ImpactFeeAtlasCompare fees
CityKootenai CountyVerified Jun 17, 2026

Post Falls, ID Development Impact Fees (2026)

Normalized development impact fees, water & sewer connection (tap/SDC) fees, and mitigation fees for Post Falls, Idaho — per dwelling unit, by category, with links to every official source.

$25,120
Total per single-family home
impact + connection fees
$14,221
Impact / development fees
roads, parks, schools…
$10,899
Water & sewer connection
tap / capacity / SDC
$10,228
Per multifamily unit
total fees / unit

What a single-family home pays in Post Falls

$25,120 total per unit across 6 fee categories.

  • Sewer connection (tap / SDC)$7,621
  • Parks & recreation$6,721
  • Transportation / roads$4,758
  • Water connection (tap / SDC)$3,278
  • Public safety$1,444
  • Fire / EMS$1,298

Post Falls’s $25,120 is about 1.3× the Idaho tracked median of $19,153 — among the higher-cost places to build in the state.

Full fee schedule — single-family

Impact / development fees

Fee (local term)BasisAmountSource · effective
Parks & recreation
Parks & Recreation Development Impact Fee — City of Post Falls Parks & Recreation development impact fee, charged per single-family housing unit. Confirmed VERBATIM in the official Fee Schedule PDF (Revised 10-1-2025), IMPACT FEES table, Single-Family row. NOTE (verification): the researcher cited the 2021 TischlerBise study (sourceIndex 2) but that study shows a DIFFERENT max-allowable figure of $3,721 SF; the $6,721 figure is the currently adopted/published amount and is confirmed in the official Fee Schedule PDF, so this row was re-attributed to sourceIndex 0.
per dwelling unit$6,721City of Post Falls, ID
Oct 1, 2025High
Public safety
Public Safety (Police) Development Impact Fee — City of Post Falls Public Safety (police) development impact fee per single-family housing unit. Confirmed VERBATIM in official Fee Schedule PDF IMPACT FEES table. Re-attributed from sourceIndex 2 to sourceIndex 0 (2021 study showed max-allowable $452 SF; adopted figure is $1,302).
per dwelling unit$1,302City of Post Falls, ID
Oct 1, 2025High
Transportation / roads
Streets Development Impact Fee — City of Post Falls Streets/roads development impact fee per single-family housing unit. Confirmed VERBATIM in official Fee Schedule PDF IMPACT FEES table. Re-attributed from sourceIndex 2 to sourceIndex 0 (2021 study showed max-allowable $1,510 SF). This is the CITY street impact fee; no separate per-unit Post Falls Highway District road impact fee was found published.
per dwelling unit$3,311City of Post Falls, ID
Oct 1, 2025High
Transportation / roads
Multimodal Paths Development Impact Fee — City of Post Falls Multimodal Paths development impact fee per single-family housing unit (additive to Streets fee; distinct transportation category). Confirmed VERBATIM in official Fee Schedule PDF IMPACT FEES table. Re-attributed from sourceIndex 2 to sourceIndex 0 (2021 study showed max-allowable $869 SF).
per dwelling unit$1,447City of Post Falls, ID
Oct 1, 2025High
Fire / EMS
Fire Development Impact Fee — Fire development impact fee per single-family housing unit, confirmed VERBATIM in the official Fee Schedule PDF IMPACT FEES table (Fire column). Confidence raised from medium to high on verification: it is a line item in the City's adopted Fee Schedule (not merely inferred from fund accounting). The 2021 City TischlerBise study did NOT include Fire/EMS (it covered only parks/public safety/streets/multimodal); Fire/EMS reflect a Kootenai County Fire & Rescue district component collected by the City at permit issuance.
per dwelling unit$1,298City of Post Falls, ID
Oct 1, 2025High
Public safety
EMS Development Impact Fee — EMS development impact fee per single-family housing unit, confirmed VERBATIM in the official Fee Schedule PDF IMPACT FEES table (EMS column). Confidence raised from medium to high on verification. Same $142 applies to multifamily. Categorized under public_safety (EMS). Not part of the 2021 TischlerBise study.
per dwelling unit$142City of Post Falls, ID
Oct 1, 2025High

Water & sewer connection fees

Fee (local term)BasisAmountSource · effective
Sewer connection (tap / SDC)
Sewer Capitalization Fee (1 Service Unit / Single Family) — City of Post Falls sewer (wastewater) capitalization/connection fee = 1 Service Unit = $7,621.00 for a single-family dwelling. Confirmed VERBATIM in the official Fee Schedule PDF (Revised 10-1-2025), SEWER CAPITALIZATION section. Commercial/Industrial is a minimum of $7,621 plus $7,621 per each additional 5,000 gallons of reclaimed water flow above the first 5,000 gal/month.
per dwelling unit$7,621City of Post Falls, ID
Oct 1, 2025High
Water connection (tap / SDC)
Water Capitalization Fee (3/4"-1" Residential meter) — City of Post Falls water capitalization/connection fee for a standard residential 3/4"-1" service. Confirmed VERBATIM in official Fee Schedule PDF (Revised 10-1-2025), WATER CAPITALIZATION section. Base residential meter (primary, representative). Does NOT include the cost of the meter itself ('Water Meter = Cost of Meter') or the separate 'Typical Dig In' service installation charge.
per meter$3,278City of Post Falls, ID
Oct 1, 2025High
Sewer connection (tap / SDC)
Sewer Connection / Hookup Fee — Flat sewer connection/hookup administrative fee, additive to the sewer capitalization fee. Confirmed VERBATIM in official Fee Schedule PDF (Revised 10-1-2025).
$5City of Post Falls, ID
Oct 1, 2025High
Water connection (tap / SDC)
Water Service Installation 'Typical Dig In' (1") — Physical water service-line installation ('dig in') cost, separate from the capitalization fee and only charged when the City installs the service tap. Confirmed VERBATIM in official Fee Schedule PDF. Correctly excluded from the impact-fee total as it is a construction/installation charge, not a capacity/impact fee. 1.5" Service = $3,960.00; 2" Service = $4,702.50.
alternative · not added to total
$2,351City of Post Falls, ID
Oct 1, 2025High

Full fee schedule — multifamily

Impact / development fees

Fee (local term)BasisAmountSource · effective
Parks & recreation
Parks & Recreation Development Impact Fee (Multifamily) — City of Post Falls Parks impact fee per multifamily unit. Confirmed VERBATIM in official Fee Schedule PDF IMPACT FEES table, Multi-Family row. Part of multifamily impact-fee total of $10,370/unit. Re-attributed from sourceIndex 2 to sourceIndex 0.
per dwelling unit$5,004City of Post Falls, ID
Oct 1, 2025High
Public safety
Public Safety (Police) Development Impact Fee (Multifamily) — City of Post Falls Public Safety (police) impact fee per multifamily unit. Confirmed VERBATIM in official Fee Schedule PDF IMPACT FEES table. Re-attributed from sourceIndex 2 to sourceIndex 0.
per dwelling unit$978City of Post Falls, ID
Oct 1, 2025High
Transportation / roads
Streets Development Impact Fee (Multifamily) — City of Post Falls Streets impact fee per multifamily unit. Confirmed VERBATIM in official Fee Schedule PDF IMPACT FEES table. Re-attributed from sourceIndex 2 to sourceIndex 0.
per dwelling unit$1,871City of Post Falls, ID
Oct 1, 2025High
Transportation / roads
Multimodal Paths Development Impact Fee (Multifamily) — City of Post Falls Multimodal Paths impact fee per multifamily unit (additive transportation category). Confirmed VERBATIM in official Fee Schedule PDF IMPACT FEES table. Re-attributed from sourceIndex 2 to sourceIndex 0.
per dwelling unit$1,077City of Post Falls, ID
Oct 1, 2025High
Fire / EMS
Fire Development Impact Fee (Multifamily) — Fire impact fee per multifamily unit, confirmed VERBATIM in official Fee Schedule PDF IMPACT FEES table (Fire column). Same flat $1,298 as single-family per the City schedule. Confidence raised from medium to high on verification. Kootenai County Fire & Rescue district component collected by City at permit.
per dwelling unit$1,298City of Post Falls, ID
Oct 1, 2025High

Coverage & caveats

RESIDENTIAL DEVELOPMENT IMPACT FEES (City of Post Falls, per housing unit, effective FY2026 / 10-1-2025), confirmed VERBATIM in the official Fee Schedule PDF (Revised 10-1-2025) IMPACT FEES table: Single-Family total = $14,221 (Parks $6,721 + Public Safety/Police $1,302 + Streets $3,311 + Multimodal $1,447 + Fire $1,298 + EMS $142). Multi-Family total = $10,370 (Parks $5,004 + Public Safety $978 + Streets $1,871 + Multimodal $1,077 + Fire $1,298 + EMS $142). The schedule also lists non-residential impact fees per square foot of floor area (Commercial/Shopping Center $10.10/sf, Office $4.42/sf, Light Industrial $2.64/sf, etc.) which were not requested as individual rows here. ATTRIBUTION OF SEPARATE-DISTRICT FEES: Fire ($1,298) and EMS ($142) are line items in the City's adopted Fee Schedule IMPACT FEES table and reflect Kootenai County Fire & Rescue / Kootenai County EMS components collected by the City at building-permit issuance. The 2021 City TischlerBise study covered only parks/public safety/streets/multimodal (NOT fire/EMS). No separate per-unit Post Falls Highway District road impact fee was found published; City road impacts are captured by Streets + Multimodal. WATER & SEWER CONNECTION/CAPACITY FEES (official Fee Schedule PDF, Revised 10-1-2025, all confirmed verbatim): Water Capitalization $3,278 for the standard 3/4\"-1\" residential meter (primary; larger meter sizes are mutually-exclusive excluded variants); Sewer Capitalization $7,621 per 1 Service Unit (single-family); plus a flat $5.00 Sewer Connection/Hookup. 'Water Meter = Cost of Meter' and the 'Typical Dig In' service-installation charges ($2,351.25 for 1\") are physical-install costs, not capacity fees (1\" dig-in included as excluded variant). Utility Deposit $60 (refundable, not an impact fee — omitted). WHAT DOES NOT EXIST HERE: NO school impact fees — the 2021 TischlerBise report states verbatim, repeatedly, 'Per City of Post Falls policy, impact fees are not charged for public schools or public charter schools.' No standalone library/drainage/open-space/affordable-housing/general-government impact fee (Public Safety covers police). No standalone mitigation fee schedule. CAVEATS / CONFIDENCE: (1) The currently published per-unit impact fees ($6,721 parks SF etc.) exceed the 2021 TischlerBise study's max-allowable figures (Parks $3,721, Public Safety $452, Streets $1,510, Multimodal $869 SF) — confirmed by independently reading the 2021 study PDF. The published schedule reflects the City's adopted/escalated amounts plus the separately-collected Fire/EMS. (2) The City was in Phase II of an impact-fee update study as of May 14, 2025 (confirmed via Coeur d'Alene Press) — figures may change; verify the latest adopted resolution before relying on them. (3) The legacy postfallsidaho.org domain that hosted an impact-fee summary page is being phased out; figures here were verified against the live official postfalls.gov Fee Schedule PDF. VERIFY: confirmed 17 of 17 rows; dropped 0. CORRECTIONS MADE: (a) Re-attributed all 11 impact-fee rows from sourceIndex 2 (2021 TischlerBise study) to sourceIndex 0 (official Fee Schedule PDF), because the amounts appear VERBATIM in the official adopted Fee Schedule but do NOT match the 2021 study (which shows different max-allowable figures) — the researcher's original sourceQuotes referencing source 2 were not present in source 2. Updated all impact-fee sourceQuotes to the verbatim IMPACT FEES table text. (b) Raised confidence on the 3 Fire/EMS rows from medium to high, since they are explicit line items in the adopted Fee Schedule IMPACT FEES table rather than inferred from fund accounting. (c) Removed two non-load-bearing sources (sourceIndex 2 'Fee Schedule public hearing page' and sourceIndex 3 Citizen Portal news article) and renumbered remaining sources; the dead/redirected postfallsidaho.org reference was dropped from the source list. excludeFromTotal corrections: none needed — the 1\" Commercial water meter variant and the 1\" Typical Dig In install charge were both already correctly marked excludeFromTotal=true; verified the representative SF total (impact $14,221 + water $3,278 + sewer $7,621 + $5 hookup) does not double-count meter sizes or install charges.

All amounts are in current US dollars per the City of Post Falls Fee Schedule effective October 1, 2025 (FY2026), confirmed verbatim against the official Fee Schedule PDF (Revised 10-1-2025). Impact fees are assessed per housing unit and collected at building-permit issuance. Representative single-family total impact fee = $14,221/unit; representative multifamily = $10,370/unit. Add water capitalization ($3,278, 3/4\"-1\" residential), sewer capitalization ($7,621/service unit), and $5 sewer hookup for the typical new single-family connection. Excluded rows are mutually-exclusive meter sizes or physical service-installation/deposit charges, not capacity/impact fees.

Sources

3 official sources · 16 high-confidence figures.

  1. 1City of Post Falls Community Development Fee Schedule (Revised 10-1-2025)City of Post Falls, ID · fee schedule · effective Oct 1, 2025 · retrieved Jun 17, 2026
  2. 2Capital Improvement Plan and Development Impact Fee Report (TischlerBise, March 19, 2021)City of Post Falls, ID / TischlerBise · fee study · effective Mar 19, 2021 · retrieved Jun 17, 2026
  3. 3Post Falls advances to Phase II of impact fee studyCoeur d'Alene Press · news article · effective May 14, 2025 · retrieved Jun 17, 2026

Post Falls impact fees — FAQ

How much are development impact fees in Post Falls, ID for a single-family home?
As of 2026-06-17, total development fees for a single-family detached home in Post Falls are about $25,120 per unit — roughly $14,221 in impact/development fees plus $10,899 in water/sewer connection fees. Figures are normalized from official sources; verify with the jurisdiction before relying on them.
What are the impact fees per multifamily unit in Post Falls, ID?
Total development fees for a multifamily unit in Post Falls are about $10,228 per unit as of 2026-06-17.
Are impact fees in Post Falls the same as building permit fees?
No. Impact fees (and water/sewer connection fees) fund off-site capital — roads, parks, schools, utilities — and are charged per new dwelling unit. Building permit and plan-review fees are separate and are not included here.
How often do Post Falls's impact fees change?
Most jurisdictions adopt fees by ordinance and escalate them annually (often by a construction cost index), with occasional mid-year updates. Always confirm the current adopted schedule with the jurisdiction. ImpactFeeAtlas last verified Post Falls on 2026-06-17.

More Idaho jurisdictions