Frisco, TX Development Impact Fees (2026)

Normalized development impact fees, water & sewer connection (tap/SDC) fees, and mitigation fees for Frisco, Texas — per dwelling unit, by category, with links to every official source.

$9,556
Total per single-family home
impact + connection fees
$4,257
Impact / development fees
roads, parks, schools…
$5,299
Water & sewer connection
tap / capacity / SDC
$3,436
Per multifamily unit
total fees / unit

What a single-family home pays in Frisco

$9,556 total per unit across 3 fee categories.

  • Transportation / roads$4,257
  • Water connection (tap / SDC)$2,955
  • Sewer connection (tap / SDC)$2,344

At $9,556, Frisco is below the Texas tracked median of $12,871 — relatively affordable to build in.

Full fee schedule — single-family

Impact / development fees

Fee (local term)BasisAmountSource · effective
Transportation / roads
Roadway Impact Fee — Single-Family Detached (Service Area A) — Exhibit A Roadway Impact Fee Schedule, collection rate at 70% of maximum for single-family. Columns are the four mutually-exclusive service areas A/B/C/D; Area A ($4,257) used as primary representative. Other areas: B=$2,427, C=$2,424, D=$1,935 (see excluded rows).
per dwelling unit$4,257City of Frisco, Texas
May 2, 2019Highdated 2019
Transportation / roads
Roadway Impact Fee — Single-Family Detached (Service Area B) — Mutually-exclusive variant: Roadway Service Area B. Excluded to avoid double-counting with Area A primary.
alternative · not added to total
per dwelling unit$2,427City of Frisco, Texas
May 2, 2019Highdated 2019
Transportation / roads
Roadway Impact Fee — Single-Family Detached (Service Area C) — Mutually-exclusive variant: Roadway Service Area C. Excluded to avoid double-counting with Area A primary.
alternative · not added to total
per dwelling unit$2,424City of Frisco, Texas
May 2, 2019Highdated 2019
Transportation / roads
Roadway Impact Fee — Single-Family Detached (Service Area D) — Mutually-exclusive variant: Roadway Service Area D (lowest). Excluded to avoid double-counting with Area A primary.
alternative · not added to total
per dwelling unit$1,935City of Frisco, Texas
May 2, 2019Highdated 2019

Water & sewer connection fees

Fee (local term)BasisAmountSource · effective
Water connection (tap / SDC)
Water Impact Fee — Single-Family (1" PD meter) — Exhibit B Water Impact Fee Schedule. Smallest published meter is 1" PD (Positive Displacement); used as base residential representative at 70%-of-max single-family rate. The $3,028 column is for all other (non-single-family) land uses at 100% of max.
per dwelling unit$2,120City of Frisco, Texas
May 2, 2019Highdated 2019
Sewer connection (tap / SDC)
Wastewater Impact Fee — Single-Family (1" PD meter) — Exhibit C Wastewater Impact Fee Schedule. Smallest published meter is 1" PD; used as base residential representative at 70%-of-max single-family rate. The $3,348 column is for all other land uses at 100% of max.
per dwelling unit$2,344City of Frisco, Texas
May 2, 2019Highdated 2019
Water connection (tap / SDC)
Residential Water Meter Set Fee (1-inch T-10) — Standard residential meter installation/set fee; includes a $150 refundable deposit. The 2-inch T-10 residential meter is $1,425. This is the physical meter-set/connection charge, separate from and additive to the water impact fee above.
per meter$835City of Frisco, Texas
Jan 1, 2026High

Full fee schedule — multifamily

Impact / development fees

Fee (local term)BasisAmountSource · effective
Transportation / roads
Roadway Impact Fee — Multifamily Low-Rise (Service Area A) — Exhibit A, multifamily assessed at 100% of maximum. Service Area A used as primary; Areas B=$1,959, C=$1,956, D=$1,562. Townhomes (LUC 220, 70% of max) are a separate lower row at $2,405/$1,371/$1,369/$1,093 per unit.
per dwelling unit$3,436City of Frisco, Texas
May 2, 2019Highdated 2019

Water & sewer connection fees

Fee (local term)BasisAmountSource · effective
Water connection (tap / SDC)
Water Impact Fee — Multifamily/All Other (1" PD meter) — Same 1" PD meter, 100%-of-max 'all other land uses' rate. Excluded from single-family total; shown for multifamily/non-SF reference. Larger meters (2" PD $6,783/$9,690; 3" COMP $14,837/$21,196; etc.) priced higher.
alternative · not added to total
per meter$3,028City of Frisco, Texas
May 2, 2019Highdated 2019
Sewer connection (tap / SDC)
Wastewater Impact Fee — Multifamily/All Other (1" PD meter) — Same 1" PD meter, 100%-of-max 'all other land uses' rate. Excluded from single-family total; shown for multifamily/non-SF reference. Larger meters (2" PD $7,500/$10,714; 3" COMP $16,405/$23,436; etc.) priced higher.
alternative · not added to total
per meter$3,348City of Frisco, Texas
May 2, 2019Highdated 2019

Coverage & caveats

Frisco straddles Collin and Denton counties; this record uses the Collin County portion. WHAT EXISTS: Texas Local Government Code Ch. 395 limits impact fees to WATER, WASTEWATER, ROADWAY, and DRAINAGE only. Frisco has adopted WATER, WASTEWATER, and ROADWAY impact fees via Ordinance No. 19-04-29 (adopted April 2, 2019, effective May 2, 2019), which incorporates the "Water, Wastewater and Roadway Impact Fee Update" study dated January 2019 by Kimley-Horn Associates. As of June 2026 this remains the CURRENTLY ADOPTED collection schedule: the hosted municipal code (eCode360 Article V, Impact Fees) still cites the January 2019 study and Ord. 19-04-29, and the FY2026 master fee ordinance (Ord. 2025-09-48, effective Jan 1, 2026) covers monthly utility rates only and did not change impact fees. NOTE: a consultant presented an UPDATED impact fee study in 2025 showing higher MAXIMUM fees (and new state-law water-reuse credits effective Jan 1, 2026), but NO new collection rates had been adopted at the time of research; figures here are the 2019-adopted collection rates. RESIDENTIAL NORMALIZATION: Roadway impact fees are charged per dwelling unit and vary by FOUR mutually-exclusive geographic service areas (A, B, C, D). Service Area A (the highest) is used as the primary row; Areas B/C/D are included as excludeFromTotal rows for reference. Single-Family Detached and Townhomes are assessed at 70% of the maximum per the ordinance; multifamily/all other uses at 100%. Water and wastewater impact fees are priced by meter size/type and the published schedule STARTS at a 1" Positive Displacement (PD) meter (no 5/8" or 3/4" row exists), so the 1" PD residential tier (70% of max) is used as the primary single-family row. Frisco does NOT tier residential impact fees by home square footage, so no sq-ft tiering applies. CONNECTION/TAP: Frisco sets the residential water meter on a per-tap basis; the published residential meter-set fee is $835 for a 1-inch T-10 meter (includes a $150 deposit). Custom tap fees beyond the standard meter set are quoted per-tap by Public Works and are not published as a fixed schedule. WHAT DOES NOT EXIST HERE (per TX Ch. 395 and Frisco practice): NO park impact fee, NO police impact fee, NO fire impact fee, NO SCHOOL impact fee (school impact fees are illegal in Texas — Frisco ISD / Prosper ISD charge none), NO library impact fee, NO open-space impact fee, NO affordable-housing fee, NO general/capital impact fee. Frisco has NOT adopted a DRAINAGE impact fee (allowed by Ch. 395 but not adopted); it levies only a recurring MONTHLY stormwater utility fee ($4.36-$14.01/mo for single-family by lot size), which is an operating utility charge, not a one-time development fee, and is excluded. No "water/wastewater capacity reservation" charge separate from the impact fee was found.

Impact fees assessed at final plat approval and collected at building permit/meter set. Water and wastewater impact fees apply within Frisco's corporate limits AND its extraterritorial jurisdiction; roadway impact fees apply within corporate limits only. Single-family roadway and water/wastewater fees reflect the ordinance's 70%-of-maximum collection rate for single-family land uses.

Sources

5 official sources · 10 high-confidence figures.

  1. 1City of Frisco Ordinance No. 19-04-29 — Water, Wastewater and Roadway Impact Fee Update (Exhibits A, B, C)City of Frisco, Texas · ordinance · effective May 2, 2019 · retrieved Jun 16, 2026
  2. 2Frisco Code of Ordinances, Chapter 18 Article V: Impact FeesCity of Frisco, Texas (eCode360 / General Code) · ordinance · retrieved Jun 16, 2026
  3. 3Fee Schedule — Residential Utility Meter FeesCity of Frisco, Texas · fee schedule · retrieved Jun 16, 2026
  4. 4City of Frisco Ordinance No. 2025-09-48 — FY2026 Fee Ordinance (utility rates)City of Frisco, Texas · ordinance · effective Jan 1, 2026 · retrieved Jun 16, 2026
  5. 5Stormwater Utility FeeCity of Frisco, Texas · municipal webpage · retrieved Jun 16, 2026

Frisco impact fees — FAQ

How much are development impact fees in Frisco, TX for a single-family home?
As of 2026-06-16, total development fees for a single-family detached home in Frisco are about $9,556 per unit — roughly $4,257 in impact/development fees plus $5,299 in water/sewer connection fees. Figures are normalized from official sources; verify with the jurisdiction before relying on them.
What are the impact fees per multifamily unit in Frisco, TX?
Total development fees for a multifamily unit in Frisco are about $3,436 per unit as of 2026-06-16.
Are impact fees in Frisco the same as building permit fees?
No. Impact fees (and water/sewer connection fees) fund off-site capital — roads, parks, schools, utilities — and are charged per new dwelling unit. Building permit and plan-review fees are separate and are not included here.
How often do Frisco's impact fees change?
Most jurisdictions adopt fees by ordinance and escalate them annually (often by a construction cost index), with occasional mid-year updates. Always confirm the current adopted schedule with the jurisdiction. ImpactFeeAtlas last verified Frisco on 2026-06-16.