ImpactFeeAtlasCompare fees
CountyVerified Jun 16, 2026

Hillsborough County, FL Development Impact Fees (2026)

A new single-family home in Hillsborough County, Florida pays about $31,763 in total development impact and water/sewer connection fees per unit as of Jun 16, 2026 — about $21,257 in impact/development fees plus $10,506 in water & sewer connection (tap/SDC) fees. Every figure below is normalized per dwelling unit by category, with a link to its official source.

$31,763
Total per single-family home
impact + connection fees
$21,257
Impact / development fees
roads, parks, schools…
$10,506
Water & sewer connection
tap / capacity / SDC
$6,910
Per multifamily unit
total fees / unit

What a single-family home pays in Hillsborough County

$31,763 total per unit across 6 fee categories.

  • Transportation / roads$10,550
  • Schools$8,227
  • Water connection (tap / SDC)$5,621
  • Sewer connection (tap / SDC)$4,885
  • Parks & recreation$2,145
  • Fire / EMS$335

Hillsborough County’s $31,763 is close to the Florida tracked median of $29,203.

Full fee schedule — single-family detached

Impact / development fees

Fee (local term)BasisAmountSource · effective
Transportation / roads
Mobility Fee (replaces transportation/road impact fee) — Mobility fee for the 2,500 sf-or-greater single-family tier, Urban (Urban Assessment District) zone — chosen as the representative ~2,000-2,500+ sf SF home. Rural zone is $14,938 (see excluded row). Tiered by living area; this is the top SF tier. Hillsborough has NO separate transportation impact fee — it was replaced by the mobility fee. VERIFIED against source PDF: 'Single Family (including Duplex/Triplex) (2,500 square feet or greater living area) $10,550 $14,938'.
per dwelling unit$10,550Hillsborough County, FL (Development Services)
Oct 1, 2022Highdated 2022
Transportation / roads
Mobility Fee (1,500-2,499 sf tier, Urban) — Alternate SF tier (1,500-2,499 sf, Urban zone). Excluded to avoid double counting with the primary mobility row. Rural = $13,038. VERIFIED verbatim.
alternative · not added to total
per dwelling unit$9,183Hillsborough County, FL (Development Services)
Oct 1, 2022Highdated 2022
Transportation / roads
Mobility Fee (Rural zone, 2,500+ sf) — Mutually-exclusive zone variant: Rural Assessment District. Excluded; Urban zone used as primary. VERIFIED verbatim.
alternative · not added to total
per dwelling unit$14,938Hillsborough County, FL (Development Services)
Oct 1, 2022Highdated 2022
Parks & recreation
Park Impact Fee — Park impact fee for the 2,000-2,499 sf living-area tier (representative ~2,000-2,500 sf SF home). Countywide / not zone-specific. Tiered by living area from $777 (<500 sf) up to $2,742 (4,000+ sf). VERIFIED verbatim.
per dwelling unit$2,145Hillsborough County, FL (Development Services)
Oct 1, 2022Highdated 2022
Parks & recreation
Park Impact Fee (2,500-2,999 sf tier) — Adjacent park fee tier (2,500-2,999 sf). Excluded to avoid double counting; the 2,000-2,499 sf tier is the primary park row. VERIFIED verbatim.
alternative · not added to total
per dwelling unit$2,299Hillsborough County, FL (Development Services)
Oct 1, 2022Highdated 2022
Schools
School Impact Fee (Countywide) — School impact fee for the 1,800-2,499 sf living-area tier (representative ~2,000-2,500 sf SF home). Countywide. Collected by Hillsborough County on behalf of Hillsborough County Public Schools. Tiered from $1,645 (<900 sf) up to $10,976 (3,400+ sf). VERIFIED verbatim.
per dwelling unit$8,227Hillsborough County, FL (Development Services)
Oct 1, 2022Highdated 2022
Schools
School Impact Fee (2,500-3,399 sf tier) — Adjacent school fee tier (2,500-3,399 sf). Excluded to avoid double counting; the 1,800-2,499 sf tier is primary. VERIFIED verbatim.
alternative · not added to total
per dwelling unit$9,369Hillsborough County, FL (Development Services)
Oct 1, 2022Highdated 2022
Fire / EMS
Fire Impact Fee — Fire service impact fee per single-family detached unit (flat, not size-tiered). Covers fire/EMS. VERIFIED verbatim.
per dwelling unit$335Hillsborough County, FL (Development Services)
Oct 1, 2022Highdated 2022

Water & sewer connection fees

Fee (local term)BasisAmountSource · effective
Water connection (tap / SDC)
Water Impact (Capacity) Fee - Single Family — Potable water impact (capacity) fee per dwelling unit / 1 ERC, South-Central Service Area (the larger urban service area east/south of Tampa) used as primary. Northwest Service Area = $2,037.50 (see excluded row). Current rate effective March 23, 2026 (R25-111). Meter sizing is independent of impact fee determination. VERIFIED against Section 1.1 WATER IMPACT FEES table.
per dwelling unit$3,449Hillsborough County, FL Water Resources Department
Mar 23, 2026High
Water connection (tap / SDC)
Water Impact Fee - Single Family (Northwest Service Area) — Mutually-exclusive service-area variant (Northwest). Excluded; South/Central used as primary. VERIFIED verbatim.
alternative · not added to total
per dwelling unit$2,038Hillsborough County, FL Water Resources Department
Mar 23, 2026High
Sewer connection (tap / SDC)
Wastewater Impact (Capacity) Fee - Single Family — Wastewater impact (capacity) fee per dwelling unit / 1 ERC, South-Central Service Area used as primary. Northwest = $3,268.75 (see excluded row). 1 ERC = 200 gpd wastewater. Current rate effective March 23, 2026 (R25-111). LPSS (low-pressure sewer) connections receive a 20% flow reduction. VERIFIED against Section 1.2 WASTEWATER IMPACT FEES table.
per dwelling unit$4,885Hillsborough County, FL Water Resources Department
Mar 23, 2026High
Sewer connection (tap / SDC)
Wastewater Impact Fee - Single Family (Northwest Service Area) — Mutually-exclusive service-area variant (Northwest). Excluded; South/Central used as primary. VERIFIED verbatim.
alternative · not added to total
per dwelling unit$3,269Hillsborough County, FL Water Resources Department
Mar 23, 2026High
Water connection (tap / SDC)
Accrued Guaranteed Revenue Fee (AGRF) - Water + Wastewater — Additive (not excluded): Accrued Guaranteed Revenue Fee charged in ADDITION to impact fees on each new connection, per ERC, all service areas. Combined water+wastewater = $1,822 ($833 water + $989 wastewater). Recovers carrying cost of unused capacity (up to 6 years). Reduced to O&M-only ($483 water + $479 wastewater = $962) if impact fees fully prepaid. VERIFIED against Section 1.3 AGRF table: Residential row, 'Potable Water & Wastewater $1,822.00', header 'Customer Class (Per ERC) – All Service Areas'. Parenthetical in quote is a paraphrase of those table headers; the figure and substance are exact.
per meter$1,822Hillsborough County, FL Water Resources Department
Mar 23, 2026High
Water connection (tap / SDC)
Water Meter Installation Charge (5/8" x 3/4" residential meter) — Additive (not excluded): physical meter-installation charge for a standard 5/8"x3/4" residential meter. $215 if pre-tapped connection. Separate from and in addition to the water/wastewater impact (capacity) fees. VERIFIED against Section 1.7 METER-INSTALLATION CHARGES table: '5/8" x 3/4" $350.00 $215.00' under columns 'Meter Installation' / 'Pre-Tapped Connection'.
per meter$350Hillsborough County, FL Water Resources Department
Mar 23, 2026High

Multifamily (per unit) impact fees in Hillsborough County

About $6,910 per unit.

Impact / development fees

Fee (local term)BasisAmountSource · effective
Transportation / roads
Mobility Fee (Multi-Family Low-Rise, Urban) — Multifamily low-rise (1-2 levels), Urban zone, per dwelling unit. Mid-rise = $4,864 Urban; high-rise = $3,912 Urban. Rural low-rise = $9,445. VERIFIED verbatim.
per dwelling unit$6,661Hillsborough County, FL (Development Services)
Oct 1, 2022Highdated 2022
Fire / EMS
Fire Impact Fee (Multi-Family) — Fire service impact fee per multifamily dwelling unit. VERIFIED verbatim.
per dwelling unit$249Hillsborough County, FL (Development Services)
Oct 1, 2022Highdated 2022

Coverage & caveats

WHAT EXISTS in Hillsborough County (residential): (1) Mobility Fee (replaced the transportation/road impact fee in 2020) — zoned Urban vs Rural, tiered by SF living area; (2) Park Impact Fee — countywide, tiered by living area; (3) School Impact Fee — countywide, tiered by living area, collected for Hillsborough County Public Schools; (4) Fire Service Impact Fee — flat per unit. The county's own page confirms "new residential development pays three impact fees [park, school, fire], plus a mobility fee." Separately, the Water Resources Department levies Water and Wastewater Impact (capacity) Fees per ERC by service area (Northwest vs South/Central), an additive Accrued Guaranteed Revenue Fee (AGRF), and a meter-installation charge. WHAT DOES NOT EXIST here: NO county police / law-enforcement impact fee; NO library impact fee; NO drainage/stormwater impact fee; NO open-space impact fee; NO standalone county affordable-housing impact (linkage) fee; NO general/capital-facilities impact fee. Hillsborough's residential impact-fee categories are limited to mobility, park, school, and fire.

Currency/caveats

The mobility/park/school/fire schedule is the county's adopted "Estimated Residential Impact/Mobility Fee Assessment" effective October 1, 2022 — still the current hosted schedule on hcfl.gov (no newer county-side update located). The water/wastewater impact fees, AGRF, and meter charges are from the FY26 Schedule of Rates effective March 23, 2026 (R25-111, adopted Dec 17, 2025), which are current as of the verification date (2026-06-16).

Relief programs

affordable multifamily can receive up to ~90% relief on park, fire, and mobility fees, and there is a 10-year impact-fee deferral for affordable rental apartments (not reflected in the standard amounts above). City of Tampa (incorporated) parcels are served by Tampa's own utility and are outside these county utility fees; figures here apply to UNINCORPORATED Hillsborough County.

Adu

no separate ADU impact-fee row is published — accessory units are assessed under the applicable single-family/multifamily living-area tier. All amounts are quoted verbatim from official Hillsborough County PDFs.

Verify

confirmed 17 of 17 rows; dropped 0. Both cited PDF sources were independently re-fetched (source 0 = Residential Impact/Mobility Fee Assessment eff. 10-1-2022; source 1 = FY26 Schedule of Rates eff. 3-23-2026) and every amount AND sourceQuote matched the source text. Source 0 confirmed: Mobility SF 2,500+ Urban $10,550 / Rural $14,938; Mobility SF 1,500-2,499 Urban $9,183 / Rural $13,038; Mobility MF Low-Rise Urban $6,661 / Rural $9,445; Park 2,000-2,499 sf $2,145; Park 2,500-2,999 sf $2,299; School 1,800-2,499 sf $8,227; School 2,500-3,399 sf $9,369; Fire SF Detached $335.00; Fire Multi-Family $249.00. Source 1 confirmed: Water Impact SF S/Central $3,449.00 / NW $2,037.50; Wastewater Impact SF S/Central $4,884.75 / NW $3,268.75; AGRF Residential Water+Wastewater $1,822.00 (per ERC, all service areas); Meter Install 5/8\"x3/4\" $350.00 (pre-tapped $215.00). excludeFromTotal corrections: none required — all six mutually-exclusive variants (Mobility 1,500-2,499 Urban, Mobility Rural 2,500+, Park 2,500-2,999, School 2,500-3,399, Water NW, Wastewater NW) were already correctly flagged excludeFromTotal=true, and the two additive utility charges (AGRF $1,822, meter install $350) were correctly left in the total per the source text stating AGRF and meter charges are "in addition to impact fees." Representative S/Central SF total (mobility+park+school+fire+water+wastewater+AGRF+meter = ~$31,763) confirmed non-double-counting. Note: the AGRF sourceQuote contains a parenthetical paraphrase of the table column/row headers ("Residential, Per ERC, All Service Areas") rather than a literal contiguous string, but the $1,822.00 figure and its applicability are exact in the source; confidence retained at high.

Total one-time residential development charge for a representative ~2,000-2,500 sf single-family detached home in the South/Central (urban) service area, paid before building permit, is approximately: Mobility $10,550 + Park $2,145 + School $8,227 + Fire $335 = $21,257 in county impact/mobility fees; PLUS water/sewer connection charges: Water impact $3,449 + Wastewater impact $4,884.75 + AGRF (water+sewer) $1,822 + meter install $350 = $10,505.75 in utility connection fees. Combined ~$31,763 for a S/Central-served SF home. Note the mobility, park, school, and fire fees are tiered by living-area square footage; figures shown use the tier covering ~2,000-2,500 sf. Utility (water/sewer) figures are the South/Central Service Area; Northwest Service Area is materially lower (water $2,037.50 / sewer $3,268.75).

Sources

5 official sources · 16 high-confidence figures.

  1. 1Estimated Residential Impact/Mobility Fee Assessment by Zone Per Dwelling Unit (effective October 1, 2022)Hillsborough County, FL (Development Services) · fee schedule · effective Oct 1, 2022 · retrieved Jun 16, 2026
  2. 2FY26 Schedule of Rates for Water Resources Department Utility System Services (effective March 23, 2026, incorporating R25-111 impact fee rates)Hillsborough County, FL Water Resources Department · fee schedule · effective Mar 23, 2026 · retrieved Jun 16, 2026
  3. 3Impact Fees | Hillsborough County, FLHillsborough County, FL · municipal webpage · retrieved Jun 16, 2026
  4. 4Mobility Fees | Hillsborough County, FLHillsborough County, FL · municipal webpage · retrieved Jun 16, 2026
  5. 5Water Rates & Fees | Hillsborough County, FLHillsborough County, FL Water Resources Department · municipal webpage · retrieved Jun 16, 2026

Hillsborough County impact fees — FAQ

How much are development impact fees in Hillsborough County, FL for a single-family home?
As of 2026-06-16, total development fees for a single-family detached home in Hillsborough County are about $31,763 per unit — roughly $21,257 in impact/development fees plus $10,506 in water/sewer connection fees. Figures are normalized from official sources; verify with the jurisdiction before relying on them.
What are the impact fees per multifamily unit in Hillsborough County, FL?
Total development fees for a multifamily unit in Hillsborough County are about $6,910 per unit as of 2026-06-16.
Are impact fees in Hillsborough County the same as building permit fees?
No. Impact fees (and water/sewer connection fees) fund off-site capital — roads, parks, schools, utilities — and are charged per new dwelling unit. Building permit and plan-review fees are separate and are not included here.
How often do Hillsborough County's impact fees change?
Most jurisdictions adopt fees by ordinance and escalate them annually (often by a construction cost index), with occasional mid-year updates. Always confirm the current adopted schedule with the jurisdiction. ImpactFeeAtlas last verified Hillsborough County on 2026-06-16.

Compare impact fees in nearby Florida jurisdictions

Cities with a similar fee burden

Jurisdictions in other states with total single-family fees close to Hillsborough County’s $31,763 per home.