ImpactFeeAtlasCompare fees
CityAda CountyVerified Jun 16, 2026

Meridian, ID Development Impact Fees (2026)

A new single-family home in Meridian, Idaho pays about $19,244 in total development impact and water/sewer connection fees per unit as of Jun 16, 2026 — about $11,319 in impact/development fees plus $7,925 in water & sewer connection (tap/SDC) fees. Every figure below is normalized per dwelling unit by category, with a link to its official source.

$19,244
Total per single-family home
impact + connection fees
$11,319
Impact / development fees
roads, parks, schools…
$7,925
Water & sewer connection
tap / capacity / SDC
Per multifamily unit
total fees / unit

What a single-family home pays in Meridian

$19,244 total per unit across 6 fee categories.

  • Sewer connection (tap / SDC)$5,807
  • Transportation / roads$5,803
  • Parks & recreation$4,119
  • Water connection (tap / SDC)$2,118
  • Fire / EMS$995
  • Police$402

Meridian’s $19,244 is close to the Idaho tracked median of $19,153.

Full fee schedule — single-family detached

Impact / development fees

Fee (local term)BasisAmountSource · effective
Parks & recreation
Parks & Recreation Impact Fee — Representative 1,701-2,500 sq ft climate-controlled tier (covers a typical ~2,000-2,500 sq ft single-family home). Confirmed in impact fee PDF and live City Fee app (code 22-2004).
per dwelling unit$4,119City of Meridian
Feb 1, 2023High
Police
Police Facilities Impact Fee — 1,701-2,500 sq ft tier. Confirmed in impact fee PDF.
per dwelling unit$402City of Meridian
Feb 1, 2023High
Fire / EMS
Fire Facilities Impact Fee — 1,701-2,500 sq ft tier. Confirmed in impact fee PDF.
per dwelling unit$995City of Meridian
Feb 1, 2023High
Transportation / roads
ACHD Transportation Impact Fee — Levied by the SEPARATE Ada County Highway District (ACHD), collected at the Meridian building permit. Current 3/1/2026 city handout figure (supersedes older FY23 $3,493 schedule also shown in same PDF).
per dwelling unit$5,803City of Meridian / Ada County Highway District
Mar 1, 2026High
Parks & recreation
Parks Impact Fee - 1,200 sf or less tier — Smallest size tier (<=1,200 sq ft). Alternate tier - excluded from single-family total.
alternative · not added to total
per dwelling unit$1,946City of Meridian
Feb 1, 2023High
Parks & recreation
Parks Impact Fee - 1,201 to 1,700 sf tier — Alternate size tier - excluded from total.
alternative · not added to total
per dwelling unit$3,006City of Meridian
Feb 1, 2023High
Parks & recreation
Parks Impact Fee - 2,501 to 3,200 sf tier — Alternate size tier - excluded from total.
alternative · not added to total
per dwelling unit$4,935City of Meridian
Feb 1, 2023High
Parks & recreation
Parks Impact Fee - 3,201 sf or more tier — Largest size tier - excluded from total.
alternative · not added to total
per dwelling unit$5,544City of Meridian
Feb 1, 2023High
Police
Police Impact Fee - 1,200 sf or less tier — Smallest size tier - excluded from total.
alternative · not added to total
per dwelling unit$190City of Meridian
Feb 1, 2023High
Police
Police Impact Fee - 3,201 sf or more tier — Largest size tier - excluded from total.
alternative · not added to total
per dwelling unit$542City of Meridian
Feb 1, 2023High
Fire / EMS
Fire Impact Fee - 1,200 sf or less tier — Smallest size tier - excluded from total.
alternative · not added to total
per dwelling unit$470City of Meridian
Feb 1, 2023High
Fire / EMS
Fire Impact Fee - 3,201 sf or more tier — Largest size tier - excluded from total.
alternative · not added to total
per dwelling unit$1,339City of Meridian
Feb 1, 2023High

Water & sewer connection fees

Fee (local term)BasisAmountSource · effective
Water connection (tap / SDC)
Water Assessment (Connection) Fee — Confirmed by City of Meridian Resolution No. 26-2566 (eff. 6/1/2026, supersedes prior fees). Live City Fee app frames this as per Equivalent Residential Unit (ERU); one ERU per single-family dwelling.
per meter$1,696City of Meridian
Jun 1, 2026High
Sewer connection (tap / SDC)
Wastewater/Sewer Assessment (Connection) Fee — Confirmed by City of Meridian Resolution No. 26-2566 (eff. 6/1/2026, supersedes prior fees). Live City Fee app frames this as per Equivalent Residential Unit (ERU); one ERU per single-family dwelling.
per meter$5,807City of Meridian
Jun 1, 2026High
Water connection (tap / SDC)
Water Meter (3/4 inch domestic + single MXU) — Standard residential 3/4" meter set; additive to the water assessment. Confirmed in FY25 PW handout ($422.37 with MXU); Single Port MXU component $235.95 also listed, implying $186.42 base meter.
per meter$422City of Meridian Public Works
Mar 5, 2025High

Single-family attached (townhome) impact fees in Meridian

Impact / development fees

Fee (local term)BasisAmountSource · effective
Transportation / roads
ACHD Transportation Impact Fee - Duplex/Townhouse (per unit) — Separate Ada County Highway District fee. Excluded from SF detached primary total.
alternative · not added to total
per dwelling unit$3,182City of Meridian / Ada County Highway District
Mar 1, 2026High

Multifamily (per unit) impact fees in Meridian

Impact / development fees

Fee (local term)BasisAmountSource · effective
Parks & recreation
Parks Impact Fee - Multifamily (per unit, small-unit tier) — MF uses same tier table by AVERAGE unit size; typical <=1,200 sf units fall in lowest tier. Excluded to avoid double-counting with SF primary.
alternative · not added to total
per dwelling unit$1,946City of Meridian
Feb 1, 2023Medium
Police
Police Impact Fee - Multifamily (per unit, small-unit tier) — MF, average unit <=1,200 sf tier. Excluded from SF total.
alternative · not added to total
per dwelling unit$190City of Meridian
Feb 1, 2023Medium
Fire / EMS
Fire Impact Fee - Multifamily (per unit, small-unit tier) — MF, average unit <=1,200 sf tier. Excluded from SF total.
alternative · not added to total
per dwelling unit$470City of Meridian
Feb 1, 2023Medium

Accessory dwelling unit (ADU) impact fees in Meridian

Impact / development fees

Fee (local term)BasisAmountSource · effective
Transportation / roads
ACHD Transportation Impact Fee - ADU — Separate Ada County Highway District fee for ADUs. Excluded from SF detached primary total.
alternative · not added to total
per dwelling unit$1,934City of Meridian / Ada County Highway District
Mar 1, 2026High

Coverage & caveats

RESIDENTIAL development fees for Meridian, ID (Ada County).

Found

(1) City development impact fees for Parks & Recreation, Police, and Fire — adopted via the 2019 Meridian Development Impact Fees study and indexed/adjusted effective 2/1/2023; fees are TIERED by square feet of climate-controlled (living) space, NOT a flat per-unit fee. Representative ~2,000-2,500 sq ft single-family home falls in the "1,701 to 2,500 sq ft" tier: Parks $4,119 + Police $402 + Fire $995 = $5,516 city impact total. Multifamily uses the SAME tier table based on average unit size (total building climate-controlled sq ft / number of units), so a typical small MF unit (e.g., 1,200 sq ft or less) = Parks $1,946 + Police $190 + Fire $470 = $2,606/unit. All other size tiers included as excludeFromTotal rows. (2) Water & sewer CONNECTION (Assessment) fees: Water $1,696, Wastewater/Sewer $5,807 — confirmed by City of Meridian Resolution No. 26-2566 (adopted March 2026, effective 6/1/2026, superseding all prior fees).

Note

the researcher referenced these as "per ERU / MMC 26-2566"; the primary instrument is actually Resolution No. 26-2566 and labels them "Water Assessment Fee" / "Wastewater Assessment Fee" (the per-ERU framing comes from the live City Fee app, which agrees on amounts). (3) Water meter purchase fee for a standard 3/4" residential meter with single-port MXU radio = $422.37 (effective 3/5/2025) — this is in ADDITION to the water assessment. (4) ACHD (Ada County Highway District) TRANSPORTATION impact fee is levied by the separate highway district and collected at the Meridian building permit: Single Family Detached $5,803, Duplex/Townhouse $3,182/unit, ADU $1,934 (current city Building Division ACHD handout, effective 3/1/2026); multifamily/commercial requires individual ACHD assessment so not quantified. DOES NOT EXIST in Meridian: NO school impact fee (Idaho Development Impact Fee Act, Idaho Code Title 67 Ch. 82, does not authorize cities to charge school impact fees on homebuilders — school districts fund growth via bonds); NO general/capital, library, open space, affordable housing, or stormwater/drainage RESIDENTIAL impact fee (only commercial drainage PLAN-REVIEW fees exist, not a residential impact fee).

Caveats

meridiancity.org PDFs were fetched directly via curl with a browser UA (succeeded); apps.meridiancity.org/CITYFEEWEB live app returns 403 to automated fetch, but the ERU amounts were independently confirmed via the City Council resolution PDF surfaced from official meeting records. The current city impact fee schedule reflects the 2/1/2023 inflation adjustment to the 2019 study; no newer adopted schedule supersedes it as of 2026-06-16. ACHD multifamily transportation fee omitted because it is set by individual assessment, not a published per-unit figure.

Note

the ACHD PDF also contains an older FY23 (eff. 10/1/2022) schedule with lower per-unit figures ($3,493 SFD etc.); the current 3/1/2026 handout figures ($5,803/$3,182/$1,934) were used as cited.

Verify

confirmed 20 of 20 rows; dropped 0. excludeFromTotal corrections: none needed — all alternate size tiers, multifamily per-unit rows, and ACHD duplex/townhouse + ADU rows were already correctly flagged excludeFromTotal=true, and the representative SF-detached total (Parks+Police+Fire city impact $5,516, + ACHD $5,803, + Water $1,696, + Sewer $5,807, + meter $422.37) contains no double-counting. Corrections applied: added effectiveDate 2026-06-01 and a primary-source citation (Resolution No. 26-2566) to the water and sewer assessment rows, with sourceQuote updated to the resolution wording.

Primary single-family rows use the 1,701-2,500 sq ft tier as the representative ~2,000-2,500 sq ft home. Other size tiers are included with excludeFromTotal=true. ACHD transportation fee attributed to the separate Ada County Highway District (collected at city permit). Water meter 3/4" total ($422.37) = base meter $186.42 + single-port MXU radio $235.95; the FY25 PW handout lists the combined "New Fee w/ MXU cost incl. $422.37" and the Single Port MXU $235.95 (so $422.37-$235.95=$186.42 base, internally consistent). It is additive to the water assessment. Water/Sewer assessment fees confirmed via City of Meridian Resolution No. 26-2566 effective 6/1/2026.

Sources

6 official sources · 17 high-confidence figures.

  1. 1Police, Fire, Parks Impact Fees effective 2.1.2023City of Meridian · fee schedule · effective Feb 1, 2023 · retrieved Jun 16, 2026
  2. 2City of Meridian - City Fees Schedule (live application)City of Meridian · fee schedule · retrieved Jun 16, 2026
  3. 3Water Meter Fee Increase effective March 5, 2025 (FY2025)City of Meridian Public Works · fee schedule · effective Mar 5, 2025 · retrieved Jun 16, 2026
  4. 4ACHD Fee Increase Effective March 1, 2026 (City of Meridian Building Division handout)City of Meridian / Ada County Highway District · fee schedule · effective Mar 1, 2026 · retrieved Jun 16, 2026
  5. 52019 Meridian Development Impact Fees Report (Raftelis) - methodology basis for adopted scheduleCity of Meridian / Raftelis · fee study · effective Jan 1, 2019 · retrieved Jun 16, 2026
  6. 6Resolution No. 26-2566 Adopting Increasing Fees of the Meridian Public Works Department (Water $1,696 / Wastewater $5,807 Assessment Fees, effective 6/1/2026)City of Meridian · resolution · effective Jun 1, 2026 · retrieved Jun 16, 2026

Meridian impact fees — FAQ

How much are development impact fees in Meridian, ID for a single-family home?
As of 2026-06-16, total development fees for a single-family detached home in Meridian are about $19,244 per unit — roughly $11,319 in impact/development fees plus $7,925 in water/sewer connection fees. Figures are normalized from official sources; verify with the jurisdiction before relying on them.
Are impact fees in Meridian the same as building permit fees?
No. Impact fees (and water/sewer connection fees) fund off-site capital — roads, parks, schools, utilities — and are charged per new dwelling unit. Building permit and plan-review fees are separate and are not included here.
How often do Meridian's impact fees change?
Most jurisdictions adopt fees by ordinance and escalate them annually (often by a construction cost index), with occasional mid-year updates. Always confirm the current adopted schedule with the jurisdiction. ImpactFeeAtlas last verified Meridian on 2026-06-16.

Compare impact fees in nearby Idaho jurisdictions

Cities with a similar fee burden

Jurisdictions in other states with total single-family fees close to Meridian’s $19,244 per home.