ImpactFeeAtlasCompare fees

Elk Grove, CA vs St. George, UT: Development Impact Fees Compared (2026)

A single-family home pays about $70,887 in Elk Grove vs $33,173 in St. George Elk Grove is $37,714 (114%) higher. Every figure below is normalized per dwelling unit by category, with links to each jurisdiction’s official sources.

City

Elk Grove, CA

$70,887
Total per single-family home
impact + connection fees
$54,629
Impact / development fees
roads, parks, schools…
$16,258
Water & sewer connection
tap / capacity / SDC
$9,793
Per multifamily unit
total fees / unit

Impact / development fees

Fee (local term)BasisAmountSource · effective
General government / capital
Capital Facilities Fee (civic center, police, corp yard, animal shelter, library, transit) — Citywide; applies to all development. Components per booklet: City Admin Facilities $537, Police Facilities $1,405, Corporation Yard $615, Corp Yard-Animal Shelter $405, Library $1,646, Transit $852, plus 4% admin $218. Police, library, transit etc. are sub-components of this single CFF - reported as one row to avoid double counting. Adjusted each Jan 1 for inflation. VERIFIED against archived 1/1/2026 booklet.
per dwelling unit$5,678City of Elk Grove Finance Department
Jan 1, 2026High
Police
CFF component - Police Facilities (informational, included in Capital Facilities row) — Informational breakout only - already counted inside the $5,678 Capital Facilities Fee. Excluded from total to avoid double counting. VERIFIED.
alternative · not added to total
per dwelling unit$1,405City of Elk Grove Finance Department
Jan 1, 2026High
Library
CFF component - Library Facilities (informational, included in Capital Facilities row) — Informational breakout only - already counted inside the $5,678 Capital Facilities Fee. Excluded to avoid double counting. VERIFIED.
alternative · not added to total
per dwelling unit$1,646City of Elk Grove Finance Department
Jan 1, 2026High
Affordable housing
Affordable Housing Fee — Citywide; funds low/very-low income housing. Total includes 3% admin ($185). Adjusted each Jan 1. VERIFIED.
per dwelling unit$6,354City of Elk Grove Finance Department
Jan 1, 2026High
Transportation / roads
Roadway Fee (2,001-2,700 sq ft tier) — Citywide. Representative tier for a ~2,000-2,500 sq ft home. Tiered by home size; total includes 5.5% admin. Adjusted each Jan 1 (Cal-Trans Road Construction Cost Index). VERIFIED.
per dwelling unit$16,638City of Elk Grove Finance Department
Jan 1, 2026High
Transportation / roads
Roadway Fee (1,701-2,000 sq ft tier) — Alternate size tier (1,701-2,000 sq ft). Excluded - use the 2,001-2,700 tier as primary. VERIFIED.
alternative · not added to total
per dwelling unit$15,125City of Elk Grove Finance Department
Jan 1, 2026High
Transportation / roads
Roadway Fee (1,401-1,700 sq ft tier) — Alternate size tier. Excluded. VERIFIED.
alternative · not added to total
per dwelling unit$13,008City of Elk Grove Finance Department
Jan 1, 2026High
Transportation / roads
Roadway Fee (2,701-3,400 sq ft tier) — Alternate (larger) size tier. Excluded. VERIFIED.
alternative · not added to total
per dwelling unit$17,697City of Elk Grove Finance Department
Jan 1, 2026High
Transportation / roads
Active Transportation Fee (2,001-2,700 sq ft tier) — Citywide; funds bike/pedestrian/trail facilities. Representative tier. Includes 5.5% admin. Adjusted each Jan 1. VERIFIED.
per dwelling unit$2,681City of Elk Grove Finance Department
Jan 1, 2026High
Transportation / roads
Active Transportation Fee (1,701-2,000 sq ft tier) — Alternate size tier. Excluded. VERIFIED.
alternative · not added to total
per dwelling unit$2,438City of Elk Grove Finance Department
Jan 1, 2026High
Fire / EMS
Fire Fee (Zone 1 - Elk Grove) — Fee levied for Cosumnes CSD (fire), collected by City. Zone 1 used as primary. Includes 3% admin. Zones 2-5 are lower because Mello-Roos CFDs fund part of fire facilities there. Adjusted each Jan 1. VERIFIED.
per dwelling unit$2,652City of Elk Grove Finance Department
Jan 1, 2026High
Fire / EMS
Fire Fee (Zone 2 - Laguna) — Mutually-exclusive zone variant. Excluded. VERIFIED.
alternative · not added to total
per dwelling unit$2,588City of Elk Grove Finance Department
Jan 1, 2026High
Fire / EMS
Fire Fee (Zone 3 - Laguna West) — Mutually-exclusive zone variant. Excluded. VERIFIED.
alternative · not added to total
per dwelling unit$2,466City of Elk Grove Finance Department
Jan 1, 2026High
Fire / EMS
Fire Fee (Zone 4 - Lakeside) — Mutually-exclusive zone variant. Excluded. VERIFIED.
alternative · not added to total
per dwelling unit$2,560City of Elk Grove Finance Department
Jan 1, 2026High
Fire / EMS
Fire Fee (Zone 5 - Stonelake) — Mutually-exclusive zone variant. Excluded. VERIFIED.
alternative · not added to total
per dwelling unit$2,433City of Elk Grove Finance Department
Jan 1, 2026High
Transportation / roads
Measure A Transportation Mitigation Fee (Large >2,400 sq ft) — Citywide regional fee collected for Sacramento Transportation Authority (STA). Tiered by size; 'Large' used as primary representative. Includes 2% admin. Adjusted each Jul 1. VERIFIED.
per dwelling unit$1,793City of Elk Grove Finance Department
Jul 1, 2025High
Transportation / roads
Measure A Transportation Mitigation Fee (Medium 1,601-2,400 sq ft) — Alternate Measure A size tier. Excluded - use Large tier as primary. VERIFIED.
alternative · not added to total
per dwelling unit$1,631City of Elk Grove Finance Department
Jul 1, 2025High
Transportation / roads
I-5 Subregional Corridor Mitigation Fee — Citywide (City of Elk Grove District 4). Funds I-5 transportation facilities. DUE rate 1.00 for SFR; includes 3% admin. Adjusted each Jul 1. VERIFIED.
per dwelling unit$4,193City of Elk Grove Finance Department
Jul 1, 2025High
Schools
School Facilities / Developer Fee (EGUSD) - residential, per sq ft — Levied by Elk Grove Unified School District (separate district), mandatory before building permit per Ed. Code 17620. $7.32/sq ft through 6/30/2026; drops to $7.23/sq ft effective 7/1/2026. Confirmed live on EGUSD page. Exceeds statewide Level 1 max - EGUSD justifies via Needs Analysis. ADUs <=750 sq ft and additions <=500 sq ft exempt. This per-sqft row is excluded from total; the per-DU dollar figure is the next row. VERIFIED.
alternative · not added to total
per sq ft$7.32Elk Grove Unified School District
Jul 1, 2025High
Schools
School Facilities / Developer Fee (EGUSD) - SFR @ 2,000 sq ft — Computed: $7.32/sq ft x 2,000 sq ft = $14,640. Attributed to Elk Grove Unified School District (separate district). Scale to actual home square footage. Real, mandatory builder cost collected before permit issuance. Per-sqft rate VERIFIED; per-DU dollar is a computed estimate (medium confidence).
per dwelling unit$14,640Elk Grove Unified School District
Jul 1, 2025Medium
Parks & recreation
SEPA Park & Trail Fee (plan-area specific) — Applies ONLY within the Southeast Policy Area (SEPA) specific plan. Park $13,659 + Trail $12,330 = $25,989/unit. Mutually exclusive with other plan-area park fees. Excluded from citywide total but a real, large cost for builders in SEPA. Passed through to Cosumnes CSD. VERIFIED.
alternative · not added to total
per dwelling unit$25,989City of Elk Grove Finance Department
Jan 1, 2026High
Parks & recreation
LRSP Supplemental Park Fee (plan-area specific - Laguna Ridge) — Applies ONLY within Laguna Ridge Specific Plan. Facilities ($14,080+$563) + Land ($6,320+$253) components = $21,216. In ADDITION to the Laguna Ridge Park Fee ($5,136/unit) for lots in that plan area. Excluded from citywide total (geographic). Plus Quimby in-lieu land obligations may apply. VERIFIED.
alternative · not added to total
per dwelling unit$21,216City of Elk Grove Finance Department
Jan 1, 2026High
Parks & recreation
Laguna Ridge Park Fee (plan-area specific) — Applies ONLY within Laguna Ridge area. Excluded (geographic/mutually-exclusive). VERIFIED.
alternative · not added to total
per dwelling unit$5,136City of Elk Grove Finance Department
Jan 1, 2026High
Parks & recreation
East Franklin Park Facilities Fee (plan-area specific) — Applies ONLY within East Franklin Specific Plan. Passed through to Cosumnes CSD. Excluded (geographic). VERIFIED.
alternative · not added to total
per dwelling unit$10,731City of Elk Grove Finance Department
Jan 1, 2026High
Parks & recreation
Eastern Elk Grove Park Fee (plan-area specific) — Applies ONLY within Eastern Elk Grove Specific Plan. Excluded (geographic). VERIFIED.
alternative · not added to total
per dwelling unit$8,582City of Elk Grove Finance Department
Jan 1, 2026High
Parks & recreation
Stonelake Park Fee (plan-area specific) — Applies ONLY within Stonelake area. Passed through to Cosumnes CSD. Excluded (geographic). VERIFIED.
alternative · not added to total
per dwelling unit$4,213City of Elk Grove Finance Department
Jan 1, 2026High
Drainage / stormwater
SEPA/LRSP Phase 3 Drainage Fee (plan-area specific, per acre) — Applies ONLY within SEPA (North Sub-Shed shown as example; varies by basin S4-S8/LRSP Phase 3). Per net acre, not per unit. Excluded from per-unit total (geographic + per-acre basis). There is NO citywide drainage impact fee in Elk Grove. VERIFIED.
alternative · not added to total
per acre$35,194City of Elk Grove Finance Department
Jan 1, 2026High
Open space
Swainson's Hawk Mitigation Fee (per acre of suitable habitat) — CORRECTED FROM RESEARCHER PLACEHOLDER ($0/low). Booklet publishes the actual amount: $17,396/acre acquisition+admin + $444/acre ongoing monitoring = $17,840/acre total, due prior to grading permit. Land-conversion habitat mitigation per acre of impacted suitable Swainson's Hawk habitat (determined during CEQA), NOT a per-dwelling-unit fee; projects >=40 acres must dedicate land in perpetuity instead. Excluded from per-DU total (per-acre, conditional). VERIFIED against archived 1/1/2026 booklet.
alternative · not added to total
per acre$17,840City of Elk Grove Finance Department
Jan 1, 2026High

Water & sewer connection fees

Fee (local term)BasisAmountSource · effective
Water connection (tap / SDC)
Water Connection Fee + Meter Charge (EGWD Service Area 1, 1" meter) — Levied by Elk Grove Water District (separate utility). 1" is the smallest meter published (no 3/4" tier shown). Total = $4,479 connection fee + $926 meter charge. Per Ord. 8.15.18.01 / 2018 Water Connection Fee Study (latest published). VERIFIED via archived EGWD page (2025-12-10 snapshot).
per meter$5,405Elk Grove Water District
Aug 15, 2018Mediumdated 2018
Water connection (tap / SDC)
Water Connection (EGWD Service Area 2, 1" meter) — Mutually-exclusive service area. In Service Area 2 the capacity charge is blank/$0 (infrastructure funded by other means, e.g., CFD), only the $926 meter charge applies. Excluded - Service Area 1 used as primary representative of full development cost. VERIFIED via archive.
alternative · not added to total
per meter$926Elk Grove Water District
Aug 15, 2018Mediumdated 2018
Sewer connection (tap / SDC)
Sewage Collection Impact Fee (SacSewer/SASD) - expansion, per ESD — Local sewer collection impact fee levied by Sacramento Area Sewer District (SacSewer/SASD) - separate district serving Elk Grove. 'Expansion' fee for a single home on a parcel recorded before 7/1/2003 ($4,374/ESD = $3,744 developer project costs + $629 SacSewer costs). 'Relief' alternative $790/ESD. 1 ESD = 1 SFR. NEW SUBDIVISIONS (parcels recorded on/after 7/1/2003) instead pay $26,421 per net acre (expansion) - see excluded row. VERIFIED via archived SacSewer page.
per dwelling unit$4,374Sacramento Area Sewer District / Regional San
Jul 1, 2025Medium
Sewer connection (tap / SDC)
Sewage Collection Impact Fee (SASD) - new subdivision, per net acre — Applies to NEW subdivisions (most new construction): SASD collection expansion fee is $26,421/net acre (= $22,466 developer project costs + $3,775 SacSewer costs); 'relief' alternative $4,742/net acre. Excluded from per-unit total because unit basis is per-acre; builders of new subdivisions pay this INSTEAD OF the per-ESD figure. VERIFIED via archive.
alternative · not added to total
per acre$26,421Sacramento Area Sewer District / Regional San
Jul 1, 2025Medium
Sewer connection (tap / SDC)
Sewage Treatment Impact Fee (Regional San/SRCSD) - new communities, per ESD — Regional treatment impact fee levied by Sacramento Regional County Sanitation District (Regional San/SRCSD) - separate regional district. 'New Communities' rate used as primary; 'Infill Communities' rate is $3,283/ESD (excluded row). 1 ESD = 1 SFR. This is ADDITIVE to the SASD collection fee (different agency/purpose: treatment vs collection). VERIFIED via archive.
per dwelling unit$6,479Sacramento Area Sewer District / Regional San
Jul 1, 2025Medium
Sewer connection (tap / SDC)
Sewage Treatment Impact Fee (Regional San) - infill, per ESD — Infill-area variant of Regional San treatment impact fee. Excluded - New Communities rate used as primary. VERIFIED via archive.
alternative · not added to total
per dwelling unit$3,283Sacramento Area Sewer District / Regional San
Jul 1, 2025Medium
Elk Groveimpact fees →
City

St. George, UT

$33,173
Total per single-family home
impact + connection fees
$12,172
Impact / development fees
roads, parks, schools…
$21,001
Water & sewer connection
tap / capacity / SDC
Per multifamily unit
total fees / unit

Impact / development fees

Fee (local term)BasisAmountSource · effective
Parks & recreation
Parks & Recreation Impact Fee — Per dwelling unit, single-family. Confirmed verbatim on 4/21/21 schedule.
per dwelling unit$4,525City of St. George, Utah
Apr 21, 2021Highdated 2021
Transportation / roads
Transportation Impact Fee — Per dwelling unit, single-family. Confirmed verbatim.
per dwelling unit$2,188City of St. George, Utah
Apr 21, 2021Highdated 2021
Police
Police Impact Fee (Residential) — Residential single-family per unit. Confirmed verbatim.
per dwelling unit$95City of St. George, Utah
Apr 21, 2021Highdated 2021
Fire / EMS
Fire/EMS Impact Fee (Residential) — Residential single-family per unit (Fire/EMS column). Confirmed verbatim.
per dwelling unit$320City of St. George, Utah
Apr 21, 2021Highdated 2021
Drainage / stormwater
Storm Drain (Drainage) Impact Fee (Residential) — Residential single-family per unit (Drainage column). Confirmed verbatim.
per dwelling unit$781City of St. George, Utah
Apr 21, 2021Highdated 2021
General government / capital
Electrical (Power) Impact Fee - Residential single-phase 100 AMP — St. George is a municipal power provider; residential single-phase 100 AMP service (typical SF) used as representative. Additive. Confirmed verbatim.
per meter$3,893City of St. George, Utah
Apr 21, 2021Highdated 2021
General government / capital
Electrical (Power) Impact Fee - Residential single-phase 200 AMP — 200 AMP residential single-phase tier, mutually exclusive with 100 AMP. Excluded.
alternative · not added to total
per meter$4,809City of St. George, Utah
Apr 21, 2021Highdated 2021
General government / capital
Power Meter Fee - Underground — Power meter fee, underground service. Additive. Confirmed verbatim.
per meter$370City of St. George, Utah
Apr 21, 2021Highdated 2021

Water & sewer connection fees

Fee (local term)BasisAmountSource · effective
Water connection (tap / SDC)
Culinary Water Impact Fee (City) - base 0.8" meter — City culinary water impact fee, smallest/base residential 0.8" meter. Separate from and additive to WCWCD regional water impact fee.
per meter$1,996City of St. George, Utah
Apr 21, 2021Highdated 2021
Water connection (tap / SDC)
Culinary Water Impact Fee (City) - 1.0" meter — Larger meter tier, mutually exclusive with 0.8" base. Excluded.
alternative · not added to total
per meter$4,311City of St. George, Utah
Apr 21, 2021Highdated 2021
Water connection (tap / SDC)
Culinary Water Connection Fee (City) - 0.8" meter, water on lot — Additive water connection fee (on-lot), base 0.8" meter. If water not on lot it is $1,207.
per meter$223City of St. George, Utah
Apr 21, 2021Highdated 2021
Water connection (tap / SDC)
Culinary Water Connection Fee (City) - 0.8" meter, water NOT on lot — Alternative to on-lot connection fee. Excluded (mutually exclusive with on-lot $223).
alternative · not added to total
per meter$1,207City of St. George, Utah
Apr 21, 2021Highdated 2021
Sewer connection (tap / SDC)
Local & Regional Wastewater Impact Fee (City) - base 0.8" meter — Total wastewater impact fee for base 0.8" meter = $137 local + $1,379 regional. Confirmed verbatim.
per meter$1,516City of St. George, Utah
Apr 21, 2021Highdated 2021
Sewer connection (tap / SDC)
Local & Regional Wastewater Impact Fee (City) - 1.0" meter — Larger meter tier, mutually exclusive with 0.8" base. Excluded.
alternative · not added to total
per meter$3,274City of St. George, Utah
Apr 21, 2021Highdated 2021
Water connection (tap / SDC)
WCWCD Regional Water Impact Fee (separate district) — SEPARATE DISTRICT FEE: Washington County Water Conservancy District regional water impact fee, $17,266 per ERC for a 3/4"/5/8" residential meter. Confirmed verbatim on the WCWCD page. Paid by builders in St. George IN ADDITION to the city culinary water impact fee. Reduced fee available under Ultra Water Efficiency Standards (amount not published). Confidence medium and effectiveDate cleared because the district page publishes no specific effective date or resolution number.
per meter$17,266Washington County Water Conservancy District
Medium
St. Georgeimpact fees →

What drives the difference

Elk Grove’s $70,887 per single-family home is $37,714 (114%) above St. George’s $33,173. The largest single difference is in transportation / roads: Elk Grove charges about $25,305 there versus $2,188 in St. George — a $23,117 swing that accounts for much of the overall gap. The two also differ in how much falls on water and sewer connection charges: $16,258 in Elk Grove versus $21,001 in St. George.

Keep comparing

Elk Grove vs St. George impact fees — FAQ

Which has higher impact fees, Elk Grove or St. George?
Elk Grove, CA is higher. A single-family home pays about $70,887 per unit in Elk Grove versus $33,173 in St. George, UT — $37,714 (114%) more, as of 2026.
How much more does it cost to build a home in Elk Grove than in St. George?
About $37,714 more per single-family home — $70,887 in Elk Grove, CA versus $33,173 in St. George, UT, a difference of 114% in total development impact and connection fees.
What's the difference between impact fees in Elk Grove and St. George for a single-family home?
Elk Grove, CA charges about $70,887 per single-family home ($54,629 impact + $16,258 water/sewer connection), while St. George, UT charges about $33,173 ($12,172 impact + $21,001 connection). Figures are normalized from official sources for 2026.