comprehensive Fee Schedule (Laserfiche public records, etag dated Oct 27 2025), which lists two columns "Current Fee" and "Proposed FY26 Fee." FY26 = Oct 1 2025-Sept 30 2026, so the "Proposed FY26 Fee" column is the currently effective adopted fee. The schedule header notes "*Some fees are pending adoption; this is a proposed FY26 schedule." WHAT EXISTS (residential, single-family detached, inside city, 3/4" meter / 1 LUE representative): - Water Impact Fee $11,000/LUE (3/4"); Wastewater Impact Fee $7,000/LUE (eff. 8/31/2025). Both rise on a published, adopted schedule (water -> $12,000 on 8/31/2026 -> $13,000 on 8/31/2027; wastewater -> $10,250 on 8/31/2026 -> $13,500 on 8/31/2027). - Roadway (Transportation) Impact Fee under Ord. 2021-16 (adopted 3/23/2021, collected from 3/1/2023). Representative Service Area A single-family ~$3,619. SEE CAVEAT BELOW. - Physical connection fees (FY26): Water meter connection 3/4" inside city $640; Sewer tap 4" (smallest residential) inside city $1,790; Water eng/inspection SF/DU $625; Wastewater eng/inspection SF/DU $625; Sewer tap eng/inspection SF (inside) $625. - Parkland Dedication fee-in-lieu $780/unit (1-2 units) and Parkland Development fee-in-lieu $1,200/unit (1-2 units), both under the UDC. - Electric connection fee $200 (single-phase 0-400 amp) exists (GUS provides electric) - not itemized as a fee row because it is a utility service connection, not a development/impact fee; noted here for completeness. WHAT DOES NOT EXIST HERE (Texas LGC Ch. 395 limits impact fees to water, wastewater, roadway, and drainage only): - NO school impact fee (prohibited in TX; school facilities are funded by Williamson County school districts via property tax/bonds, not builder impact fees). - NO police, fire, library, general/capital, open-space, or affordable-housing impact fees (none allowed/levied). - NO standalone "park IMPACT fee" - the parks line items above are parkland DEDICATION/DEVELOPMENT fees-in-lieu under the UDC, which are legally distinct from Ch. 395 impact fees. - NO mitigation impact fee per se; a tree-mitigation payment-in-lieu exists under the UDC (ZoneFee cites ~$550 per mitigation inch) but I could not pull the exact per-inch figure from a primary city source, so it is omitted to preserve integrity (the rate is project/tree-specific). - Drainage: Georgetown's listed "Drainage Fee" is a calculated monthly stormwater UTILITY charge (not a one-time per-unit development impact fee), and a Stormwater Permit is $2,300 per project - neither is a per-dwelling-unit development impact fee, so no drainage impact-fee row is reported. KEY CAVEATS: 1) TRANSPORTATION FEE IS HIGHLY VARIABLE AND IN TRANSITION. There are 9 service areas (A,B,C,D,E,F,Sun City fee areas; Downtown & Lake Georgetown are $0). Max assessable fee per service unit (per vehicle-mile) ranges $1,247 (Sun City) to $4,577 (Area F); single-family detached = 4.26 veh-mi/unit. The 1-2 family assessed collection rate in the current 3/1/2023-3/1/2026 window is 32%-52% by area, stepping up to 49%-75% after 3/1/2026. CRITICALLY, the City adopted a 2025 Transportation Impact Fee Study on 8/22/2025 raising fees "from 100% to over 250% for many categories," phasing fully in by Sept 2026; the new per-single-family-unit dollar amounts are NOT publicly published in any extractable source (the city's TIF page and fee calculator return HTTP 403 to all automated/curl/browser access; ZoneFee explicitly states transportation amounts are "not publicly available"). The $3,619 Area A figure is the documented adopted current-program collection rate (confidence: medium) and should be treated as a representative lower bound pending the 2025-study schedule. 2) BOT PROTECTION: georgetowntexas.gov is hard-blocked at the server (HTTP 403) to curl, WebFetch, and the headless browser. All city figures were obtained from the Laserfiche records portal (direct edoc PDF), the city's revize.com CDN documents, and cloudfront-hosted agenda/report PDFs - all official city sources. 3) WATER vs WASTEWATER METER BASIS: residential base is the 3/4" meter (1 LUE). 5/8" and larger meter variants are included as excluded rows. South Fork wastewater service area has identical wastewater impact-fee amounts. 4) Per-unit single-family TOTAL of the additive (non-excluded) fee rows: water impact $11,000 + wastewater impact $7,000 + roadway impact ~$3,619 + water meter conn $640 + sewer tap $1,790 + water eng/insp $625 + wastewater eng/insp $625 + sewer tap eng/insp $625 + parkland dedication $780 + parkland development $1,200 ~= $27,904 per single-family dwelling (inside city, Service Area A, 3/4" meter), with the roadway component subject to substantial increase under the 2025 study.

All "Proposed FY26 Fee" column values are the currently adopted/effective fees (FY26 began 10/1/2025; schedule etag Oct 27 2025). Water and wastewater impact fees are per LUE based on a 3/4" meter (= 1 residential LUE) and are levied city-wide. The roadway/transportation impact fee is the only major fee that is service-area dependent and is the largest source of uncertainty (see coverageNotes caveat #1). Connection/tap and engineering-inspection fees are additive to the impact fees. Parkland dedication and parkland development are separate, both per dwelling unit, both additive.

Sources

7 official sources · 13 high-confidence figures.

  1. 1City of Georgetown Comprehensive Fee Schedule FY26City of Georgetown, Texas (Laserfiche WebLink public records) · fee schedule · effective Oct 1, 2025 · retrieved Jun 16, 2026
  2. 2Transportation Impact Fees - Impact Fee Committee (IFAC) Recommendations (Jan 8, 2021)City of Georgetown, Texas · fee study · effective Mar 1, 2023 · retrieved Jun 16, 2026
  3. 32020 Transportation Impact Fee Study Final Report (Feb 2021)City of Georgetown, Texas (Kimley-Horn) · fee study · effective Mar 1, 2023 · retrieved Jun 16, 2026
  4. 4Transportation Impact Fee Semi-Annual Report (Q4 2024)City of Georgetown, Texas Planning and Zoning Commission · government report · effective Oct 15, 2024 · retrieved Jun 16, 2026
  5. 5Planning and Zoning Commission - 2025 Traffic Impact Fee Study Update (June 2025 presentation)City of Georgetown, Texas Planning and Zoning Commission · government report · effective Jun 13, 2025 · retrieved Jun 16, 2026
  6. 6Georgetown raises fees for new development, proposes increase to waste disposal ratesCommunity Impact · news article · effective Aug 22, 2025 · retrieved Jun 16, 2026
  7. 7Georgetown, TX Development Fees (citing City Construction Fee Schedule Rev. 11.5.2025 and Code of Ordinances Ch. 13.04/13.32)ZoneFee · other · effective Nov 5, 2025 · retrieved Jun 16, 2026

Georgetown impact fees — FAQ

How much are development impact fees in Georgetown, TX for a single-family home?
As of 2026-06-16, total development fees for a single-family detached home in Georgetown are about $26,114 per unit — roughly $5,599 in impact/development fees plus $20,515 in water/sewer connection fees. Figures are normalized from official sources; verify with the jurisdiction before relying on them.
Are impact fees in Georgetown the same as building permit fees?
No. Impact fees (and water/sewer connection fees) fund off-site capital — roads, parks, schools, utilities — and are charged per new dwelling unit. Building permit and plan-review fees are separate and are not included here.
How often do Georgetown's impact fees change?
Most jurisdictions adopt fees by ordinance and escalate them annually (often by a construction cost index), with occasional mid-year updates. Always confirm the current adopted schedule with the jurisdiction. ImpactFeeAtlas last verified Georgetown on 2026-06-16.