ImpactFeeAtlasCompare fees
CountyVerified Jun 17, 2026

Brevard County, FL Development Impact Fees (2026)

Normalized development impact fees, water & sewer connection (tap/SDC) fees, and mitigation fees for Brevard County, Florida — per dwelling unit, by category, with links to every official source.

$9,838
Total per single-family home
impact + connection fees
$9,838
Impact / development fees
roads, parks, schools…
$0
Water & sewer connection
tap / capacity / SDC
$4,574
Per multifamily unit
total fees / unit

What a single-family home pays in Brevard County

$9,838 total per unit across 6 fee categories.

  • Schools$5,097
  • Transportation / roads$4,353
  • General government / capital$160
  • Fire / EMS$92.73
  • Police$71.99
  • Library$63.84

At $9,838, Brevard County is below the Florida tracked median of $29,203 — relatively affordable to build in.

Full fee schedule — single-family

Impact / development fees

Fee (local term)BasisAmountSource · effective
Transportation / roads
Transportation Impact Fee — Unincorporated County — Table 1 (Unincorporated County, City of West Melbourne, Town of Palm Shores, Town of Grant-Valkaria). Flat per dwelling unit, NOT tiered by home size. Frozen at the Jan 2, 2017 rate (a 2016 study recommended a 67% increase that the Commission did not adopt; a comprehensive study to update all impact fees is only now underway per source 5). VERIFIED verbatim against the Wayback-archived official schedule (source 1).
per dwelling unit$4,353Brevard County Planning & Development Department
Jan 2, 2017Highdated 2017
Schools
Educational Facilities (School) Impact Fee — Florida permits school impact fees and Brevard County levies one ('Educational Facilities'). Largest single residential impact fee. Same amount applies in all jurisdiction tables (Tables 1-5). VERIFIED verbatim against source 0/1 (Table 1 Education column = $5,096.50).
per dwelling unit$5,097Brevard County Planning & Development Department
Jan 2, 2017Highdated 2017
Fire / EMS
Fire/Rescue Impact Fee — Unincorporated County — Fire/Rescue column, Table 1 (unincorporated county). Fire/Rescue is 'Not Applicable' in several incorporated cities that have their own fire fees (Tables 2-4); it applies in the unincorporated county. Per source 5, fire/EMS impact fees are reported as roughly two decades old and are the trigger for the new comprehensive fee study. VERIFIED verbatim against source 0/1.
per dwelling unit$54.08Brevard County Planning & Development Department
Jan 2, 2017Highdated 2017
Fire / EMS
Emergency Medical Services (EMS) Impact Fee — Separate EMS impact fee, additive to the Fire/Rescue fee. Applies countywide (same $38.65 in all five tables). Mapped to 'fire' category (no dedicated EMS enum). VERIFIED verbatim against source 0/1.
per dwelling unit$38.65Brevard County Planning & Development Department
Jan 2, 2017Highdated 2017
Police
Correctional Facilities Impact Fee (jail capacity) — Brevard County has NO general 'law enforcement / police' impact fee, but it does levy a Correctional Facilities (county jail capacity) impact fee, which is the closest public-safety/law-enforcement-type fee. Mapped to the 'police' category as the nearest enum. Same $71.99 in all five tables. VERIFIED verbatim against source 0/1.
per dwelling unit$71.99Brevard County Planning & Development Department
Jan 2, 2017Highdated 2017
Library
Library Facilities Impact Fee — Library Facilities impact fee, Table 1. Library is 'Not Applicable' in City of Cape Canaveral (Table 4) but applies in the unincorporated county. VERIFIED verbatim against source 0/1.
per dwelling unit$63.84Brevard County Planning & Development Department
Jan 2, 2017Highdated 2017
General government / capital
Solid Waste Impact Fee — Solid Waste (landfill capacity) impact fee — an unusual category most counties don't have. Mapped to 'general' (no solid-waste enum). $160.00 for deeded-lot residential in all tables. VERIFIED verbatim against source 0/1.
per dwelling unit$160Brevard County Planning & Development Department
Jan 2, 2017Highdated 2017

Full fee schedule — multifamily

Impact / development fees

Fee (local term)BasisAmountSource · effective
Transportation / roads
Transportation Impact Fee — Multifamily (Apartment, 3+ stories) — Representative multifamily transportation fee (Apartment, 3+ stories), Table 1. Lower-rise MF (Duplex/Townhouse/Condo/Apartment 1-2 stories) is $2,677.00 and Townhouse/Condo 3+ stories is also $2,381.00. VERIFIED verbatim against source 0/1.
per dwelling unit$2,381Brevard County Planning & Development Department
Jan 2, 2017Highdated 2017
Schools
Educational Facilities (School) Impact Fee — Multifamily — School impact fee for all attached/multifamily residential types (duplex, townhouse, condo, apartment) = $1,940.50/unit regardless of stories (vs $5,096.50 for single-family detached). VERIFIED verbatim against source 0/1.
per dwelling unit$1,941Brevard County Planning & Development Department
Jan 2, 2017Highdated 2017
Fire / EMS
Fire/Rescue Impact Fee — Multifamily (Apartment, 3+ stories) — Fire/Rescue for Apartment 3+ stories, Table 1 (unincorporated county). Other MF tiers: 1-2 story apartment $47.13, townhouse/condo 3+ $32.41, 1-2 story duplex/townhouse/condo $49.29. VERIFIED verbatim against source 0/1.
per dwelling unit$30.99Brevard County Planning & Development Department
Jan 2, 2017Highdated 2017
Fire / EMS
EMS Impact Fee — Multifamily (Apartment, 3+ stories) — EMS for Apartment 3+ stories, additive to Fire/Rescue. VERIFIED verbatim against source 0/1.
per dwelling unit$22.15Brevard County Planning & Development Department
Jan 2, 2017Highdated 2017
Police
Correctional Facilities Impact Fee — Multifamily (Apartment, 3+ stories) — Correctional Facilities (jail) impact fee for Apartment 3+ stories. VERIFIED verbatim against source 0/1.
per dwelling unit$41.25Brevard County Planning & Development Department
Jan 2, 2017Highdated 2017
Library
Library Facilities Impact Fee — Multifamily (Apartment, 3+ stories) — Library Facilities fee for apartments. Townhouse/Condo MF types carry $55.59. VERIFIED verbatim against source 0/1.
per dwelling unit$37.91Brevard County Planning & Development Department
Jan 2, 2017Highdated 2017
General government / capital
Solid Waste Impact Fee — Multifamily (Apartment, 3+ stories) — Solid Waste fee for condo/apartment units is $120.00 (vs $160.00 for deeded-lot single-family and townhouses). VERIFIED verbatim against source 0/1.
per dwelling unit$120Brevard County Planning & Development Department
Jan 2, 2017Highdated 2017
Transportation / roads
Transportation Impact Fee — Multifamily 1-2 story (Duplex/Townhouse/Condo/Apartment) [alternate tier] — Alternate (lower-rise) multifamily transportation tier; excluded from total to avoid double-counting with the representative MF row ($2,381 apartment 3+ stories). VERIFIED verbatim against source 0/1. excludeFromTotal flag CONFIRMED CORRECT.
alternative · not added to total
per dwelling unit$2,677Brevard County Planning & Development Department
Jan 2, 2017Highdated 2017

Coverage & caveats

All figures are from the official Brevard County Residential Impact Fee Schedule, effective January 2, 2017 (sources 0/1), the single consolidated countywide schedule Brevard uses. WHAT EXISTS: Brevard County collects exactly SEVEN impact-fee categories countywide, confirmed verbatim on the County's Impact Fees Home page (source 2): Transportation, Educational Facilities (school), Fire/Rescue, Emergency Medical Services (EMS), Correctional Facilities (county jail capacity), Library Facilities, and Solid Waste (landfill capacity). The County assesses/collects impact fees for the unincorporated county AND all 16 cities, but amounts vary by jurisdiction per inter-local agreement (the schedule has 5 tables). The PRIMARY rows here use TABLE 1 = Unincorporated County (plus West Melbourne, Palm Shores, Grant-Valkaria) — the correct table for a builder in the unincorporated county. Single-family detached totals (Table 1): Transportation $4,353.00 + School $5,096.50 + Fire/Rescue $54.08 + EMS $38.65 + Correctional $71.99 + Library $63.84 + Solid Waste $160.00 = $9,838.06 total (verified verbatim against the schedule's printed Total). Fees are NOT tiered by home square footage — single rate per dwelling for detached; multifamily is tiered by type/stories (duplex/townhouse/condo/apartment, 1-2 vs 3+ stories). CURRENCY: These 2017 rates are still current. A 2016 study recommended a ~67% transportation increase that the Commission declined to adopt; fire/EMS fees are reported as decades old; and per source 5 the Commission only recently voted to commission a comprehensive study of ALL impact fees — meaning no new schedule has been adopted. The PDF linked on the County site today (172 KB) is the same Jan 2, 2017 schedule archived in Feb 2025, corroborating that it remains in force as of 2026-06-17. CATEGORIES THAT DO NOT EXIST as Brevard County impact fees: NO PARKS / recreation impact fee; NO general law-enforcement/POLICE impact fee (the County instead levies a Correctional Facilities/jail fee, mapped here to the 'police' enum as the nearest public-safety category); NO DRAINAGE/stormwater impact fee; NO OPEN-SPACE impact fee; NO AFFORDABLE-HOUSING impact fee; NO general/capital 'mobility' fee; and NO standalone water or sewer CONNECTION impact fee in the impact-fee schedule. ENUM MAPPING CAVEATS: EMS mapped to 'fire'; Correctional Facilities mapped to 'police'; Solid Waste mapped to 'general' (no exact enums exist for these three). WATER/SEWER CONNECTION FEES — IMPORTANT: I could NOT report a specific flat per-dwelling water or sewer connection/capacity fee, and none was found published as a fixed dollar amount. Reasons, all verified: (1) Brevard County Utility Services provides SANITARY SEWER countywide but provides POTABLE WATER to only two small areas — Mims and San Sebastian Woods (most water service is by city utilities: Melbourne, Palm Bay, Cocoa, Titusville, etc.), so there is no countywide water connection fee (source 3). (2) The County's Utility FAQ (source 4) states that the cost of constructing new water/sewer/reclaimed lines is borne by the benefiting properties — typically built by the subdivision developer (cost rolled into lot price) or financed through MSBU special assessments — rather than a flat published tap fee. (3) Connection charges are calculated per project by Utility Development staff and set by rate resolution; a builder must contact Brevard County Utility Services or the relevant city utility for the project-specific connection charge. Rather than invent a number, water_connection and sewer_connection rows are OMITTED. DATA QUALITY: 14 active fee rows + 1 excludeFromTotal alternate-tier row, all verified verbatim against the official schedule (source 0, full text obtained via the Wayback-archived copy in source 1 because the live brevardfl.gov host blocks curl/WebFetch behind Cloudflare). Mobile-home and RV-pad residential rows in the schedule were omitted per residential single-family/multifamily focus. VERIFY: confirmed 15 of 15 rows (all 14 active + 1 excludeFromTotal); dropped 0. Every dollar amount was re-confirmed verbatim against the Wayback-archived official PDF (source 1, 175 KB, downloaded and parsed via pdftotext -layout): SFD Table 1 row = Transportation $4,353.00 / Fire-Rescue $54.08 / EMS $38.65 / Correctional $71.99 / Library $63.84 / Solid Waste $160.00 / Education $5,096.50 / Total $9,838.06 (printed total matches the sum exactly); Apartment 3+ stories Table 1 row = $2,381.00 / $30.99 / $22.15 / $41.25 / $37.91 / $120.00 / $1,940.50 / Total $4,573.80 (matches sum exactly); Duplex/Townhouse 1-2 stories Transportation = $2,677.00. All amounts matched to the cent. The live brevardfl.gov host returned an HTML/Cloudflare interstitial instead of the PDF (as the researcher noted), so primary verification relied on the Wayback copy; the seven-category list and 2017 schedule were independently corroborated via WebSearch snippets and a SpaceCoast HBCA mirror, and source 5 (Space Coast Rocket) was re-fetched and confirms transportation fees 'neglected for nearly two decades,' the declined 2016 67% increase, and the 4-1 vote to commission a ~$498K comprehensive impact-fee study. The County Utility pages (sources 3/4) 403'd to non-browser fetches but the sewer-countywide / water-only-Mims-&-San-Sebastian-Woods claim and absence of a flat connection fee were corroborated via WebSearch. excludeFromTotal corrections: NONE NEEDED — the single excludeFromTotal=true row (alternate MF transportation tier $2,677, Duplex/Townhouse 1-2 stories) is correctly flagged; it properly avoids double-counting against the representative MF transportation row ($2,381 Apartment 3+ stories). No double-counting detected: the SFD ($9,838.06) and MF-Apartment-3+ ($4,573.80) representative per-dwelling totals each match the schedule's own printed totals and are distinct land uses. All confidence levels ('high') are justified by verbatim primary-source confirmation.

Typical single-family detached home in UNINCORPORATED Brevard County (Table 1), per the schedule's own printed total: Transportation $4,353.00 + Educational/School $5,096.50 + Fire/Rescue $54.08 + EMS $38.65 + Correctional Facilities $71.99 + Library $63.84 + Solid Waste $160.00 = $9,838.06 in county impact fees per dwelling. The school fee ($5,096.50) and transportation fee ($4,353.00) together are ~96% of the total; the public-safety, library and solid-waste fees are very small. These rates have been frozen since Jan 2, 2017 and remain current as of 2026-06-17 (a comprehensive impact-fee study is underway but no new schedule has been adopted). Multifamily (representative: apartment, 3+ stories) total ~$4,573.80/unit (School $1,940.50 + Transportation $2,381.00 + small public-safety/library/solid-waste fees). NOT INCLUDED: water/sewer connection/capacity fees — Brevard County Utility Services provides sewer countywide but water only to Mims & San Sebastian Woods, and connection costs are developer-built or MSBU-financed rather than a flat published per-unit fee; builders must obtain the project-specific connection charge from Brevard County Utility Services or the serving city utility. If the home is inside an incorporated city, use that city's table (Tables 2-5) and confirm any additional city-only impact fees.

Sources

6 official sources · 15 high-confidence figures.

  1. 1Brevard County Residential Impact Fee Schedule (Effective January 2, 2017) — Tables 1-5 by jurisdiction (Transportation, Fire/Rescue, EMS, Correctional Facility, Library, Solid Waste, Education)Brevard County Planning & Development Department · fee schedule · effective Jan 2, 2017 · retrieved Jun 17, 2026
  2. 2Brevard County Residential Impact Fee Schedule (archived copy, Feb 15 2025) — used for full-text extraction because the live brevardfl.gov host blocks non-browser fetches via CloudflareBrevard County Planning & Development Department (via Internet Archive Wayback Machine) · fee schedule · effective Jan 2, 2017 · retrieved Jun 17, 2026
  3. 3Brevard County Impact Fees Home — lists the seven impact-fee categories the County collects and links the current Residential Impact Fees PDF (172 KB)Brevard County Planning & Development Department · municipal webpage · retrieved Jun 17, 2026
  4. 4Brevard County Utility Services — County Rates (sewer service countywide; water only to Mims & San Sebastian Woods; monthly rate schedule)Brevard County Utility Services Department · municipal webpage · retrieved Jun 17, 2026
  5. 5Brevard County Utility Services FAQ — explains utility line extensions are funded by developers (cost in lot price) or MSBU special assessments, not a flat per-unit connection feeBrevard County Utility Services Department · municipal webpage · retrieved Jun 17, 2026
  6. 6Brevard County Commission Votes to Expand Fire Rescue Impact Fee Study to Comprehensive Review of All Impact Fees — confirms fees have not been updated and a comprehensive impact-fee study is only now underwayThe Space Coast Rocket · news article · retrieved Jun 17, 2026

Brevard County impact fees — FAQ

How much are development impact fees in Brevard County, FL for a single-family home?
As of 2026-06-17, total development fees for a single-family detached home in Brevard County are about $9,838 per unit — roughly $9,838 in impact/development fees plus $0 in water/sewer connection fees. Figures are normalized from official sources; verify with the jurisdiction before relying on them.
What are the impact fees per multifamily unit in Brevard County, FL?
Total development fees for a multifamily unit in Brevard County are about $4,574 per unit as of 2026-06-17.
Are impact fees in Brevard County the same as building permit fees?
No. Impact fees (and water/sewer connection fees) fund off-site capital — roads, parks, schools, utilities — and are charged per new dwelling unit. Building permit and plan-review fees are separate and are not included here.
How often do Brevard County's impact fees change?
Most jurisdictions adopt fees by ordinance and escalate them annually (often by a construction cost index), with occasional mid-year updates. Always confirm the current adopted schedule with the jurisdiction. ImpactFeeAtlas last verified Brevard County on 2026-06-17.

More Florida jurisdictions