ImpactFeeAtlasCompare fees
CityUtah CountyVerified Jun 16, 2026

Eagle Mountain, UT Development Impact Fees (2026)

Normalized development impact fees, water & sewer connection (tap/SDC) fees, and mitigation fees for Eagle Mountain, Utah — per dwelling unit, by category, with links to every official source.

$21,003
Total per single-family home
impact + connection fees
$11,055
Impact / development fees
roads, parks, schools…
$9,948
Water & sewer connection
tap / capacity / SDC
Per multifamily unit
total fees / unit

What a single-family home pays in Eagle Mountain

$21,003 total per unit across 6 fee categories.

  • Water connection (tap / SDC)$5,183
  • Transportation / roads$4,853
  • Sewer connection (tap / SDC)$4,765
  • Parks & recreation$3,690
  • Drainage / stormwater$2,470
  • Public safety$42

Eagle Mountain’s $21,003 is about 1.3× the Utah tracked median of $16,521 — among the higher-cost places to build in the state.

Full fee schedule — single-family

Impact / development fees

Fee (local term)BasisAmountSource · effective
Parks & recreation
Parks and Recreation Impact Fee — Appendix A, Section 1 (Parks and Recreation), ORD-15-2020 eff. 8/31/2020. Combines parks, trails, and open space.
per dwelling unit$3,690Eagle Mountain City, Utah
Aug 31, 2020Highdated 2020
Public safety
Public Safety Impact Fee (Police + Fire combined) — Appendix A, Section 2 (Public Safety), ORD-23-2021 eff. 9/13/2021. Eagle Mountain combines police and fire into a single Public Safety impact fee; they are not assessed separately. Non-residential is $145 per 1,000 sq ft.
per dwelling unit$42Eagle Mountain City, Utah
Sep 13, 2021Highdated 2021
Transportation / roads
Transportation Impact Fee (Single Family House) — Appendix A, Section 5.1 (Residential Use), ORD-14-2024 eff. 03/11/2024 and ORD-10-2025 eff. 02/18/2025. Based on cost per trip ($10,325.74) x ITE 11th Ed. trips/unit. ORD-10-2025 suspension applies ONLY to non-residential uses; residential is at full value.
per dwelling unit$4,853Eagle Mountain City, Utah
Feb 18, 2025High
Drainage / stormwater
Storm Water Impact Fee (West Service Area) — Appendix A, Section 4 (Storm Water), ORD-11-2020 eff. 8/25/2020. 1 ERU = 4,300 SF of impervious surface area. West Service Area selected as primary representative.
per meter$2,470Eagle Mountain City, Utah
Aug 25, 2020Highdated 2020
Drainage / stormwater
Storm Water Impact Fee (South Service Area) — South Service Area storm water variant. Mutually exclusive with West; excluded from primary total.
alternative · not added to total
per meter$566Eagle Mountain City, Utah
Aug 25, 2020Highdated 2020
Drainage / stormwater
Storm Water Impact Fee (North Service Area) — North Service Area storm water variant. Mutually exclusive with West; excluded from primary total.
alternative · not added to total
per meter$282Eagle Mountain City, Utah
Aug 25, 2020Highdated 2020

Water & sewer connection fees

Fee (local term)BasisAmountSource · effective
Water connection (tap / SDC)
Water Impact Fee (Development with Water Rights) — Appendix A, Section 6 (Water), ORD-27-2022 eff. 12/05/2022. Per ERU = ~1 single-family dwelling. Primary representative water capacity/impact fee.
per meter$4,283Eagle Mountain City, Utah
Dec 5, 2022Highdated 2022
Water connection (tap / SDC)
Water Impact Fee (Development without Water Rights) — Mutually exclusive alternative to the with-water-rights fee. Developments without water rights ALSO pay Central Utah Water Conservancy District take-down and capital prepayment fees (not fixed-schedule amounts). Excluded from primary total.
alternative · not added to total
per meter$2,445Eagle Mountain City, Utah
Dec 5, 2022Highdated 2022
Sewer connection (tap / SDC)
Wastewater Impact Fee (West Service Area) — Appendix A, Section 3 (Wastewater), ORD-25-2023 eff. 09/18/2023. 1 ERC = 220 GPD. West Service Area selected as primary representative; per-ERC = ~1 single-family dwelling.
per meter$4,665Eagle Mountain City, Utah
Sep 18, 2023High
Sewer connection (tap / SDC)
Wastewater Impact Fee (South Service Area) — South Service Area variant of the city wastewater impact fee. Mutually exclusive with West; excluded from primary total.
alternative · not added to total
per meter$4,665Eagle Mountain City, Utah
Sep 18, 2023High
Sewer connection (tap / SDC)
Wastewater Impact Fee (North Service Area - city collection portion) — North Service Area city wastewater impact fee. Lower because North-area treatment is provided by Timpanogos Special Service District, whose separate $5,931/ERU fee applies in addition for North-area development. Mutually exclusive with West service area; excluded from primary total.
alternative · not added to total
per meter$622Eagle Mountain City, Utah
Sep 18, 2023High
Sewer connection (tap / SDC)
Wastewater Impact Fee - Timpanogos Special Service District (North Service Area, SEPARATE DISTRICT) — SEPARATE DISTRICT FEE: Appendix A, Section 3.1, Timpanogos Special Service District (TSSD), effective 01/01/2025, 1 ERU = 228.70 GPD. Collected by Eagle Mountain and remitted to TSSD; applies IN ADDITION to the city North Service Area wastewater fee ($622) for North-area development only. Excluded from primary West-area total to avoid double counting (West-area development does not pay TSSD).
alternative · not added to total
per meter$5,931Eagle Mountain City, Utah
Jan 1, 2025High
Water connection (tap / SDC)
Culinary Water Meter Connection Fee (3/4" or 5/8" SFR meter) — Section 12.1 (Culinary Water Meter Connection Fees), last revised 05/06/2025. Base residential 3/4"/5/8" meter used as primary. This is a meter connection charge, separate from and additive to the water capacity/impact fee in Appendix A Section 6.
per meter$450Eagle Mountain City, Utah
May 6, 2025High
Sewer connection (tap / SDC)
Sewer Connection Fee (Single-family Residential) — Section 12.2 (Sewer Connection Fees), last revised 05/18/2021. Administrative connection charge, separate from and additive to the wastewater capacity/impact fee in Appendix A Section 3. Commercial/Industrial/Multifamily is estimated cost of connection + 15% admin fee.
per meter$100Eagle Mountain City, Utah
May 18, 2021Highdated 2021
Water connection (tap / SDC)
Pressurized Irrigation Water Meter Connection Fee (3/4" or 5/8" SFR meter) — Section 12.3 (Pressurized Irrigation Water Meter Connection Fees), enacted 05/06/2025. Applies where a PI (secondary irrigation) meter is installed; additive to culinary water connection. Not every lot necessarily has PI service.
per meter$450Eagle Mountain City, Utah
May 6, 2025High

Coverage & caveats

All residential development impact fees and utility connection fees are taken from Eagle Mountain City's official adopted Consolidated Fee Schedule (updated March 3, 2026), Appendix A (Impact Fees) and Section 12 (Public Utility Connections). This is a current, authoritative source; confidence is high throughout. WHAT EXISTS (per dwelling unit / per ERU for single-family detached unless noted): Parks and Recreation ($3,690/household), Public Safety (police+fire combined, $42/DU), Transportation ($4,853 single-family house), Water ($4,283/ERU with water rights), Wastewater (city, varies by service area: North $622, South $4,665, West $4,665 per ERC), Storm Water (varies by service area: North $282, South $566, West $2,470 per ERU). Plus small Culinary Water Meter Connection Fee ($450, 3/4-inch SFR meter) and Sewer Connection Fee ($100 per ERU SFR). A Pressurized Irrigation Water Meter Connection Fee ($450 for 3/4-inch SFR) also applies where PI service is provided (included as additive; note that not every lot has PI). WHAT DOES NOT EXIST HERE: NO school impact fee (school impact fees are not authorized under Utah law; Eagle Mountain has none). NO library impact fee, NO open-space-only impact fee (parks/trails/open space are combined into the single Parks and Recreation impact fee), NO affordable-housing impact fee, NO general/capital catch-all impact fee, and NO standalone mitigation fee. Police and Fire are NOT broken out separately - they are combined into a single 'Public Safety' impact fee ($42/DU residential). SERVICE-AREA / VARIANT HANDLING: Wastewater and Storm Water impact fees, and the water-rights vs no-water-rights water fee, are charged by mutually exclusive category. I selected the WEST SERVICE AREA values as the primary representative rows for wastewater ($4,665) and storm water ($2,470) for internal consistency (West is the primary active growth area), and marked North and South service-area variants excludeFromTotal=true. For water, 'Development with Water Rights' ($4,283/ERU) is primary; 'without water rights' ($2,445/ERU) is excluded (those developments instead pay additional Central Utah Water Conservancy District take-down and capital prepayment fees that are not fixed-schedule amounts). SEPARATE DISTRICT (TIMPANOGOS SPECIAL SERVICE DISTRICT): For the North Service Area only, wastewater treatment is provided by the Timpanogos Special Service District (TSSD). Appendix A Section 3.1 lists a TSSD impact fee of $5,931 per ERU (effective 01/01/2025), collected by the city and remitted to TSSD. This is a separate-district fee that applies in addition to the city's North Service Area wastewater collection fee ($622) for North-area development; it is included as an excluded variant row (since West-area development does not pay it) with attribution in notes. CAVEATS: (1) Transportation impact fee for RESIDENTIAL is at full value ($4,853 single-family house). ORD-10-2025 (eff. 02/18/2025) partially suspends the transportation impact fee only for NON-residential uses (55% for buildings <=10,000 sf except restaurants; 75% for buildings >10,000 sf and restaurants). Residential is unaffected by the suspension. (2) Accessory Dwelling Units (ADUs): per the city's moderate income housing plan, NO additional impact fees are charged for ADUs (an Accessory Dwelling Permit costs $230). (3) The city reserves the right under the Impact Fees Act to assess non-standard (adjusted) fees, and 'buy-in' charges may apply within developer-reimbursement-agreement boundaries in addition to base impact fees. (4) The sewer/water meter connection fees in Section 12 are administrative connection charges separate from the capacity impact fees in Appendix A; both apply.

Primary single-family-detached impact-fee total (West Service Area representative) sums: Parks $3,690 + Public Safety $42 + Transportation $4,853 + Water (with rights) $4,283 + Wastewater (West) $4,665 + Storm Water (West) $2,470 + Culinary Water Connection $450 + Sewer Connection $100 + PI Water Connection $450. Service-area variants (North/South wastewater & storm water), water-without-rights, and the TSSD North-area treatment fee are marked excludeFromTotal=true to avoid double counting.

Sources

2 official sources · 17 high-confidence figures.

  1. 1Eagle Mountain City Consolidated Fee Schedule (Updated March 3, 2026) - Appendix A: Impact Fees; Section 12 Public Utility ConnectionsEagle Mountain City, Utah · fee schedule · effective Mar 3, 2026 · retrieved Jun 16, 2026
  2. 2U.S. Census Bureau QuickFacts: Eagle Mountain city, UtahU.S. Census Bureau · government report · retrieved Jun 16, 2026

Eagle Mountain impact fees — FAQ

How much are development impact fees in Eagle Mountain, UT for a single-family home?
As of 2026-06-16, total development fees for a single-family detached home in Eagle Mountain are about $21,003 per unit — roughly $11,055 in impact/development fees plus $9,948 in water/sewer connection fees. Figures are normalized from official sources; verify with the jurisdiction before relying on them.
Are impact fees in Eagle Mountain the same as building permit fees?
No. Impact fees (and water/sewer connection fees) fund off-site capital — roads, parks, schools, utilities — and are charged per new dwelling unit. Building permit and plan-review fees are separate and are not included here.
How often do Eagle Mountain's impact fees change?
Most jurisdictions adopt fees by ordinance and escalate them annually (often by a construction cost index), with occasional mid-year updates. Always confirm the current adopted schedule with the jurisdiction. ImpactFeeAtlas last verified Eagle Mountain on 2026-06-16.

More Utah jurisdictions