Caldwell, ID Development Impact Fees (2026)

A new single-family home in Caldwell, Idaho pays about $14,197 in total development impact and water/sewer connection fees per unit as of Jun 16, 2026 — about $7,562 in impact/development fees plus $6,635 in water & sewer connection (tap/SDC) fees. Every figure below is normalized per dwelling unit by category, with a link to its official source.

$14,197
Total per single-family home
impact + connection fees
$7,562
Impact / development fees
roads, parks, schools…
$6,635
Water & sewer connection
tap / capacity / SDC
$2,293
Per multifamily unit
total fees / unit

What a single-family home pays in Caldwell

$14,197 total per unit across 6 fee categories.

  • Water connection (tap / SDC)$4,251
  • Transportation / roads$4,226
  • Sewer connection (tap / SDC)$2,384
  • Parks & recreation$2,082
  • Fire / EMS$1,070
  • Police$184

At $14,197, Caldwell is below the Idaho tracked median of $19,153 — relatively affordable to build in.

Full fee schedule — single-family detached

Impact / development fees

Fee (local term)BasisAmountSource · effective
Parks & recreation
Parks Impact Fee — Resolution 193-23, effective Oct 1, 2023; VERIFIED via OCR of scanned PDF page 1 ('2023 Proposed Impact Fees ... Parks ... Residential $2,081.73 /Unit', increased from 2022 Res 384-22 level of $2,006.94). Flat per-unit (not size-tiered). Confidence medium because a newer index-adjusted resolution may exist but was not located. A 2025 draft Police & Fire study does NOT cover Parks.
per dwelling unit$2,082City of Caldwell, Idaho
Oct 1, 2023Medium
Fire / EMS
Fire Impact Fee — Resolution 193-23, eff. Oct 1, 2023; VERIFIED via OCR (Residential $1,070.37/Unit; Non-Residential $0.53/ft2). Confidence medium re currency (newer index-adjusted resolution may exist, not located).
per dwelling unit$1,070City of Caldwell, Idaho
Oct 1, 2023Medium
Police
Police Impact Fee — Resolution 193-23, eff. Oct 1, 2023; VERIFIED via OCR (Residential $184.01/Unit; Non-Residential $0.09/ft2). Total residential impact fee confirmed at $3,336.11/Unit (2,081.73+1,070.37+184.01). Confidence medium re currency.
per dwelling unit$184City of Caldwell, Idaho
Oct 1, 2023Medium
Transportation / roads
Traffic/Transportation Impact Fee (Caldwell & Highway District No. 4) — Resolution 429-24 (Caldwell Area CIP & TIF Program), Table 7 on PDF page 33; VERIFIED via high-res OCR of the rendered table. Joint program of City of Caldwell and HIGHWAY DISTRICT NO. 4; City-collected fees spent only on CIP projects within City of Caldwell. ITE Land Use Code 210, per dwelling unit. New program adopted Jan 21, 2025.
per dwelling unit$4,226City of Caldwell, Idaho & Highway District No. 4 (prepared by Kittelson & Associates)
Jan 21, 2025High

Water & sewer connection fees

Fee (local term)BasisAmountSource · effective
Water connection (tap / SDC)
Water Well Development Fee — Resolution 318-24, eff. Oct 1, 2024; VERIFIED via OCR of scanned PDF (quote confirmed verbatim). Additive water connection component (domestic-only). Irrigation connections carry additional fees not included here.
per dwelling unit$899City of Caldwell, Idaho
Oct 1, 2024High
Water connection (tap / SDC)
Water Trunk Line Fee — Resolution 318-24; VERIFIED via OCR (quote confirmed verbatim). Additive water connection component.
per dwelling unit$735City of Caldwell, Idaho
Oct 1, 2024High
Water connection (tap / SDC)
Water Connection (3/4" x 3/4" Meter & Service) — Resolution 318-24; VERIFIED via OCR. Base residential 3/4" meter & service selected as primary; larger meter sizes (1" $3,864.89; 1.5" $5,578.21; 2" $7,170.21) confirmed in source as mutually-exclusive alternatives and excluded.
per meter$2,617City of Caldwell, Idaho
Oct 1, 2024High
Water connection (tap / SDC)
Water Main Extension Fee (frontage-based, minimum) — Resolution 318-24; VERIFIED via OCR (quote confirmed verbatim). $39.75/front foot; 60 ft minimum = $2,385 minimum. Frontage/situation-dependent and often waived when developer installs mains or via a Local Improvement District; excludeFromTotal=true confirmed correct. unitBasis 'per_acre' used as closest schema proxy for the actual per-front-foot basis.
alternative · not added to total
per acre$2,385City of Caldwell, Idaho
Oct 1, 2024High
Sewer connection (tap / SDC)
Sewer Interceptor Fee — Resolution 316-24, eff. Oct 1, 2024; VERIFIED via OCR (quote confirmed verbatim). Additive sewer connection component (oversized mains/interceptor/trunk lines).
per dwelling unit$1,171City of Caldwell, Idaho
Oct 1, 2024High
Sewer connection (tap / SDC)
Sewer Plant Capacity Fee — Resolution 316-24; VERIFIED via OCR. Source confirms Interceptor + Plant Capacity = $2,384.23 stated residential minimum ('two thousand three hundred eighty-four dollars and twenty-three cents ($2,384.23) per connection (the sum of the Residential Plant Capacity and Interceptor Fees)').
per dwelling unit$1,213City of Caldwell, Idaho
Oct 1, 2024High
Sewer connection (tap / SDC)
Sewer Main Extension Fee (frontage-based, minimum) — Resolution 316-24; VERIFIED via OCR (quote confirmed verbatim). $42.38/front foot; 60 ft minimum = $2,542.80. Frontage/situation-dependent, often waived when developer installs mains (source: 'If the owner or developer is directed to construct the main line by the City, the mainline extension fee shall be waived'); excludeFromTotal=true confirmed correct. unitBasis 'per_acre' is a schema proxy for the per-front-foot basis.
alternative · not added to total
per acre$2,543City of Caldwell, Idaho
Oct 1, 2024High
Sewer connection (tap / SDC)
Sewer Stub-out Fee (conditional) — Resolution 316-24; VERIFIED via OCR (quote confirmed verbatim). Applies ONLY when the City elects to construct the service stub; waived where the user constructs its own stub or via a Local Improvement District. excludeFromTotal=true confirmed correct (conditional).
alternative · not added to total
per dwelling unit$977City of Caldwell, Idaho
Oct 1, 2024High

Multifamily (per unit) impact fees in Caldwell

About $2,293 per unit.

Impact / development fees

Fee (local term)BasisAmountSource · effective
Transportation / roads
Traffic/Transportation Impact Fee - Multifamily Low-Rise — Resolution 429-24, Table 7 (PDF p.33); VERIFIED via OCR. ITE 220. Primary multifamily transportation row.
per dwelling unit$2,293City of Caldwell, Idaho & Highway District No. 4 (prepared by Kittelson & Associates)
Jan 21, 2025High
Transportation / roads
Traffic/Transportation Impact Fee - Multifamily Mid-Rise — Resolution 429-24, Table 7 (PDF p.33); VERIFIED via OCR (PSM4 pass). ITE 221. Alternative multifamily tier; excludeFromTotal=true confirmed correct to avoid double-counting with the low-rise multifamily row (same landUse).
alternative · not added to total
per dwelling unit$1,753City of Caldwell, Idaho & Highway District No. 4 (prepared by Kittelson & Associates)
Jan 21, 2025High

Accessory dwelling unit (ADU) impact fees in Caldwell

About $1,394 per unit — state or local ADU exemptions may reduce this..

Impact / development fees

Fee (local term)BasisAmountSource · effective
Transportation / roads
Traffic/Transportation Impact Fee - Accessory Dwelling Unit — Resolution 429-24, Table 7 (PDF p.33); VERIFIED via OCR. ADU trip generation per individual assessment (Note 1). Distinct land use (adu).
per dwelling unit$1,394City of Caldwell, Idaho & Highway District No. 4 (prepared by Kittelson & Associates)
Jan 21, 2025High

Mobile / manufactured home impact fees in Caldwell

Impact / development fees

Fee (local term)BasisAmountSource · effective
Transportation / roads
Traffic/Transportation Impact Fee - Mobile Home — Resolution 429-24, Table 7 (PDF p.33); VERIFIED via OCR (PSM4 pass). ITE 240. Alternative residential type; excludeFromTotal=true retained (excluded from the single-family total).
alternative · not added to total
per dwelling unit$2,607City of Caldwell, Idaho & Highway District No. 4 (prepared by Kittelson & Associates)
Jan 21, 2025High

Coverage & caveats

Caldwell, ID residential development fees verified from official adopted City of Caldwell resolutions (all PDFs were scanned images requiring OCR; key residential figures were additionally confirmed by direct visual inspection of the rendered fee tables).

What exists

1) IMPACT FEES (Idaho Code 67-82 "Development Impact Fee Act"): Caldwell levies Parks, Fire, and Police impact fees. Currently adopted amounts are from Resolution 193-23, effective Oct 1, 2023: Parks $2,081.73/unit, Fire $1,070.37/unit, Police $184.01/unit (residential total $3,336.11/unit). These are flat per-dwelling-unit fees (not size-tiered). A May 15, 2007 vesting cutoff applies: lots occupied prior to that date are exempt; all new construction pays full impact fees. NOTE on the pending update: a 2025 Police & Fire impact-fee study (planning case CPM25-000001/ZOA25-000002) proposes RECALCULATED maximum-supportable fees but it is NOT yet adopted; the Res 193-23 figures remain in effect. I report the adopted (Res 193-23) figures as the current fees. 2) TRANSPORTATION/TRAFFIC IMPACT FEE: NEW. Caldwell adopted the Caldwell Area CIP & Traffic Impact Fee Program (Resolution 429-24, passed Jan 21, 2025) jointly with HIGHWAY DISTRICT NO. 4 (HD4). This is the separate-district transportation impact fee that a Caldwell residential builder must pay; it is administered jointly by the City of Caldwell and HD4 for the CATS service area, and fees collected by the City are spent only on CIP projects within the City of Caldwell. Table 7 fee schedule (confirmed by OCR/visual inspection of the rendered table on PDF page 33): Single-Family $4,226/unit, Multifamily Low-Rise $2,293/unit, Multifamily Mid-Rise $1,753/unit, Mobile Home $2,607/unit, ADU $1,394/unit. (Note: HD4's SEPARATE "Mid-Star" service area TIF applies to unincorporated Canyon County, NOT to the City of Caldwell, and is excluded.) 3) WATER CONNECTION FEES (Resolution 318-24, eff. Oct 1, 2024): For a single-family residence connecting to City water, the ADDITIVE components are Well Development Fee $898.64/unit + Trunk Line Fee $735.35/unit + Water Connection charge (3/4"x3/4" meter & service) $2,617.03/ea. A frontage-based Water Main Extension Fee of $39.75/ft (min $2,385 at 60 ft) may also apply when a new main is needed; included as a separate row but excluded from a simple per-unit total because it is frontage/situation-dependent and often waived when developer installs mains. Larger meter sizes (1" $3,864.89; 1.5" $5,578.21; 2" $7,170.21) are mutually-exclusive alternatives (excluded). Connection fees were increased ~50%/yr in FY2024-2026 per the Water Facilities Plan (confirmed in the resolution cover memo). 4) SEWER CONNECTION FEES (Resolution 316-24, eff. Oct 1, 2024): For a single-family residence, the ADDITIVE components are Interceptor Fee $1,170.93/unit + Plant Capacity Fee $1,213.30/connection (these two sum to the stated $2,384.23 residential minimum, confirmed verbatim in the resolution). A frontage-based Sewer Main Extension Fee of $42.38/ft (min $2,542.80 at 60 ft) may apply (separate row, excluded from per-unit total, frontage-dependent/often waived). A Stub-out Fee of $977.18 applies ONLY if the City elects to construct the service stub (conditional; excluded).

What does not exist here

- NO SCHOOL IMPACT FEE: Idaho state law (Idaho Code 67-82) does not authorize school impact fees; none is levied. - No drainage/stormwater impact fee, no library impact fee, no open-space/affordable-housing/general-capital impact fee identified - Caldwell's impact fees are limited to Parks, Fire, Police, and (new) Transportation. - Building/electrical/plumbing/mechanical PERMIT fees (Res 320-24) exist but are regulatory permit fees, not development impact/connection fees, so they are omitted per scope.

Key caveats

(a) All four city fee resolutions were scanned-image PDFs (no text layer); the independent verifier re-downloaded each PDF (Akamai bot-protection required full browser headers) and re-OCR'd them with tesseract at 300-400 dpi, confirming every dollar figure and quote. (b) The traffic impact fee is brand-new (Jan 2025 adoption); the underlying plan document still listed traffic fees as "currently HD4 and Nampa only" on an earlier page, reflecting timing before Caldwell's adoption - Table 7 itself lists Caldwell's adopted figures and KIVI-TV reporting confirms the council approved the program ("Growth has to pay for itself"; "different impact fees will be associated with single-family homes, multi-family housing, or shopping centers"). The KIVI article does not cite specific dollar amounts or HD4 by name. (c) Impact fees (Parks/Fire/Police) may be index-adjusted annually; the most recent ADOPTED schedule located is Res 193-23 (FY2024, eff. 10/1/2023); a newer index-adjusted resolution may exist but was not located, so confidence on currency is medium for those three rows.

Verify

confirmed 17 of 17 rows; dropped 0. All amounts and sourceQuotes confirmed via OCR of the cited scanned-image PDFs: Res 193-23 (Parks $2,081.73 / Fire $1,070.37 / Police $184.01 / total $3,336.11, eff 10/1/2023); Res 429-24 Table 7 (SF $4,226, MF low-rise $2,293, MF mid-rise $1,753, ADU $1,394, mobile home $2,607); Res 318-24 (Well Dev $898.64, Trunk $735.35, 3/4" connection $2,617.03, main ext $39.75/ft min $2,385); Res 316-24 (Interceptor $1,170.93, Plant Capacity $1,213.30, sum $2,384.23, main ext $42.38/ft min $2,542.80, stub-out $977.18). excludeFromTotal corrections: NONE - all flags verified correct (MF mid-rise, mobile home, water main ext, sewer main ext, and conditional stub-out correctly excluded; representative SFD per-unit total = $14,197.36 with no double-counting). CORRECTION TO NARRATIVE ONLY (no fee row affected): the researcher's coverageNotes claimed the 2025 draft study proposes SUBSTANTIALLY LOWER fees (draft Parks $951 / Fire $649 / Police $97 = $1,697). On re-inspection of source 5 (the Police & Fire CIP & Impact Fee Amendment study, CPM25-000001/ZOA25-000002), those specific numbers do NOT appear; the document's Figure 6 ("Summary of Maximum Supportable Development Impact Fees by Land Use") shows Single Family Police $641 + Fire $1,264 = $1,905 maximum supportable vs current $1,254 - i.e., an INCREASE of $651, and the study covers only Police and Fire (not Parks). The researcher's draft-figure characterization (direction and amounts) was inaccurate and has been removed; this does not change any adopted fee row, since all fee[] entries are sourced to the adopted Res 193-23, not the draft.

Representative single-family-detached one-time fee stack for a new home connecting to City water and sewer (excludes frontage-based main-extension fees and conditional stub-out, which vary by lot/are often waived): Parks $2,081.73 + Fire $1,070.37 + Police $184.01 + Transportation (Caldwell/HD4) $4,226 + Water (Well Dev $898.64 + Trunk Line $735.35 + Connection $2,617.03) + Sewer (Interceptor $1,170.93 + Plant Capacity $1,213.30) = $14,197.36 per single-family home (independently recomputed and verified). Add frontage-based water main extension (~$2,385 min) and sewer main extension (~$2,542.80 min) where a new main must be installed and is not waived.

Sources

7 official sources · 13 high-confidence figures.

  1. 1Resolution 193-23 - Parks, Fire, and Police Impact Fees (posted as impact-fees-2025.pdf)City of Caldwell, Idaho · resolution · effective Oct 1, 2023 · retrieved Jun 16, 2026
  2. 2Resolution 429-24 - Caldwell Area Capital Improvements Plan & Traffic Impact Fee Program (City of Caldwell & Highway District No. 4), Table 7 Impact Fee ScheduleCity of Caldwell, Idaho & Highway District No. 4 (prepared by Kittelson & Associates) · resolution · effective Jan 21, 2025 · retrieved Jun 16, 2026
  3. 3Resolution 318-24 - City of Caldwell Water System Fees and PoliciesCity of Caldwell, Idaho · resolution · effective Oct 1, 2024 · retrieved Jun 16, 2026
  4. 4Resolution 316-24 - City of Caldwell Sewer System Fees and PoliciesCity of Caldwell, Idaho · resolution · effective Oct 1, 2024 · retrieved Jun 16, 2026
  5. 5New or Replaced Dwelling Impact Fee Exemption Form (May 15, 2007 vesting cutoff)City of Caldwell, Idaho - Department of Building Safety · municipal webpage · retrieved Jun 16, 2026
  6. 6CPM25-000001 / ZOA25-000002 - Police and Fire CIP & Impact Fee Amendment (DRAFT study, not yet adopted; covers Police & Fire only)City of Caldwell, Idaho - Planning & Zoning · fee study · effective Aug 1, 2025 · retrieved Jun 16, 2026
  7. 7Caldwell City Council approves impact fees to fund future road improvementsKIVI-TV Idaho News 6 · news article · retrieved Jun 16, 2026

Caldwell impact fees — FAQ

How much are development impact fees in Caldwell, ID for a single-family home?
As of 2026-06-16, total development fees for a single-family detached home in Caldwell are about $14,197 per unit — roughly $7,562 in impact/development fees plus $6,635 in water/sewer connection fees. Figures are normalized from official sources; verify with the jurisdiction before relying on them.
What are the impact fees per multifamily unit in Caldwell, ID?
Total development fees for a multifamily unit in Caldwell are about $2,293 per unit as of 2026-06-16.
Are impact fees in Caldwell the same as building permit fees?
No. Impact fees (and water/sewer connection fees) fund off-site capital — roads, parks, schools, utilities — and are charged per new dwelling unit. Building permit and plan-review fees are separate and are not included here.
How often do Caldwell's impact fees change?
Most jurisdictions adopt fees by ordinance and escalate them annually (often by a construction cost index), with occasional mid-year updates. Always confirm the current adopted schedule with the jurisdiction. ImpactFeeAtlas last verified Caldwell on 2026-06-16.