ImpactFeeAtlasCompare fees

Hutto, TX vs Leander, TX: Development Impact Fees Compared (2026)

A single-family home pays about $23,752 in Hutto vs $16,912 in Leander Hutto is $6,840 (40%) higher. Every figure below is normalized per dwelling unit by category, with links to each jurisdiction’s official sources.

City

Hutto, TX

$23,752
Total per single-family home
impact + connection fees
$7,894
Impact / development fees
roads, parks, schools…
$15,858
Water & sewer connection
tap / capacity / SDC
Per multifamily unit
total fees / unit

Impact / development fees

Fee (local term)BasisAmountSource · effective
Transportation / roads
Transportation/Traffic Impact Fee - Single-Family Detached (ITE 210) — VERIFIED COMPUTED: City Impact Fee Worksheet (TIF tab, after-2/3/25) row 17 confirms Single-Family Detached Housing, ITE code 210, Dwelling Unit, Veh-miles per Unit = 4.31, Impact fee per Serv. Unit = 1298. 4.31 x $1,298 = $5,594.38/SFD unit. Worksheet note: 'Values from Table 3: Vehicle Miles per Development Unit (Roadway Impact Fee Study)'. The $1,298/veh-mi residential rate is stated verbatim in 2026 A5.004: 'Traffic (for plans approved after February 3, 2025) | Residential Land Use (per vehicle mile) $1,298.00' (up from $784.31 pre-2/3/2025).
per dwelling unit$5,594City of Hutto, TX
Feb 3, 2025High
Drainage / stormwater
Stormwater Management Fee - Single Family (one-time, per gross acre) — VERIFIED: Confirmed verbatim in 2026 Fee Schedule: 'Stormwater Management Fee | Single Family (gross acre) $800.00' (Last Updated 9/18/2025, matching effectiveDate). One-time stormwater/drainage development fee per GROSS ACRE (Single Family $800; Multi-family $1,600; Commercial/Industrial $2,400). Acre basis cannot be normalized to per-DU without a density assumption, so correctly excludeFromTotal. Separate $4.00 RECURRING MONTHLY drainage utility fee (A5.005) is not a one-time development fee.
alternative · not added to total
per acre$800City of Hutto, TX
Sep 18, 2025High
Parks & recreation
Parkland Dedication Fee-in-Lieu - Residential (per dwelling unit) — VERIFIED: Confirmed verbatim in 2026 Fee Schedule: 'Parkland Fee-in-Lieu | Residential (per dwelling unit) $2,300.00'. Subdivision-ordinance parkland dedication fee-in-lieu, NOT a Ch.395 impact fee (park impact fees are illegal in TX). Charged per residential dwelling unit when land is not dedicated; legally distinct but additive. Correctly NOT excluded from per-DU total. Non-residential = $975 for first 3 acres + $975/acre above 3 acres.
per dwelling unit$2,300City of Hutto, TX
Apr 14, 2026High

Water & sewer connection fees

Fee (local term)BasisAmountSource · effective
Water connection (tap / SDC)
Water Impact Fee - Single-Family Detached (per service unit / LUE) — VERIFIED: Confirmed verbatim in 2026 Fee Schedule A5.004 (Last Updated 4/14/2026): 'For plats approved after February 3, 2025 | Water (per service unit) $6,808.00'. SFD = 1.0 LUE = 1 service unit per City LUE Table line 29 ('Residence, Single Family or Townhouse | 1.0 | 1 Unit'), so per-service-unit = per-DU. WIF worksheet tab confirms Impact fee per Serv. Unit = 6808 (5/8" Positive Displacement meter). Corroborated by 2025 schedule ($6,808) and news coverage.
per dwelling unit$6,808City of Hutto, TX
Feb 3, 2025High
Sewer connection (tap / SDC)
Wastewater Impact Fee - Single-Family Detached residential (per service unit / LUE) — VERIFIED: Confirmed verbatim in 2026 Fee Schedule A5.004: 'Wastewater (residential) (per service unit) $7,600.00'. SFD = 1.0 LUE = 1 service unit (LUE Table line 29). WWIF worksheet tab confirms 7600 (Res). A separate NON-residential wastewater rate of $12,670/service unit is captured as an excluded reference row. Corroborated by 2025 schedule ($7,600) and news coverage.
per dwelling unit$7,600City of Hutto, TX
Feb 3, 2025High
Water connection (tap / SDC)
Water Connection (tap) Fee - 5/8" or 3/4" meter (standard residential) — VERIFIED: Confirmed verbatim in 2026 Fee Schedule A5.002: 'Water | 5/8" and 3/4" meter $600.00'. Physical water meter/connection (tap) fee, additive to the water impact fee. 5/8"/3/4" is the standard residential service. Larger-meter rates (1"=$750, 1.5"=$1,100, 2"=$1,300, >2"=meter cost+$300) are mutually-exclusive variants, correctly not listed separately.
per meter$600City of Hutto, TX
Apr 14, 2026High
Sewer connection (tap / SDC)
Wastewater Connection Fee - up to 8" connection (city-installed) — VERIFIED: Confirmed verbatim in 2026 Fee Schedule A5.002: 'Wastewater | Up to 8" connection $850.00'. Physical wastewater connection fee, additive to the wastewater impact fee. $850 city-installed (standard residential case); $300 developer-installed (up to 8") is a mutually-exclusive variant. Additive to impact fee.
per meter$850City of Hutto, TX
Apr 14, 2026High
Huttoimpact fees →
City

Leander, TX

$16,912
Total per single-family home
impact + connection fees
$4,159
Impact / development fees
roads, parks, schools…
$12,753
Water & sewer connection
tap / capacity / SDC
Per multifamily unit
total fees / unit

Impact / development fees

Fee (local term)BasisAmountSource · effective
Transportation / roads
Roadway Impact Fee (collected, residential 50% of max; Service Area D representative) — REPRESENTATIVE value (Service Area D). VERIFIED: the study's sample calculation (Example 1) confirms SF detached = 4.04 veh-mi/DU x Service Area D $1,229 = $4,965.16 maximum assessable. Max fee per service unit by area VERIFIED from Table 8: A $2,179, B $842, C $929, D $1,229, E $287. The 50% residential collection rate (10% nonresidential) is NOT in the fee-study PDF; it is corroborated by a web search and the citizenportal council-workshop coverage (source 4 was HTTP 403 on direct fetch, confirmed via search-engine snippet). Shown amount = 50% of SA D max ($4,965.16 x 0.50 = $2,482.58). Collected by area at 50%: A $4,401.58, B $1,700.84, C $1,876.58, D $2,482.58, E $579.74. Confidence MEDIUM: collection rate from a secondary source and the city was actively considering raising it (to phase out the separate Roadway Adequacy Payment) as of mid-2025. Verify exact service area + current collection rate at building permit.
per dwelling unit$2,483City of Leander, TX (prepared by Kimley-Horn)
Dec 1, 2023Medium
Transportation / roads
Roadway Impact Fee MAXIMUM assessable (Service Area D) — VERIFIED exactly against the study sample calculation (Example 1, Service Area D): 'Impact Fee = 1 * 4.04 * $1,229 ... Maximum Assessable Impact Fee = $4,965.16.' This is the MAXIMUM assessable (not what is collected); actual residential collection is 50% of this (see collected row). excludeFromTotal=true is correct to avoid double-counting with the collected roadway row.
alternative · not added to total
per dwelling unit$4,965City of Leander, TX (prepared by Kimley-Horn)
Dec 1, 2023High
Parks & recreation
Fee-in-Lieu of Parkland (Williamson County) — VERIFIED exactly against the downloaded Concept Plan Submittal Packet PDF (text extracted via pdftotext): 'Parkland is calculated as 7.5 acres per each 100 dwelling units. A payment of fee in lieu of parkland is an option at a rate of $1,676.60 for Williamson County or $2,355.13 for Travis County.' NOT a Chapter 395 impact fee - this is a parkland dedication / fee-in-lieu requirement under the city's subdivision/parks authority for residential developments (developer may dedicate 7.5 ac/100 DU OR pay this per-unit fee). Leander is primarily in Williamson County, so $1,676.60/DU is the applicable primary rate. Park improvements (up to 50%) may also be required separately.
per dwelling unit$1,677City of Leander, TX
Oct 9, 2025High
Parks & recreation
Fee-in-Lieu of Parkland (Travis County portion) — VERIFIED exactly against the Concept Plan Submittal Packet PDF. Mutually exclusive county variant; applies only to the Travis County ETJ portion of Leander's jurisdiction. Williamson County rate ($1,676.60) used as primary since Leander is primarily in Williamson County. excludeFromTotal=true is correct.
alternative · not added to total
per dwelling unit$2,355City of Leander, TX
Oct 9, 2025High

Water & sewer connection fees

Fee (local term)BasisAmountSource · effective
Water connection (tap / SDC)
Water Impact (Capital Recovery) Fee — VERIFIED directly against Municode Sec. 13.07.009 (browser-rendered): '(2) Water: $8,762.00.' Adopted by Ord. No. 23-044-00, sec. 4 (eff. 8/17/2023). Per LUE (living unit equivalent); one single-family detached residence of average size = 1.0 LUE, so $8,762 per home. The code expressly states the impact fee 'shall be charged in addition to all other fees... including... building permit fees and tap fees,' so this is additive to the water tap fee.
per dwelling unit$8,762City of Leander, TX (Municode Library)
Aug 17, 2023High
Sewer connection (tap / SDC)
Wastewater Impact (Capital Recovery) Fee — VERIFIED directly against Municode Sec. 13.07.009 (browser-rendered): '(1) Wastewater: $2,301.00.' Per LUE; SF detached = 1.0 LUE = $2,301 per home. Combined code water+wastewater = $11,063 per LUE (note: a July 2023 Community Impact news article reported the combined figure as $11,064.73/LUE; the code itself lists exactly $8,762 + $2,301, so $11,063 is used). Adopted Ord. No. 23-044-00 (eff. 8/17/2023).
per dwelling unit$2,301City of Leander, TX (Municode Library)
Aug 17, 2023High
Water connection (tap / SDC)
Water Tap Fee (full install, 3/4-inch meter) — VERIFIED directly against Municode Appendix A, Sec. A7.007 (browser-rendered): water tap where the city installs service lines and sets the meter (typical new construction) is 5/8 inch $840.00, 3/4 inch $940.00. Additive to the water impact fee. Excludes backflow device cost; street cut adds $1,000 for a two-lane roadway + $500 per additional lane. (Where lines already exist and the city only inspects + sets a meter, the lower 3/4-inch fee is $415 - a different scenario, not used here.)
per meter$940City of Leander, TX (Municode Library)
High
Water connection (tap / SDC)
Water Tap Fee (full install, 5/8-inch meter) — VERIFIED against Municode Sec. A7.007: 5/8 inch $840.00. Mutually exclusive meter-size variant of the water tap fee; the 3/4-inch ($940) row is used as the primary residential meter. excludeFromTotal=true is correct to avoid double-counting.
alternative · not added to total
per meter$840City of Leander, TX (Municode Library)
High
Sewer connection (tap / SDC)
Wastewater Tap Fee (full install by city) — VERIFIED directly against Municode Appendix A, Sec. A7.007 wastewater tap schedule (browser-rendered): 'Where service lines must be installed set by the city, the tap fee shall be $750.00.' Flat fee. Street cut adds $850 for a two-lane roadway + $425 per additional lane. Additive to the wastewater impact fee. (Where lines already exist and the city only inspects, the fee is $100 - a different scenario.) Note: researcher's original quote prefixed 'Wastewater tap schedule ...'; corrected to the verbatim code sentence.
per meter$750City of Leander, TX (Municode Library)
High
Leanderimpact fees →

What drives the difference

Hutto’s $23,752 per single-family home is $6,840 (40%) above Leander’s $16,912. The largest single difference is in sewer connection (tap / sdc): Hutto charges about $8,450 there versus $3,051 in Leander — a $5,399 swing that accounts for much of the overall gap. The two also differ in how much falls on water and sewer connection charges: $15,858 in Hutto versus $12,753 in Leander.

Keep comparing

Hutto vs Leander impact fees — FAQ

Which has higher impact fees, Hutto or Leander?
Hutto, TX is higher. A single-family home pays about $23,752 per unit in Hutto versus $16,912 in Leander, TX — $6,840 (40%) more, as of 2026.
How much more does it cost to build a home in Hutto than in Leander?
About $6,840 more per single-family home — $23,752 in Hutto, TX versus $16,912 in Leander, TX, a difference of 40% in total development impact and connection fees.
What's the difference between impact fees in Hutto and Leander for a single-family home?
Hutto, TX charges about $23,752 per single-family home ($7,894 impact + $15,858 water/sewer connection), while Leander, TX charges about $16,912 ($4,159 impact + $12,753 connection). Figures are normalized from official sources for 2026.