Elk Grove, CA vs Erie, CO: Development Impact Fees Compared (2026)

A single-family home pays about $70,887 in Elk Grove vs $94,679 in Erie Erie is $23,792 (34%) higher. Every figure below is normalized per dwelling unit by category, with links to each jurisdiction’s official sources.

City

Elk Grove, CA

$70,887
Total per single-family home
impact + connection fees
$54,629
Impact / development fees
roads, parks, schools…
$16,258
Water & sewer connection
tap / capacity / SDC
$9,793
Per multifamily unit
total fees / unit

Impact / development fees

Fee (local term)BasisAmountSource · effective
General government / capital
Capital Facilities Fee (civic center, police, corp yard, animal shelter, library, transit) — Citywide; applies to all development. Components per booklet: City Admin Facilities $537, Police Facilities $1,405, Corporation Yard $615, Corp Yard-Animal Shelter $405, Library $1,646, Transit $852, plus 4% admin $218. Police, library, transit etc. are sub-components of this single CFF - reported as one row to avoid double counting. Adjusted each Jan 1 for inflation. VERIFIED against archived 1/1/2026 booklet.
per dwelling unit$5,678City of Elk Grove Finance Department
Jan 1, 2026High
Police
CFF component - Police Facilities (informational, included in Capital Facilities row) — Informational breakout only - already counted inside the $5,678 Capital Facilities Fee. Excluded from total to avoid double counting. VERIFIED.
alternative · not added to total
per dwelling unit$1,405City of Elk Grove Finance Department
Jan 1, 2026High
Library
CFF component - Library Facilities (informational, included in Capital Facilities row) — Informational breakout only - already counted inside the $5,678 Capital Facilities Fee. Excluded to avoid double counting. VERIFIED.
alternative · not added to total
per dwelling unit$1,646City of Elk Grove Finance Department
Jan 1, 2026High
Affordable housing
Affordable Housing Fee — Citywide; funds low/very-low income housing. Total includes 3% admin ($185). Adjusted each Jan 1. VERIFIED.
per dwelling unit$6,354City of Elk Grove Finance Department
Jan 1, 2026High
Transportation / roads
Roadway Fee (2,001-2,700 sq ft tier) — Citywide. Representative tier for a ~2,000-2,500 sq ft home. Tiered by home size; total includes 5.5% admin. Adjusted each Jan 1 (Cal-Trans Road Construction Cost Index). VERIFIED.
per dwelling unit$16,638City of Elk Grove Finance Department
Jan 1, 2026High
Transportation / roads
Roadway Fee (1,701-2,000 sq ft tier) — Alternate size tier (1,701-2,000 sq ft). Excluded - use the 2,001-2,700 tier as primary. VERIFIED.
alternative · not added to total
per dwelling unit$15,125City of Elk Grove Finance Department
Jan 1, 2026High
Transportation / roads
Roadway Fee (1,401-1,700 sq ft tier) — Alternate size tier. Excluded. VERIFIED.
alternative · not added to total
per dwelling unit$13,008City of Elk Grove Finance Department
Jan 1, 2026High
Transportation / roads
Roadway Fee (2,701-3,400 sq ft tier) — Alternate (larger) size tier. Excluded. VERIFIED.
alternative · not added to total
per dwelling unit$17,697City of Elk Grove Finance Department
Jan 1, 2026High
Transportation / roads
Active Transportation Fee (2,001-2,700 sq ft tier) — Citywide; funds bike/pedestrian/trail facilities. Representative tier. Includes 5.5% admin. Adjusted each Jan 1. VERIFIED.
per dwelling unit$2,681City of Elk Grove Finance Department
Jan 1, 2026High
Transportation / roads
Active Transportation Fee (1,701-2,000 sq ft tier) — Alternate size tier. Excluded. VERIFIED.
alternative · not added to total
per dwelling unit$2,438City of Elk Grove Finance Department
Jan 1, 2026High
Fire / EMS
Fire Fee (Zone 1 - Elk Grove) — Fee levied for Cosumnes CSD (fire), collected by City. Zone 1 used as primary. Includes 3% admin. Zones 2-5 are lower because Mello-Roos CFDs fund part of fire facilities there. Adjusted each Jan 1. VERIFIED.
per dwelling unit$2,652City of Elk Grove Finance Department
Jan 1, 2026High
Fire / EMS
Fire Fee (Zone 2 - Laguna) — Mutually-exclusive zone variant. Excluded. VERIFIED.
alternative · not added to total
per dwelling unit$2,588City of Elk Grove Finance Department
Jan 1, 2026High
Fire / EMS
Fire Fee (Zone 3 - Laguna West) — Mutually-exclusive zone variant. Excluded. VERIFIED.
alternative · not added to total
per dwelling unit$2,466City of Elk Grove Finance Department
Jan 1, 2026High
Fire / EMS
Fire Fee (Zone 4 - Lakeside) — Mutually-exclusive zone variant. Excluded. VERIFIED.
alternative · not added to total
per dwelling unit$2,560City of Elk Grove Finance Department
Jan 1, 2026High
Fire / EMS
Fire Fee (Zone 5 - Stonelake) — Mutually-exclusive zone variant. Excluded. VERIFIED.
alternative · not added to total
per dwelling unit$2,433City of Elk Grove Finance Department
Jan 1, 2026High
Transportation / roads
Measure A Transportation Mitigation Fee (Large >2,400 sq ft) — Citywide regional fee collected for Sacramento Transportation Authority (STA). Tiered by size; 'Large' used as primary representative. Includes 2% admin. Adjusted each Jul 1. VERIFIED.
per dwelling unit$1,793City of Elk Grove Finance Department
Jul 1, 2025High
Transportation / roads
Measure A Transportation Mitigation Fee (Medium 1,601-2,400 sq ft) — Alternate Measure A size tier. Excluded - use Large tier as primary. VERIFIED.
alternative · not added to total
per dwelling unit$1,631City of Elk Grove Finance Department
Jul 1, 2025High
Transportation / roads
I-5 Subregional Corridor Mitigation Fee — Citywide (City of Elk Grove District 4). Funds I-5 transportation facilities. DUE rate 1.00 for SFR; includes 3% admin. Adjusted each Jul 1. VERIFIED.
per dwelling unit$4,193City of Elk Grove Finance Department
Jul 1, 2025High
Schools
School Facilities / Developer Fee (EGUSD) - residential, per sq ft — Levied by Elk Grove Unified School District (separate district), mandatory before building permit per Ed. Code 17620. $7.32/sq ft through 6/30/2026; drops to $7.23/sq ft effective 7/1/2026. Confirmed live on EGUSD page. Exceeds statewide Level 1 max - EGUSD justifies via Needs Analysis. ADUs <=750 sq ft and additions <=500 sq ft exempt. This per-sqft row is excluded from total; the per-DU dollar figure is the next row. VERIFIED.
alternative · not added to total
per sq ft$7.32Elk Grove Unified School District
Jul 1, 2025High
Schools
School Facilities / Developer Fee (EGUSD) - SFR @ 2,000 sq ft — Computed: $7.32/sq ft x 2,000 sq ft = $14,640. Attributed to Elk Grove Unified School District (separate district). Scale to actual home square footage. Real, mandatory builder cost collected before permit issuance. Per-sqft rate VERIFIED; per-DU dollar is a computed estimate (medium confidence).
per dwelling unit$14,640Elk Grove Unified School District
Jul 1, 2025Medium
Parks & recreation
SEPA Park & Trail Fee (plan-area specific) — Applies ONLY within the Southeast Policy Area (SEPA) specific plan. Park $13,659 + Trail $12,330 = $25,989/unit. Mutually exclusive with other plan-area park fees. Excluded from citywide total but a real, large cost for builders in SEPA. Passed through to Cosumnes CSD. VERIFIED.
alternative · not added to total
per dwelling unit$25,989City of Elk Grove Finance Department
Jan 1, 2026High
Parks & recreation
LRSP Supplemental Park Fee (plan-area specific - Laguna Ridge) — Applies ONLY within Laguna Ridge Specific Plan. Facilities ($14,080+$563) + Land ($6,320+$253) components = $21,216. In ADDITION to the Laguna Ridge Park Fee ($5,136/unit) for lots in that plan area. Excluded from citywide total (geographic). Plus Quimby in-lieu land obligations may apply. VERIFIED.
alternative · not added to total
per dwelling unit$21,216City of Elk Grove Finance Department
Jan 1, 2026High
Parks & recreation
Laguna Ridge Park Fee (plan-area specific) — Applies ONLY within Laguna Ridge area. Excluded (geographic/mutually-exclusive). VERIFIED.
alternative · not added to total
per dwelling unit$5,136City of Elk Grove Finance Department
Jan 1, 2026High
Parks & recreation
East Franklin Park Facilities Fee (plan-area specific) — Applies ONLY within East Franklin Specific Plan. Passed through to Cosumnes CSD. Excluded (geographic). VERIFIED.
alternative · not added to total
per dwelling unit$10,731City of Elk Grove Finance Department
Jan 1, 2026High
Parks & recreation
Eastern Elk Grove Park Fee (plan-area specific) — Applies ONLY within Eastern Elk Grove Specific Plan. Excluded (geographic). VERIFIED.
alternative · not added to total
per dwelling unit$8,582City of Elk Grove Finance Department
Jan 1, 2026High
Parks & recreation
Stonelake Park Fee (plan-area specific) — Applies ONLY within Stonelake area. Passed through to Cosumnes CSD. Excluded (geographic). VERIFIED.
alternative · not added to total
per dwelling unit$4,213City of Elk Grove Finance Department
Jan 1, 2026High
Drainage / stormwater
SEPA/LRSP Phase 3 Drainage Fee (plan-area specific, per acre) — Applies ONLY within SEPA (North Sub-Shed shown as example; varies by basin S4-S8/LRSP Phase 3). Per net acre, not per unit. Excluded from per-unit total (geographic + per-acre basis). There is NO citywide drainage impact fee in Elk Grove. VERIFIED.
alternative · not added to total
per acre$35,194City of Elk Grove Finance Department
Jan 1, 2026High
Open space
Swainson's Hawk Mitigation Fee (per acre of suitable habitat) — CORRECTED FROM RESEARCHER PLACEHOLDER ($0/low). Booklet publishes the actual amount: $17,396/acre acquisition+admin + $444/acre ongoing monitoring = $17,840/acre total, due prior to grading permit. Land-conversion habitat mitigation per acre of impacted suitable Swainson's Hawk habitat (determined during CEQA), NOT a per-dwelling-unit fee; projects >=40 acres must dedicate land in perpetuity instead. Excluded from per-DU total (per-acre, conditional). VERIFIED against archived 1/1/2026 booklet.
alternative · not added to total
per acre$17,840City of Elk Grove Finance Department
Jan 1, 2026High

Water & sewer connection fees

Fee (local term)BasisAmountSource · effective
Water connection (tap / SDC)
Water Connection Fee + Meter Charge (EGWD Service Area 1, 1" meter) — Levied by Elk Grove Water District (separate utility). 1" is the smallest meter published (no 3/4" tier shown). Total = $4,479 connection fee + $926 meter charge. Per Ord. 8.15.18.01 / 2018 Water Connection Fee Study (latest published). VERIFIED via archived EGWD page (2025-12-10 snapshot).
per meter$5,405Elk Grove Water District
Aug 15, 2018Mediumdated 2018
Water connection (tap / SDC)
Water Connection (EGWD Service Area 2, 1" meter) — Mutually-exclusive service area. In Service Area 2 the capacity charge is blank/$0 (infrastructure funded by other means, e.g., CFD), only the $926 meter charge applies. Excluded - Service Area 1 used as primary representative of full development cost. VERIFIED via archive.
alternative · not added to total
per meter$926Elk Grove Water District
Aug 15, 2018Mediumdated 2018
Sewer connection (tap / SDC)
Sewage Collection Impact Fee (SacSewer/SASD) - expansion, per ESD — Local sewer collection impact fee levied by Sacramento Area Sewer District (SacSewer/SASD) - separate district serving Elk Grove. 'Expansion' fee for a single home on a parcel recorded before 7/1/2003 ($4,374/ESD = $3,744 developer project costs + $629 SacSewer costs). 'Relief' alternative $790/ESD. 1 ESD = 1 SFR. NEW SUBDIVISIONS (parcels recorded on/after 7/1/2003) instead pay $26,421 per net acre (expansion) - see excluded row. VERIFIED via archived SacSewer page.
per dwelling unit$4,374Sacramento Area Sewer District / Regional San
Jul 1, 2025Medium
Sewer connection (tap / SDC)
Sewage Collection Impact Fee (SASD) - new subdivision, per net acre — Applies to NEW subdivisions (most new construction): SASD collection expansion fee is $26,421/net acre (= $22,466 developer project costs + $3,775 SacSewer costs); 'relief' alternative $4,742/net acre. Excluded from per-unit total because unit basis is per-acre; builders of new subdivisions pay this INSTEAD OF the per-ESD figure. VERIFIED via archive.
alternative · not added to total
per acre$26,421Sacramento Area Sewer District / Regional San
Jul 1, 2025Medium
Sewer connection (tap / SDC)
Sewage Treatment Impact Fee (Regional San/SRCSD) - new communities, per ESD — Regional treatment impact fee levied by Sacramento Regional County Sanitation District (Regional San/SRCSD) - separate regional district. 'New Communities' rate used as primary; 'Infill Communities' rate is $3,283/ESD (excluded row). 1 ESD = 1 SFR. This is ADDITIVE to the SASD collection fee (different agency/purpose: treatment vs collection). VERIFIED via archive.
per dwelling unit$6,479Sacramento Area Sewer District / Regional San
Jul 1, 2025Medium
Sewer connection (tap / SDC)
Sewage Treatment Impact Fee (Regional San) - infill, per ESD — Infill-area variant of Regional San treatment impact fee. Excluded - New Communities rate used as primary. VERIFIED via archive.
alternative · not added to total
per dwelling unit$3,283Sacramento Area Sewer District / Regional San
Jul 1, 2025Medium
Elk Groveimpact fees →
Town

Erie, CO

$94,679
Total per single-family home
impact + connection fees
$16,329
Impact / development fees
roads, parks, schools…
$78,350
Water & sewer connection
tap / capacity / SDC
$9,216
Per multifamily unit
total fees / unit

Impact / development fees

Fee (local term)BasisAmountSource · effective
Parks & recreation
Parks & Recreation Impact Fee
per dwelling unit$2,803Town of Erie, CO
Jan 1, 2026High
Police
Police Facilities Impact Fee
per dwelling unit$686Town of Erie, CO
Jan 1, 2026High
General government / capital
Public Facilities Impact Fee — General/municipal capital facilities impact fee.
per dwelling unit$4,276Town of Erie, CO
Jan 1, 2026High
Drainage / stormwater
Storm Drainage System Impact Fee
per dwelling unit$1,862Town of Erie, CO
Jan 1, 2026High
Transportation / roads
Transportation Facilities Impact Fee (standard area) — PRIMARY transportation rate; applies to property outside the Town Center PD and Historic Old Town (covers most new residential development).
per dwelling unit$6,402Town of Erie, CO
Jan 1, 2026High
Transportation / roads
Transportation Facilities Impact Fee (Town Center / Old Town) — Mutually-exclusive geographic variant (Town Center PD / Historic Old Town OTR/NMU/DT/MR zones); excluded from total in favor of the townwide standard rate. Verified verbatim on live 2026 page.
alternative · not added to total
per dwelling unit$4,546Town of Erie, CO
Jan 1, 2026High
Other
Tree Impact Fee — Per-dwelling-unit tree/urban-forestry impact fee; same $300 for all dwelling types (page shows 'All other dwelling units $300').
per dwelling unit$300Town of Erie, CO
Jan 1, 2026High

Water & sewer connection fees

Fee (local term)BasisAmountSource · effective
Water connection (tap / SDC)
Potable Water Tap Fee (3/4 inch residential) — Base 3/4" residential meter (typical single-family). Fees double for parcels outside Town limits. Confirmed by Ordinance 039-2024 ($17,290).
per meter$17,290Town of Erie, CO
Jan 1, 2026High
Water connection (tap / SDC)
Fee in Lieu of Water Dedication / Raw Water Fee (single-family residential) — SEPARATE, ADDITIVE one-time fee on top of the water tap fee (Ordinance 039-2024: 'separate and distinct fees'). Single largest residential charge. VERIFIED at $52,200 verbatim on the live 2026 fee schedule (sourceIndex 0). NOTE: Ordinance 039-2024 and the Water Dedication Guide state the 2025 fee-in-lieu was $31,400/SFE; the fee escalated to $52,200 for 2026. The 2026 amount is NOT supported by the Water Dedication Guide (which still shows $31,400) — confirmation rests on the live 2026 fee schedule only.
per dwelling unit$52,200Town of Erie, CO
Jan 1, 2026High
Sewer connection (tap / SDC)
Wastewater (Sewer) Tap Fee (3/4 inch) — Base 3/4" residential. Fees double for parcels outside Town limits. Confirmed by Ordinance 039-2024 ('Wastewater tap fee: ¾ inch 8,860.00').
per meter$8,860Town of Erie, CO
Jan 1, 2026High
Water connection (tap / SDC)
Potable Water Tap Fee (1 inch) — Larger meter variant; excluded in favor of the base 3/4" residential meter. Confirmed by Ordinance 039-2024.
alternative · not added to total
per meter$28,820Town of Erie, CO
Jan 1, 2026High
Sewer connection (tap / SDC)
Wastewater (Sewer) Tap Fee (1 inch) — Larger meter variant; excluded in favor of the base 3/4" residential meter. Confirmed by Ordinance 039-2024 ('1 inch 14,767.00').
alternative · not added to total
per meter$14,767Town of Erie, CO
Jan 1, 2026High
Erieimpact fees →

What drives the difference

Erie’s $94,679 per single-family home is $23,792 (34%) above Elk Grove’s $70,887. The largest single difference is in water connection (tap / sdc): Erie charges about $69,490 there versus $5,405 in Elk Grove — a $64,085 swing that accounts for much of the overall gap. The two also differ in how much falls on water and sewer connection charges: $16,258 in Elk Grove versus $78,350 in Erie.

Keep comparing

Elk Grove vs Erie impact fees — FAQ

Which has higher impact fees, Elk Grove or Erie?
Erie, CO is higher. A single-family home pays about $94,679 per unit in Erie versus $70,887 in Elk Grove, CA — $23,792 (34%) more, as of 2026.
How much more does it cost to build a home in Erie than in Elk Grove?
About $23,792 more per single-family home — $94,679 in Erie, CO versus $70,887 in Elk Grove, CA, a difference of 34% in total development impact and connection fees.
What's the difference between impact fees in Elk Grove and Erie for a single-family home?
Elk Grove, CA charges about $70,887 per single-family home ($54,629 impact + $16,258 water/sewer connection), while Erie, CO charges about $94,679 ($16,329 impact + $78,350 connection). Figures are normalized from official sources for 2026.