ImpactFeeAtlasCompare fees

Phoenix, AZ vs St. George, UT: Development Impact Fees Compared (2026)

A single-family home pays about $36,107 in Phoenix vs $33,173 in St. George Phoenix is $2,934 (9%) higher. Every figure below is normalized per dwelling unit by category, with links to each jurisdiction’s official sources.

City

Phoenix, AZ

$36,107
Total per single-family home
impact + connection fees
$5,585
Impact / development fees
roads, parks, schools…
$30,522
Water & sewer connection
tap / capacity / SDC
$3,775
Per multifamily unit
total fees / unit

Impact / development fees

Fee (local term)BasisAmountSource · effective
Fire / EMS
Fire Protection Impact Fee — Northwest (Off-Project) service area used as the representative primary. Fire SFD fee varies by service area: $1,165 (Northeast/Paradise Ridge), $1,625 (Estrella/Laveen), $1,833 (Ahwatukee), and $0 in the established Balance of City. Phoenix System Development Fees under ARS 9-463.05 apply only in designated growth/service areas. VERIFIED: $1,282 matches Northwest (Off-Project) column of 2025 PDF.
per dwelling unit$1,282City of Phoenix Planning & Development Department
Jun 23, 2025High
Police
Police Impact Fee — Northwest (Off-Project). Police SFD fee is uniform at $348 across all active growth service areas; $0 in Balance of City (established core). VERIFIED: $348 matches; uniform $348 across all non-zero service areas confirmed in PDF.
per dwelling unit$348City of Phoenix Planning & Development Department
Jun 23, 2025High
Parks & recreation
Parks & Recreation Impact Fee — Northwest (Off-Project). Parks SFD fee varies: $1,474 (Northeast/Paradise Ridge), $2,082 (Estrella/Laveen), $1,094 (Ahwatukee), $0 in Balance of City. Each service area's parks fee funds only parks in that area. VERIFIED: $1,409 matches Northwest column; variation confirmed.
per dwelling unit$1,409City of Phoenix Planning & Development Department
Jun 23, 2025High
Library
Libraries Impact Fee — Northwest (Off-Project). Library SFD fee varies: $133 (Northeast/Paradise Ridge), $205 (Estrella/Laveen); $0 in Ahwatukee and Balance of City. VERIFIED: $216 matches Northwest column; variation confirmed.
per dwelling unit$216City of Phoenix Planning & Development Department
Jun 23, 2025High
Transportation / roads
Major Arterials (Roads) Impact Fee — Northwest (Off-Project). The Major Arterials (street/road) impact fee of $2,330/SFD applies ONLY in the four northern service areas (Northwest, Deer Valley, Northeast, Paradise Ridge). It is $0 in the Estrella, Laveen, Ahwatukee, and Balance of City areas. VERIFIED: $2,330 matches; $0 in all southern/central and Balance columns confirmed in PDF.
per dwelling unit$2,330City of Phoenix Planning & Development Department
Jun 23, 2025High
Drainage / stormwater
Storm Drainage Impact Fee — EXCLUDED from the Northwest primary total because Storm Drainage is $0 in the Northwest service area. Shown here as a representative SFD value from a service area where it applies. Storm Drainage SFD fee = $0 (Northwest/Deer Valley/Northeast), $3,094 (Paradise Ridge), $1,207 (Estrella), $1,401 (Laveen); $0 in Ahwatukee/Balance of City. For multifamily and non-residential it is charged per acre ($4,828-$12,376). VERIFIED: $1,207 matches Estrella columns; $0 in Northwest confirmed, so excludeFromTotal=true is correct (mutually-exclusive service-area swap).
alternative · not added to total
per dwelling unit$1,207City of Phoenix Planning & Development Department
Jun 23, 2025High

Water & sewer connection fees

Fee (local term)BasisAmountSource · effective
Sewer connection (tap / SDC)
Wastewater Collection System Development Fee — Northwest (Off-Project), base residential 'Single Family Unit - up to 1.0" meter' tier (covers the standard 3/4" residential meter). This is an additive SDF, separate from Wastewater Treatment. Varies by area: $5,127 (Northwest/Northeast/Paradise Ridge), $5,409 (Estrella South On-Project), $0 (Deer Valley, Estrella North, Laveen, Ahwatukee, Balance of City). 1.5" meter tier = $11,177. VERIFIED: $5,127 matches Northwest 'up to 1.0"' tier; 1.5" tier = $11,177 confirmed; using the up-to-1.0" tier (not the mutually-exclusive 1.5" tier) is the correct base residential row.
per dwelling unit$5,127City of Phoenix Planning & Development Department
Jun 23, 2025High
Sewer connection (tap / SDC)
Wastewater Treatment System Development Fee — Northwest (Off-Project), base residential 'up to 1.0" meter' tier. Additive SDF on top of Wastewater Collection. Varies by area: $3,753 (Northwest/Northeast/Paradise Ridge) vs $1,071 in most other areas (Deer Valley, Estrella, Laveen, Ahwatukee, Balance of City). 1.5" tier = $8,182. VERIFIED: $3,753 matches Northwest 'up to 1.0"' tier; $1,071 in other areas and $8,182 1.5" tier confirmed.
per dwelling unit$3,753City of Phoenix Planning & Development Department
Jun 23, 2025High
Water connection (tap / SDC)
Water Transmission System Development Fee — Northwest (Off-Project), base residential 'up to 1.0" meter' tier. Additive SDF. The four northern areas (Northwest, Deer Valley, Northeast, Paradise Ridge) carry the high $14,046 transmission fee; the southern/central areas (Estrella, Laveen, Ahwatukee) are $1,703; Balance of City is $0. 1.5" tier = $30,620. VERIFIED: $14,046 matches Northwest 'up to 1.0"' tier; $1,703 southern, $0 Balance, $30,620 1.5" tier all confirmed.
per dwelling unit$14,046City of Phoenix Planning & Development Department
Jun 23, 2025High
Water connection (tap / SDC)
Water Treatment System Development Fee — Northwest (Off-Project), base residential 'up to 1.0" meter' tier. Additive SDF. Uniform at $4,387/SFD across ALL service areas including Balance of City. 1.5" tier = $9,564. VERIFIED: $4,387 matches; uniform $4,387 across all 15 columns confirmed in PDF; 1.5" tier = $9,564 confirmed.
per dwelling unit$4,387City of Phoenix Planning & Development Department
Jun 23, 2025High
Water connection (tap / SDC)
Water Resources Acquisition Fee — Northwest (Off-Project), base residential 'up to 1.0" meter' tier. Separate ARS-authorized Water Resources Acquisition Fee (Phoenix City Code Ch. 30), additive on top of Water Transmission/Treatment. $2,009/SFD applies in all listed 'Off-Project' service areas; $0 in 'On-Project' columns (where the developer provides resources directly). 1.5" tier = $4,380. VERIFIED: $2,009 matches Northwest (Off-Project) 'up to 1.0"' tier; $0 in On-Project columns and $4,380 1.5" tier confirmed.
per dwelling unit$2,009City of Phoenix Planning & Development Department
Jun 23, 2025High
Sewer connection (tap / SDC)
Sewer Development Occupational Fee (DOF) — Sewer Development Occupational Fee, inside-city single-family = $600 (outside city $900; mobile home space $420; apartment/multifamily unit $360). Separate citywide capacity fee under Ord. G-2664/G-2665/G-2666/G-2667 (adopted Nov 1, 1984); applies in addition to the geographic impact fees and applies even in the established core (Balance of City) where impact fees are $0. Commercial/industrial DOF is by meter size. VERIFIED: quote 'Single-Family residential project: Water DOF $600 + Sewer DOF $600 = Total DOF $1200' appears verbatim on source 2; inside-city SF $600.00, outside $900.00, mobile home $420, apartment/dwelling unit $360 all confirmed; Sewer DOF = Water DOF confirmed.
per dwelling unit$600City of Phoenix Water Services Department
Nov 1, 1984Highdated 1984
Water connection (tap / SDC)
Water Development Occupational Fee (DOF) — Water Development Occupational Fee, inside-city single-family = $600 (outside city $900). Separate citywide water-capacity fee, additive to impact fees and applies even in the established core where impact fees are $0. Multifamily/dwelling unit = $360, mobile home space = $420. VERIFIED: quote appears verbatim on source 2; inside-city SF Water DOF $600.00 confirmed. Note: source states DOF is based on meter size/type for commercial; the $600 figure is the published single-family residential value, not a specific 5/8"/3/4" disk breakdown (researcher's prior parenthetical about meter sizes is not separately itemized on the page, but the SF residential $600 value is explicit).
per dwelling unit$600City of Phoenix Water Services Department
Nov 1, 1984Highdated 1984
Phoeniximpact fees →
City

St. George, UT

$33,173
Total per single-family home
impact + connection fees
$12,172
Impact / development fees
roads, parks, schools…
$21,001
Water & sewer connection
tap / capacity / SDC
Per multifamily unit
total fees / unit

Impact / development fees

Fee (local term)BasisAmountSource · effective
Parks & recreation
Parks & Recreation Impact Fee — Per dwelling unit, single-family. Confirmed verbatim on 4/21/21 schedule.
per dwelling unit$4,525City of St. George, Utah
Apr 21, 2021Highdated 2021
Transportation / roads
Transportation Impact Fee — Per dwelling unit, single-family. Confirmed verbatim.
per dwelling unit$2,188City of St. George, Utah
Apr 21, 2021Highdated 2021
Police
Police Impact Fee (Residential) — Residential single-family per unit. Confirmed verbatim.
per dwelling unit$95City of St. George, Utah
Apr 21, 2021Highdated 2021
Fire / EMS
Fire/EMS Impact Fee (Residential) — Residential single-family per unit (Fire/EMS column). Confirmed verbatim.
per dwelling unit$320City of St. George, Utah
Apr 21, 2021Highdated 2021
Drainage / stormwater
Storm Drain (Drainage) Impact Fee (Residential) — Residential single-family per unit (Drainage column). Confirmed verbatim.
per dwelling unit$781City of St. George, Utah
Apr 21, 2021Highdated 2021
General government / capital
Electrical (Power) Impact Fee - Residential single-phase 100 AMP — St. George is a municipal power provider; residential single-phase 100 AMP service (typical SF) used as representative. Additive. Confirmed verbatim.
per meter$3,893City of St. George, Utah
Apr 21, 2021Highdated 2021
General government / capital
Electrical (Power) Impact Fee - Residential single-phase 200 AMP — 200 AMP residential single-phase tier, mutually exclusive with 100 AMP. Excluded.
alternative · not added to total
per meter$4,809City of St. George, Utah
Apr 21, 2021Highdated 2021
General government / capital
Power Meter Fee - Underground — Power meter fee, underground service. Additive. Confirmed verbatim.
per meter$370City of St. George, Utah
Apr 21, 2021Highdated 2021

Water & sewer connection fees

Fee (local term)BasisAmountSource · effective
Water connection (tap / SDC)
Culinary Water Impact Fee (City) - base 0.8" meter — City culinary water impact fee, smallest/base residential 0.8" meter. Separate from and additive to WCWCD regional water impact fee.
per meter$1,996City of St. George, Utah
Apr 21, 2021Highdated 2021
Water connection (tap / SDC)
Culinary Water Impact Fee (City) - 1.0" meter — Larger meter tier, mutually exclusive with 0.8" base. Excluded.
alternative · not added to total
per meter$4,311City of St. George, Utah
Apr 21, 2021Highdated 2021
Water connection (tap / SDC)
Culinary Water Connection Fee (City) - 0.8" meter, water on lot — Additive water connection fee (on-lot), base 0.8" meter. If water not on lot it is $1,207.
per meter$223City of St. George, Utah
Apr 21, 2021Highdated 2021
Water connection (tap / SDC)
Culinary Water Connection Fee (City) - 0.8" meter, water NOT on lot — Alternative to on-lot connection fee. Excluded (mutually exclusive with on-lot $223).
alternative · not added to total
per meter$1,207City of St. George, Utah
Apr 21, 2021Highdated 2021
Sewer connection (tap / SDC)
Local & Regional Wastewater Impact Fee (City) - base 0.8" meter — Total wastewater impact fee for base 0.8" meter = $137 local + $1,379 regional. Confirmed verbatim.
per meter$1,516City of St. George, Utah
Apr 21, 2021Highdated 2021
Sewer connection (tap / SDC)
Local & Regional Wastewater Impact Fee (City) - 1.0" meter — Larger meter tier, mutually exclusive with 0.8" base. Excluded.
alternative · not added to total
per meter$3,274City of St. George, Utah
Apr 21, 2021Highdated 2021
Water connection (tap / SDC)
WCWCD Regional Water Impact Fee (separate district) — SEPARATE DISTRICT FEE: Washington County Water Conservancy District regional water impact fee, $17,266 per ERC for a 3/4"/5/8" residential meter. Confirmed verbatim on the WCWCD page. Paid by builders in St. George IN ADDITION to the city culinary water impact fee. Reduced fee available under Ultra Water Efficiency Standards (amount not published). Confidence medium and effectiveDate cleared because the district page publishes no specific effective date or resolution number.
per meter$17,266Washington County Water Conservancy District
Medium
St. Georgeimpact fees →

What drives the difference

Phoenix’s $36,107 per single-family home is $2,934 (9%) above St. George’s $33,173. The largest single difference is in sewer connection (tap / sdc): Phoenix charges about $9,480 there versus $1,516 in St. George — a $7,964 swing that accounts for much of the overall gap. The two also differ in how much falls on water and sewer connection charges: $30,522 in Phoenix versus $21,001 in St. George.

Keep comparing

Phoenix vs St. George impact fees — FAQ

Which has higher impact fees, Phoenix or St. George?
Phoenix, AZ is higher. A single-family home pays about $36,107 per unit in Phoenix versus $33,173 in St. George, UT — $2,934 (9%) more, as of 2026.
How much more does it cost to build a home in Phoenix than in St. George?
About $2,934 more per single-family home — $36,107 in Phoenix, AZ versus $33,173 in St. George, UT, a difference of 9% in total development impact and connection fees.
What's the difference between impact fees in Phoenix and St. George for a single-family home?
Phoenix, AZ charges about $36,107 per single-family home ($5,585 impact + $30,522 water/sewer connection), while St. George, UT charges about $33,173 ($12,172 impact + $21,001 connection). Figures are normalized from official sources for 2026.