ImpactFeeAtlasCompare fees
CityWilliamson CountyVerified Jun 16, 2026

Georgetown, TX Development Impact Fees (2026)

A new single-family home in Georgetown, Texas pays about $26,114 in total development impact and water/sewer connection fees per unit as of Jun 16, 2026 — about $5,599 in impact/development fees plus $20,515 in water & sewer connection (tap/SDC) fees. Every figure below is normalized per dwelling unit by category, with a link to its official source.

$26,114
Total per single-family home
impact + connection fees
$5,599
Impact / development fees
roads, parks, schools…
$20,515
Water & sewer connection
tap / capacity / SDC
Per multifamily unit
total fees / unit

What a single-family home pays in Georgetown

$26,114 total per unit across 4 fee categories.

  • Water connection (tap / SDC)$12,265
  • Sewer connection (tap / SDC)$8,250
  • Transportation / roads$3,619
  • Parks & recreation$1,980

Georgetown’s $26,114 is about 1.5× the Texas tracked median of $16,912 — among the higher-cost places to build in the state.

Full fee schedule — single-family detached

Impact / development fees

Fee (local term)BasisAmountSource · effective
Transportation / roads
Roadway (Transportation) Impact Fee - Service Area A, single family (current 3/1/2023-3/1/2026 collection) — VERIFIED against IFAC Recommendations PDF: 'IFAC Collection Rates - Single Family ... Service Area A $3,619 (Oct 1, 2022)'. Roadway Impact Fee under TX LGC Ch. 395 / Ord. 2021-16 (adopted 3/23/2021, collected from 3/1/2023). HIGHLY VARIABLE: 9 service areas (A,B,C,D,E,F,Sun City + $0 areas Downtown & Lake Georgetown). Area A used as representative. A 2025 Transportation Impact Fee Study was adopted by City Council 8/22/2025 raising fees 100% to over 250% across categories, phasing fully in by Sept 2026; the new per-single-family-unit dollar amounts are NOT publicly published (city TIF page/calculator returns HTTP 403; ZoneFee notes amounts not publicly available). Treat $3,619 as a representative current-program figure (medium confidence) pending the 2025-study-updated schedule.
per dwelling unit$3,619City of Georgetown, Texas
Mar 1, 2023Medium
Parks & recreation
Parkland Dedication fee-in-lieu (1-2 dwelling units per lot/parcel) — VERIFIED against FY26 schedule Planning section: 'Parkland Dedication - One or two dwelling units on a lot or parcel ... $780 per unit / $780 per unit'. Parkland DEDICATION fee-in-lieu under the Unified Development Code (NOT a Ch. 395 impact fee; TX prohibits park impact fees but allows parkland dedication/fee-in-lieu). $780/unit for 1-2 units; $570/unit for 3+ units (excluded variant).
per dwelling unit$780City of Georgetown, Texas (Laserfiche WebLink public records)
Oct 1, 2025High
Parks & recreation
Parkland Development fee-in-lieu (1-2 dwelling units per lot/parcel) — VERIFIED against FY26 schedule Planning section: 'Parkland Development-One or two dwelling units on a lot or parcel ... $1200 per unit / $1200 per unit'. Parkland DEVELOPMENT fee-in-lieu under the UDC (separate from and additive to parkland dedication). $1,200/unit for 1-2 units; $900/unit for 3+ units (excluded variant).
per dwelling unit$1,200City of Georgetown, Texas (Laserfiche WebLink public records)
Oct 1, 2025High

Water & sewer connection fees

Fee (local term)BasisAmountSource · effective
Water connection (tap / SDC)
Water Impact Fee (3/4" meter / 1 LUE) — VERIFIED against FY26 Comprehensive Fee Schedule line 'Water and Wastewate $11,000.00 $11,000.00 WATER IMPACT FEE-3/4"'. City of Georgetown (GUS) water impact fee under Code Ch. 13.32 / TX LGC Ch. 395; base residential 3/4" meter = 1 LUE. Both Current and Proposed FY26 columns = $11,000. Rises to $12,000 on 8/31/2026 and $13,000 on 8/31/2027 (see excluded rows; corroborated by Community Impact). Applies city-wide.
per dwelling unit$11,000City of Georgetown, Texas (Laserfiche WebLink public records)
Oct 1, 2023High
Sewer connection (tap / SDC)
Wastewater Impact Fee (3/4" meter / 1 LUE) — VERIFIED against FY26 schedule line 'WASTEWATER IMPACT FEE-3/4" $6,129.00 Previously Platted $6,129.00; Eff. 8/31/25 $7,000'. Current effective fee (eff. 8/31/2025) = $7,000; previously-platted lots remain at $6,129. Rises to $10,250 on 8/31/2026 and $13,500 on 8/31/2027 (see excluded rows; corroborated by Community Impact). South Fork wastewater service area carries identical amounts (verified, same line values).
per dwelling unit$7,000City of Georgetown, Texas (Laserfiche WebLink public records)
Aug 31, 2025High
Water connection (tap / SDC)
Water Meter Connection 3/4" (inside city) — VERIFIED against FY26 schedule line 'Water and Wastewate $350.00 $640.00 WATER METER CONNECTIONS-3/4"-INSIDE CITY LIMITS'. FY26 adopted physical water meter set/connection fee for base residential 3/4" meter inside city limits. Separate from and additive to the water impact fee. Outside-city 3/4" is $660 (excluded variant).
per meter$640City of Georgetown, Texas (Laserfiche WebLink public records)
Oct 1, 2025High
Sewer connection (tap / SDC)
Sewer Tap 4" (inside city) - smallest residential tap — VERIFIED against FY26 schedule line 'Water and Wastewate $300.00 $1,790.00 SEWER TAP 4" INSIDE CITY LIMITS'. 4" is the smallest (residential) tap size inside city limits. Additive to wastewater impact fee. Outside-city 4" is $2,100 (excluded variant). FY26 adopted amount = $1,790.
$1,790City of Georgetown, Texas (Laserfiche WebLink public records)
Oct 1, 2025High
Water connection (tap / SDC)
Water Engineering & Inspection Fee - single family per dwelling unit — VERIFIED against FY26 schedule line '$500.00 $625.00 WATER ENGINEERING AND INSPECTION FEE-SINGLE FAMILY-PER DWELLING UNIT'. FY26 adopted water engineering/inspection fee per single-family dwelling unit.
per dwelling unit$625City of Georgetown, Texas (Laserfiche WebLink public records)
Oct 1, 2025High
Sewer connection (tap / SDC)
Wastewater Engineering & Inspection Fee - single family per dwelling unit — VERIFIED against FY26 schedule line '$500.00 $625.00 WASTEWATER ENGINEERING AND INSPECTION FEE-SINGLE FAMILY-PER DWELLING UNIT'. FY26 adopted wastewater engineering/inspection fee per single-family dwelling unit.
per dwelling unit$625City of Georgetown, Texas (Laserfiche WebLink public records)
Oct 1, 2025High
Sewer connection (tap / SDC)
Sewer Tap Engineering & Inspection Fee (inside city) - single family — VERIFIED against FY26 schedule line '$500.00 $625.00 SEWER TAP ENGINEERING AND INSPECTION FEE (INSIDE CITY)-' (single family). FY26 adopted sewer tap engineering/inspection fee for single-family, inside city limits.
per dwelling unit$625City of Georgetown, Texas (Laserfiche WebLink public records)
Oct 1, 2025High
Water connection (tap / SDC)
Water Impact Fee 3/4" - SCHEDULED increase 8/31/2026 — VERIFIED against Community Impact: 'For water impact fees, the cost will increase from $11,000 to $12,000 on Aug. 31, 2026. It will increase again to $13,000 on Aug. 31, 2027.' Scheduled (already adopted) future water impact fee per 3/4" meter; takes effect 8/31/2026, then $13,000 on 8/31/2027. Correctly excluded to avoid double-counting with the current $11,000 row.
alternative · not added to total
per dwelling unit$12,000Community Impact
Aug 31, 2026High
Sewer connection (tap / SDC)
Wastewater Impact Fee 3/4" - SCHEDULED increase 8/31/2026 — VERIFIED against Community Impact: 'For wastewater impact fees, the cost will increase from $6,129 to $7,000 on Aug. 31, 2025. It will increase to $10,250 on Aug. 31, 2026, and again to $13,500 on Aug. 31, 2027.' Scheduled (already adopted) future wastewater impact fee per 3/4" meter; takes effect 8/31/2026, then $13,500 on 8/31/2027. Correctly excluded to avoid double-counting with the current $7,000 row.
alternative · not added to total
per dwelling unit$10,250Community Impact
Aug 31, 2026High
Water connection (tap / SDC)
Water Impact Fee 5/8" meter (variant) — VERIFIED against FY26 schedule line 'Water and Wastewate $7,337.00 $7,337.00 WATER IMPACT FEE-5/8"'. Mutually-exclusive meter-size variant; base residential meter is 3/4" (1 LUE), used as the primary water impact fee row. Correctly excluded.
alternative · not added to total
per meter$7,337City of Georgetown, Texas (Laserfiche WebLink public records)
Oct 1, 2023High
Sewer connection (tap / SDC)
Wastewater Impact Fee 5/8" meter (variant) — VERIFIED against FY26 schedule line 'WASTEWATER IMPACT FEE-5/8" $4,088.04 Previously Platted $4,088.04; Eff. 8/31/25 $4,669'. Mutually-exclusive meter-size variant (current eff. 8/31/2025 amount). Primary residential basis is the 3/4" meter. Correctly excluded.
alternative · not added to total
per meter$4,669City of Georgetown, Texas (Laserfiche WebLink public records)
Aug 31, 2025High

Multifamily (per unit) impact fees in Georgetown

Impact / development fees

Fee (local term)BasisAmountSource · effective
Transportation / roads
Roadway Impact Fee - Service Area A, MULTIFAMILY per unit (current collection) — VERIFIED against IFAC Recommendations PDF: 'IFAC Collection Rates - Multi-Family ... Service Area A $1,024 (Oct 1, 2022)'. Multifamily per-unit roadway impact fee, Service Area A (representative). Correctly excluded from the single-family total (different land use). Same caveats as the SF roadway row: varies by 9 service areas and is being increased by the 2025 study (phase-in through Sept 2026).
alternative · not added to total
per dwelling unit$1,024City of Georgetown, Texas
Mar 1, 2023Medium

Coverage & caveats

Jurisdiction: City of Georgetown, Williamson County, TX (home-rule city; utilities provided directly by city-operated Georgetown Utility Systems/GUS - NOT an independent MUD or water district). All figures verified 2026-06-16.

Primary source

The City's official FY26 Comprehensive Fee Schedule (Laserfiche public records), which lists two columns "Current Fee" and "Proposed FY26 Fee." FY26 = Oct 1 2025-Sept 30 2026, so the "Proposed FY26 Fee" column is the currently effective adopted fee. The schedule header notes "*Some fees are pending adoption; this is a proposed FY26 schedule." WHAT EXISTS (residential, single-family detached, inside city, 3/4" meter / 1 LUE representative): - Water Impact Fee $11,000/LUE (3/4"); Wastewater Impact Fee $7,000/LUE (eff. 8/31/2025). Both rise on a published, adopted schedule (water -> $12,000 on 8/31/2026 -> $13,000 on 8/31/2027; wastewater -> $10,250 on 8/31/2026 -> $13,500 on 8/31/2027). - Roadway (Transportation) Impact Fee under Ord. 2021-16 (adopted 3/23/2021, collected from 3/1/2023). Representative Service Area A single-family ~$3,619. SEE CAVEAT BELOW. - Physical connection fees (FY26): Water meter connection 3/4" inside city $640; Sewer tap 4" (smallest residential) inside city $1,790; Water eng/inspection SF/DU $625; Wastewater eng/inspection SF/DU $625; Sewer tap eng/inspection SF (inside) $625. - Parkland Dedication fee-in-lieu $780/unit (1-2 units) and Parkland Development fee-in-lieu $1,200/unit (1-2 units), both under the UDC. - Electric connection fee $200 (single-phase 0-400 amp) exists (GUS provides electric) - not itemized as a fee row because it is a utility service connection, not a development/impact fee; noted here for completeness. WHAT DOES NOT EXIST HERE (Texas LGC Ch. 395 limits impact fees to water, wastewater, roadway, and drainage only): - NO school impact fee (prohibited in TX; school facilities funded by Williamson County school districts via property tax/bonds). - NO police, fire, library, general/capital, open-space, or affordable-housing impact fees. - NO standalone "park IMPACT fee" - the parks line items above are parkland DEDICATION/DEVELOPMENT fees-in-lieu under the UDC, legally distinct from Ch. 395 impact fees. - NO mitigation impact fee per se; a tree-mitigation payment-in-lieu exists under the UDC but no exact per-inch figure was pulled from a primary city source, so it is omitted. - Drainage: Georgetown's listed "Drainage Fee" is a calculated monthly stormwater UTILITY charge (not a one-time per-unit development impact fee), and a Stormwater Permit is $2,300 per project - neither is a per-dwelling-unit development impact fee, so no drainage impact-fee row is reported.

Key caveats

1) TRANSPORTATION FEE IS HIGHLY VARIABLE AND IN TRANSITION. 9 service areas (A,B,C,D,E,F,Sun City; Downtown & Lake Georgetown are $0). Area A SF collection rate $3,619 (Oct 1, 2022) per IFAC. The City adopted a 2025 Transportation Impact Fee Study on 8/22/2025 raising fees "from 100% to over 250% for many categories," phasing fully in by Sept 2026; new per-single-family-unit dollar amounts are NOT publicly published (city TIF page and fee calculator return HTTP 403; ZoneFee states transportation amounts "not publicly available"). The $3,619 Area A figure is the documented adopted current-program collection rate (confidence: medium) and should be treated as a representative lower bound. 2) BOT PROTECTION: georgetowntexas.gov is hard-blocked at the server (HTTP 403). City figures obtained from the Laserfiche records portal (direct edoc PDF), revize.com CDN documents, and cloudfront-hosted report PDFs - all official city sources. During this verification the Laserfiche FY26 PDF and the revize IFAC PDF both downloaded successfully via curl with a desktop UA. 3) WATER vs WASTEWATER METER BASIS: residential base is the 3/4" meter (1 LUE). 5/8" variants are included as excluded rows. South Fork wastewater service area has identical wastewater impact-fee amounts (verified - same line values). 4) Per-unit single-family TOTAL of the additive (non-excluded) fee rows: water impact $11,000 + wastewater impact $7,000 + roadway impact ~$3,619 + water meter conn $640 + sewer tap $1,790 + water eng/insp $625 + wastewater eng/insp $625 + sewer tap eng/insp $625 + parkland dedication $780 + parkland development $1,200 = $27,904 per single-family dwelling (inside city, Service Area A, 3/4" meter), with the roadway component subject to substantial increase under the 2025 study.

Verify

confirmed 15 of 15 rows; dropped 0. Every row's amount and sourceQuote were re-confirmed against the cited primary source. FY26 Comprehensive Fee Schedule (sourceIndex 0): water impact 3/4" $11,000 (line 'WATER IMPACT FEE-3/4" $11,000.00 $11,000.00'), wastewater impact 3/4" $7,000 (Eff. 8/31/25 $7,000), water meter conn 3/4" inside $640 (was $350), sewer tap 4" inside $1,790 (was $300), water eng/insp SF $625 (was $500), wastewater eng/insp SF $625 (was $500), sewer tap eng/insp inside SF $625 (was $500), parkland dedication 1-2 units $780/unit, parkland development 1-2 units $1200/unit, water impact 5/8" $7,337, wastewater impact 5/8" $4,669 (Eff. 8/31/25) - all matched exactly. IFAC Recommendations PDF (sourceIndex 1): SF Area A $3,619 (Oct 1, 2022) and MF Area A $1,024 (Oct 1, 2022) - both matched exactly. Community Impact article (sourceIndex 5): water -> $12,000 on Aug. 31, 2026 and wastewater -> $10,250 on Aug. 31, 2026 - both matched verbatim (article also independently corroborated current $11,000 water and $7,000 wastewater). excludeFromTotal corrections: NONE - all flags were already correct. The 5/8" meter variants, the scheduled future-year increases ($12,000 / $10,250), and the multifamily roadway row are all correctly excluded; the 10 single-family additive rows are correctly included. No double-counting detected; recomputed included SF total = $27,904 (matches researcher's stated total). Roadway SF and MF rows retained at medium confidence (number confirmed, but program in transition per 2025 study). Sources index 2, 3, 4, and 6 were not the cited basis for any surviving fee amount and were not separately re-fetched (supporting/context sources only).

All "Proposed FY26 Fee" column values are the currently adopted/effective fees (FY26 began 10/1/2025). Water and wastewater impact fees are per LUE based on a 3/4" meter (= 1 residential LUE) and are levied city-wide. The roadway/transportation impact fee is the only major fee that is service-area dependent and is the largest source of uncertainty (see coverageNotes caveat #1). Connection/tap and engineering-inspection fees are additive to the impact fees. Parkland dedication and parkland development are separate, both per dwelling unit, both additive. All 15 rows independently re-verified against their cited sources on 2026-06-16; nothing dropped.

Sources

7 official sources · 13 high-confidence figures.

  1. 1City of Georgetown Comprehensive Fee Schedule FY26City of Georgetown, Texas (Laserfiche WebLink public records) · fee schedule · effective Oct 1, 2025 · retrieved Jun 16, 2026
  2. 2Transportation Impact Fees - Impact Fee Committee (IFAC) Recommendations (Jan 8, 2021)City of Georgetown, Texas · fee study · effective Mar 1, 2023 · retrieved Jun 16, 2026
  3. 32020 Transportation Impact Fee Study Final Report (Feb 2021)City of Georgetown, Texas (Kimley-Horn) · fee study · effective Mar 1, 2023 · retrieved Jun 16, 2026
  4. 4Transportation Impact Fee Semi-Annual Report (Q4 2024)City of Georgetown, Texas Planning and Zoning Commission · government report · effective Oct 15, 2024 · retrieved Jun 16, 2026
  5. 5Planning and Zoning Commission - 2025 Traffic Impact Fee Study Update (June 2025 presentation)City of Georgetown, Texas Planning and Zoning Commission · government report · effective Jun 13, 2025 · retrieved Jun 16, 2026
  6. 6Georgetown raises fees for new development, proposes increase to waste disposal ratesCommunity Impact · news article · effective Aug 22, 2025 · retrieved Jun 16, 2026
  7. 7Georgetown, TX Development Fees (citing City Construction Fee Schedule Rev. 11.5.2025 and Code of Ordinances Ch. 13.04/13.32)ZoneFee · other · effective Nov 5, 2025 · retrieved Jun 16, 2026

Georgetown impact fees — FAQ

How much are development impact fees in Georgetown, TX for a single-family home?
As of 2026-06-16, total development fees for a single-family detached home in Georgetown are about $26,114 per unit — roughly $5,599 in impact/development fees plus $20,515 in water/sewer connection fees. Figures are normalized from official sources; verify with the jurisdiction before relying on them.
Are impact fees in Georgetown the same as building permit fees?
No. Impact fees (and water/sewer connection fees) fund off-site capital — roads, parks, schools, utilities — and are charged per new dwelling unit. Building permit and plan-review fees are separate and are not included here.
How often do Georgetown's impact fees change?
Most jurisdictions adopt fees by ordinance and escalate them annually (often by a construction cost index), with occasional mid-year updates. Always confirm the current adopted schedule with the jurisdiction. ImpactFeeAtlas last verified Georgetown on 2026-06-16.

Compare impact fees in nearby Texas jurisdictions

Cities with a similar fee burden

Jurisdictions in other states with total single-family fees close to Georgetown’s $26,114 per home.