Elk Grove, CA vs Temecula, CA: Development Impact Fees Compared (2026)
A single-family home pays about $70,887 in Elk Grove vs $66,254 in Temecula — Elk Grove is $4,633 (7%) higher. Every figure below is normalized per dwelling unit by category, with links to each jurisdiction’s official sources.
City
Elk Grove, CA
$70,887
Total per single-family home
impact + connection fees
$54,629
Impact / development fees
roads, parks, schools…
$16,258
Water & sewer connection
tap / capacity / SDC
$9,793
Per multifamily unit
total fees / unit
Impact / development fees
| Fee (local term) | Basis | Amount | Source · effective |
|---|---|---|---|
General government / capital Capital Facilities Fee (civic center, police, corp yard, animal shelter, library, transit) — Citywide; applies to all development. Components per booklet: City Admin Facilities $537, Police Facilities $1,405, Corporation Yard $615, Corp Yard-Animal Shelter $405, Library $1,646, Transit $852, plus 4% admin $218. Police, library, transit etc. are sub-components of this single CFF - reported as one row to avoid double counting. Adjusted each Jan 1 for inflation. VERIFIED against archived 1/1/2026 booklet. | per dwelling unit | $5,678 | City of Elk Grove Finance Department Jan 1, 2026High |
Police CFF component - Police Facilities (informational, included in Capital Facilities row) — Informational breakout only - already counted inside the $5,678 Capital Facilities Fee. Excluded from total to avoid double counting. VERIFIED. alternative · not added to total | per dwelling unit | $1,405 | City of Elk Grove Finance Department Jan 1, 2026High |
Library CFF component - Library Facilities (informational, included in Capital Facilities row) — Informational breakout only - already counted inside the $5,678 Capital Facilities Fee. Excluded to avoid double counting. VERIFIED. alternative · not added to total | per dwelling unit | $1,646 | City of Elk Grove Finance Department Jan 1, 2026High |
Affordable housing Affordable Housing Fee — Citywide; funds low/very-low income housing. Total includes 3% admin ($185). Adjusted each Jan 1. VERIFIED. | per dwelling unit | $6,354 | City of Elk Grove Finance Department Jan 1, 2026High |
Transportation / roads Roadway Fee (2,001-2,700 sq ft tier) — Citywide. Representative tier for a ~2,000-2,500 sq ft home. Tiered by home size; total includes 5.5% admin. Adjusted each Jan 1 (Cal-Trans Road Construction Cost Index). VERIFIED. | per dwelling unit | $16,638 | City of Elk Grove Finance Department Jan 1, 2026High |
Transportation / roads Roadway Fee (1,701-2,000 sq ft tier) — Alternate size tier (1,701-2,000 sq ft). Excluded - use the 2,001-2,700 tier as primary. VERIFIED. alternative · not added to total | per dwelling unit | $15,125 | City of Elk Grove Finance Department Jan 1, 2026High |
Transportation / roads Roadway Fee (1,401-1,700 sq ft tier) — Alternate size tier. Excluded. VERIFIED. alternative · not added to total | per dwelling unit | $13,008 | City of Elk Grove Finance Department Jan 1, 2026High |
Transportation / roads Roadway Fee (2,701-3,400 sq ft tier) — Alternate (larger) size tier. Excluded. VERIFIED. alternative · not added to total | per dwelling unit | $17,697 | City of Elk Grove Finance Department Jan 1, 2026High |
Transportation / roads Active Transportation Fee (2,001-2,700 sq ft tier) — Citywide; funds bike/pedestrian/trail facilities. Representative tier. Includes 5.5% admin. Adjusted each Jan 1. VERIFIED. | per dwelling unit | $2,681 | City of Elk Grove Finance Department Jan 1, 2026High |
Transportation / roads Active Transportation Fee (1,701-2,000 sq ft tier) — Alternate size tier. Excluded. VERIFIED. alternative · not added to total | per dwelling unit | $2,438 | City of Elk Grove Finance Department Jan 1, 2026High |
Fire / EMS Fire Fee (Zone 1 - Elk Grove) — Fee levied for Cosumnes CSD (fire), collected by City. Zone 1 used as primary. Includes 3% admin. Zones 2-5 are lower because Mello-Roos CFDs fund part of fire facilities there. Adjusted each Jan 1. VERIFIED. | per dwelling unit | $2,652 | City of Elk Grove Finance Department Jan 1, 2026High |
Fire / EMS Fire Fee (Zone 2 - Laguna) — Mutually-exclusive zone variant. Excluded. VERIFIED. alternative · not added to total | per dwelling unit | $2,588 | City of Elk Grove Finance Department Jan 1, 2026High |
Fire / EMS Fire Fee (Zone 3 - Laguna West) — Mutually-exclusive zone variant. Excluded. VERIFIED. alternative · not added to total | per dwelling unit | $2,466 | City of Elk Grove Finance Department Jan 1, 2026High |
Fire / EMS Fire Fee (Zone 4 - Lakeside) — Mutually-exclusive zone variant. Excluded. VERIFIED. alternative · not added to total | per dwelling unit | $2,560 | City of Elk Grove Finance Department Jan 1, 2026High |
Fire / EMS Fire Fee (Zone 5 - Stonelake) — Mutually-exclusive zone variant. Excluded. VERIFIED. alternative · not added to total | per dwelling unit | $2,433 | City of Elk Grove Finance Department Jan 1, 2026High |
Transportation / roads Measure A Transportation Mitigation Fee (Large >2,400 sq ft) — Citywide regional fee collected for Sacramento Transportation Authority (STA). Tiered by size; 'Large' used as primary representative. Includes 2% admin. Adjusted each Jul 1. VERIFIED. | per dwelling unit | $1,793 | City of Elk Grove Finance Department Jul 1, 2025High |
Transportation / roads Measure A Transportation Mitigation Fee (Medium 1,601-2,400 sq ft) — Alternate Measure A size tier. Excluded - use Large tier as primary. VERIFIED. alternative · not added to total | per dwelling unit | $1,631 | City of Elk Grove Finance Department Jul 1, 2025High |
Transportation / roads I-5 Subregional Corridor Mitigation Fee — Citywide (City of Elk Grove District 4). Funds I-5 transportation facilities. DUE rate 1.00 for SFR; includes 3% admin. Adjusted each Jul 1. VERIFIED. | per dwelling unit | $4,193 | City of Elk Grove Finance Department Jul 1, 2025High |
Schools School Facilities / Developer Fee (EGUSD) - residential, per sq ft — Levied by Elk Grove Unified School District (separate district), mandatory before building permit per Ed. Code 17620. $7.32/sq ft through 6/30/2026; drops to $7.23/sq ft effective 7/1/2026. Confirmed live on EGUSD page. Exceeds statewide Level 1 max - EGUSD justifies via Needs Analysis. ADUs <=750 sq ft and additions <=500 sq ft exempt. This per-sqft row is excluded from total; the per-DU dollar figure is the next row. VERIFIED. alternative · not added to total | per sq ft | $7.32 | Elk Grove Unified School District Jul 1, 2025High |
Schools School Facilities / Developer Fee (EGUSD) - SFR @ 2,000 sq ft — Computed: $7.32/sq ft x 2,000 sq ft = $14,640. Attributed to Elk Grove Unified School District (separate district). Scale to actual home square footage. Real, mandatory builder cost collected before permit issuance. Per-sqft rate VERIFIED; per-DU dollar is a computed estimate (medium confidence). | per dwelling unit | $14,640 | Elk Grove Unified School District Jul 1, 2025Medium |
Parks & recreation SEPA Park & Trail Fee (plan-area specific) — Applies ONLY within the Southeast Policy Area (SEPA) specific plan. Park $13,659 + Trail $12,330 = $25,989/unit. Mutually exclusive with other plan-area park fees. Excluded from citywide total but a real, large cost for builders in SEPA. Passed through to Cosumnes CSD. VERIFIED. alternative · not added to total | per dwelling unit | $25,989 | City of Elk Grove Finance Department Jan 1, 2026High |
Parks & recreation LRSP Supplemental Park Fee (plan-area specific - Laguna Ridge) — Applies ONLY within Laguna Ridge Specific Plan. Facilities ($14,080+$563) + Land ($6,320+$253) components = $21,216. In ADDITION to the Laguna Ridge Park Fee ($5,136/unit) for lots in that plan area. Excluded from citywide total (geographic). Plus Quimby in-lieu land obligations may apply. VERIFIED. alternative · not added to total | per dwelling unit | $21,216 | City of Elk Grove Finance Department Jan 1, 2026High |
Parks & recreation Laguna Ridge Park Fee (plan-area specific) — Applies ONLY within Laguna Ridge area. Excluded (geographic/mutually-exclusive). VERIFIED. alternative · not added to total | per dwelling unit | $5,136 | City of Elk Grove Finance Department Jan 1, 2026High |
Parks & recreation East Franklin Park Facilities Fee (plan-area specific) — Applies ONLY within East Franklin Specific Plan. Passed through to Cosumnes CSD. Excluded (geographic). VERIFIED. alternative · not added to total | per dwelling unit | $10,731 | City of Elk Grove Finance Department Jan 1, 2026High |
Parks & recreation Eastern Elk Grove Park Fee (plan-area specific) — Applies ONLY within Eastern Elk Grove Specific Plan. Excluded (geographic). VERIFIED. alternative · not added to total | per dwelling unit | $8,582 | City of Elk Grove Finance Department Jan 1, 2026High |
Parks & recreation Stonelake Park Fee (plan-area specific) — Applies ONLY within Stonelake area. Passed through to Cosumnes CSD. Excluded (geographic). VERIFIED. alternative · not added to total | per dwelling unit | $4,213 | City of Elk Grove Finance Department Jan 1, 2026High |
Drainage / stormwater SEPA/LRSP Phase 3 Drainage Fee (plan-area specific, per acre) — Applies ONLY within SEPA (North Sub-Shed shown as example; varies by basin S4-S8/LRSP Phase 3). Per net acre, not per unit. Excluded from per-unit total (geographic + per-acre basis). There is NO citywide drainage impact fee in Elk Grove. VERIFIED. alternative · not added to total | per acre | $35,194 | City of Elk Grove Finance Department Jan 1, 2026High |
Open space Swainson's Hawk Mitigation Fee (per acre of suitable habitat) — CORRECTED FROM RESEARCHER PLACEHOLDER ($0/low). Booklet publishes the actual amount: $17,396/acre acquisition+admin + $444/acre ongoing monitoring = $17,840/acre total, due prior to grading permit. Land-conversion habitat mitigation per acre of impacted suitable Swainson's Hawk habitat (determined during CEQA), NOT a per-dwelling-unit fee; projects >=40 acres must dedicate land in perpetuity instead. Excluded from per-DU total (per-acre, conditional). VERIFIED against archived 1/1/2026 booklet. alternative · not added to total | per acre | $17,840 | City of Elk Grove Finance Department Jan 1, 2026High |
Water & sewer connection fees
| Fee (local term) | Basis | Amount | Source · effective |
|---|---|---|---|
Water connection (tap / SDC) Water Connection Fee + Meter Charge (EGWD Service Area 1, 1" meter) — Levied by Elk Grove Water District (separate utility). 1" is the smallest meter published (no 3/4" tier shown). Total = $4,479 connection fee + $926 meter charge. Per Ord. 8.15.18.01 / 2018 Water Connection Fee Study (latest published). VERIFIED via archived EGWD page (2025-12-10 snapshot). | per meter | $5,405 | Elk Grove Water District Aug 15, 2018Mediumdated 2018 |
Water connection (tap / SDC) Water Connection (EGWD Service Area 2, 1" meter) — Mutually-exclusive service area. In Service Area 2 the capacity charge is blank/$0 (infrastructure funded by other means, e.g., CFD), only the $926 meter charge applies. Excluded - Service Area 1 used as primary representative of full development cost. VERIFIED via archive. alternative · not added to total | per meter | $926 | Elk Grove Water District Aug 15, 2018Mediumdated 2018 |
Sewer connection (tap / SDC) Sewage Collection Impact Fee (SacSewer/SASD) - expansion, per ESD — Local sewer collection impact fee levied by Sacramento Area Sewer District (SacSewer/SASD) - separate district serving Elk Grove. 'Expansion' fee for a single home on a parcel recorded before 7/1/2003 ($4,374/ESD = $3,744 developer project costs + $629 SacSewer costs). 'Relief' alternative $790/ESD. 1 ESD = 1 SFR. NEW SUBDIVISIONS (parcels recorded on/after 7/1/2003) instead pay $26,421 per net acre (expansion) - see excluded row. VERIFIED via archived SacSewer page. | per dwelling unit | $4,374 | Sacramento Area Sewer District / Regional San Jul 1, 2025Medium |
Sewer connection (tap / SDC) Sewage Collection Impact Fee (SASD) - new subdivision, per net acre — Applies to NEW subdivisions (most new construction): SASD collection expansion fee is $26,421/net acre (= $22,466 developer project costs + $3,775 SacSewer costs); 'relief' alternative $4,742/net acre. Excluded from per-unit total because unit basis is per-acre; builders of new subdivisions pay this INSTEAD OF the per-ESD figure. VERIFIED via archive. alternative · not added to total | per acre | $26,421 | Sacramento Area Sewer District / Regional San Jul 1, 2025Medium |
Sewer connection (tap / SDC) Sewage Treatment Impact Fee (Regional San/SRCSD) - new communities, per ESD — Regional treatment impact fee levied by Sacramento Regional County Sanitation District (Regional San/SRCSD) - separate regional district. 'New Communities' rate used as primary; 'Infill Communities' rate is $3,283/ESD (excluded row). 1 ESD = 1 SFR. This is ADDITIVE to the SASD collection fee (different agency/purpose: treatment vs collection). VERIFIED via archive. | per dwelling unit | $6,479 | Sacramento Area Sewer District / Regional San Jul 1, 2025Medium |
Sewer connection (tap / SDC) Sewage Treatment Impact Fee (Regional San) - infill, per ESD — Infill-area variant of Regional San treatment impact fee. Excluded - New Communities rate used as primary. VERIFIED via archive. alternative · not added to total | per dwelling unit | $3,283 | Sacramento Area Sewer District / Regional San Jul 1, 2025Medium |
City
Temecula, CA
$66,254
Total per single-family home
impact + connection fees
$52,389
Impact / development fees
roads, parks, schools…
$13,865
Water & sewer connection
tap / capacity / SDC
$18,137
Per multifamily unit
total fees / unit
Impact / development fees
| Fee (local term) | Basis | Amount | Source · effective |
|---|---|---|---|
General government / capital Public Facilities Development Impact Fee (combined DIF) — City of Temecula combined Public Facilities DIF per detached dwelling unit (Res. 03-63, annual BCI adjustment). Flyer does not break this into sub-categories (parks/fire/police/etc. are bundled). VERIFIED 2026-06-17 against re-fetched DIF flyer. | per dwelling unit | $14,416 | City of Temecula Jul 1, 2025High |
Transportation / roads TUMF (regional transportation mitigation fee, WRCOG) — Levied by Western Riverside Council of Governments (separate agency) on all new development in member jurisdictions including Temecula. Base AB-602 schedule rate; SF rate adjusted lower/higher by home size per AB-602 footnote on schedule. Get project-specific estimate from WRCOG. VERIFIED 2026-06-17 against re-fetched TUMF schedule (verbatim). | per dwelling unit | $15,476 | Western Riverside Council of Governments Apr 1, 2025High |
Schools School facilities fee (Level 1, Temecula Valley USD) — Levied by Temecula Valley Unified School District (separate district), per assessable sq ft. A ~2,100 sf home ≈ $10,857. Current rate through 6/15/2026; increases to $5.38/sf effective 6/16/2026. Same rate applies to multifamily and ADUs >500 sf. VERIFIED 2026-06-17 against re-fetched TVUSD developer-fees page. | per sq ft | $5.17 | Temecula Valley Unified School District Jan 1, 2025High |
Parks & recreation Quimby parks land in-lieu fee — Chapter 16.33 parkland dedication in-lieu fee per the flyer's worked example for a single-family detached unit (avg density 3.12 persons/DU x 0.005 acre/person x $310,000/acre base land value). Applies only when land is not dedicated; actual fee varies with home density/type. VERIFIED 2026-06-17 against re-fetched DIF flyer worked example. | per dwelling unit | $4,836 | City of Temecula Jul 1, 2025Medium |
Mitigation MSHCP habitat conservation fee (Western Riverside, WRCRCA) — Multiple Species Habitat Conservation Plan Local Development Mitigation Fee (Ord. 07-01, calculated by WRCRCA, CPI-adjusted). Representative lowest-density residential tier (<8.0 DU/acre) typical for detached SF. Plus $15.45 admin fee per payment. Denser tiers shown as excluded rows. VERIFIED 2026-06-17 against re-fetched DIF flyer. | per dwelling unit | $4,486 | City of Temecula Jul 1, 2025High |
Mitigation Stephens' Kangaroo Rat (K-Rat) habitat fee — Habitat Conservation Stephens' Kangaroo Rat Mitigation Fee (Ord. 96-17) for lots greater than 1/2 gross acre; smaller/other residential charged $500/disturbed acre. 75% reduction for 501(c)(3) entities. VERIFIED 2026-06-17 against re-fetched DIF flyer. | per dwelling unit | $250 | City of Temecula Jul 1, 2025High |
Transportation / roads Uptown Temecula New Streets In-Lieu Fee — Res. 19-26; applies ONLY to residential development within the Uptown Temecula Specific Plan area, not citywide. Excluded from the general per-unit total because it is geographically limited. VERIFIED 2026-06-17 against re-fetched DIF flyer; excludeFromTotal flag correct. alternative · not added to total | per dwelling unit | $7,895 | City of Temecula Jul 1, 2025High |
Water & sewer connection fees
| Fee (local term) | Basis | Amount | Source · effective |
|---|---|---|---|
Water connection (tap / SDC) Water capacity fee (Rancho California Water District, Rancho Division) — RCWD water system capacity fee per Meter Equivalent Unit; a base 3/4" residential meter = 1 MEU. Current adopted fee (FY2025/26). RCWD proposed an increase to $3,183/MEU targeted for Jan 1, 2026 (board action requested Oct 9, 2025); final adoption NOT confirmed (proposed schedule only). Temecula water service is RCWD. VERIFIED 2026-06-17 against re-fetched RCWD capacity-fee workshop PDF (verbatim $2,943 per MEU current; $3,183 proposed). | per meter | $2,943 | Rancho California Water District Jul 1, 2025Medium |
Water connection (tap / SDC) Water capacity fee — Santa Rosa Water sub-area (RCWD) — Alternate RCWD service sub-area (Santa Rosa Water) capacity fee per MEU; mutually exclusive with the base Rancho Division fee depending on parcel location. Excluded from total. VERIFIED 2026-06-17 against re-fetched RCWD workshop PDF; excludeFromTotal flag correct. alternative · not added to total | per meter | $3,102 | Rancho California Water District Jul 1, 2025Medium |
Sewer connection (tap / SDC) Sewer Financial Participation Charge (EMWD) — Eastern Municipal Water District (separate district; confirmed Temecula's sewer/wastewater provider) per Equivalent Dwelling Unit. Additive with the Sewer Treatment Plant Capacity Charge and Recycled Water Supply Development Fee below. 2026 fee. VERIFIED 2026-06-17 against re-fetched EMWD charges-and-deposits page. | per meter | $3,626 | Eastern Municipal Water District Jan 1, 2026Medium |
Sewer connection (tap / SDC) Sewer Treatment Plant Capacity Charge (EMWD) — EMWD sewer treatment plant capacity charge per EDU; additive component of the total residential sewer connection cost (~$10,922/EDU when combined with Financial Participation + Recycled Water). 2026 fee. VERIFIED 2026-06-17 against re-fetched EMWD page. | per meter | $6,876 | Eastern Municipal Water District Jan 1, 2026Medium |
Sewer connection (tap / SDC) Recycled Water Supply Development Fee (EMWD) — EMWD recycled water supply development fee per EDU; additive component of the residential sewer connection cost. 2026 fee. VERIFIED 2026-06-17 against re-fetched EMWD page. | per meter | $420 | Eastern Municipal Water District Jan 1, 2026Medium |
What drives the difference
Elk Grove’s $70,887 per single-family home is $4,633 (7%) above Temecula’s $66,254. The largest single difference is in transportation / roads: Elk Grove charges about $25,305 there versus $15,476 in Temecula — a $9,829 swing that accounts for much of the overall gap. The two also differ in how much falls on water and sewer connection charges: $16,258 in Elk Grove versus $13,865 in Temecula.
Keep comparing
Elk Grove vs Temecula impact fees — FAQ
- Which has higher impact fees, Elk Grove or Temecula?
- Elk Grove, CA is higher. A single-family home pays about $70,887 per unit in Elk Grove versus $66,254 in Temecula, CA — $4,633 (7%) more, as of 2026.
- How much more does it cost to build a home in Elk Grove than in Temecula?
- About $4,633 more per single-family home — $70,887 in Elk Grove, CA versus $66,254 in Temecula, CA, a difference of 7% in total development impact and connection fees.
- What's the difference between impact fees in Elk Grove and Temecula for a single-family home?
- Elk Grove, CA charges about $70,887 per single-family home ($54,629 impact + $16,258 water/sewer connection), while Temecula, CA charges about $66,254 ($52,389 impact + $13,865 connection). Figures are normalized from official sources for 2026.