Draper, UT vs Herriman, UT: Development Impact Fees Compared (2026)
A single-family home pays about $14,661 in Draper vs $17,137 in Herriman — Herriman is $2,476 (17%) higher. Every figure below is normalized per dwelling unit by category, with links to each jurisdiction’s official sources.
City
Draper, UT
$14,661
Total per single-family home
impact + connection fees
$5,487
Impact / development fees
roads, parks, schools…
$9,174
Water & sewer connection
tap / capacity / SDC
—
Per multifamily unit
total fees / unit
Impact / development fees
| Fee (local term) | Basis | Amount | Source · effective |
|---|---|---|---|
Fire / EMS Fire Impact Fee — Draper City fire impact fee. Multifamily is $75.00/unit; commercial $97/KSF, office $47/KSF, industrial $5/KSF. VERIFIED verbatim from Resolution 25-52 fee schedule (PDF line 238). | per dwelling unit | $71 | Draper City Oct 1, 2025High |
Parks & recreation Parks & Recreation Impact Fee — Draper City parks impact fee, tiered by density. SFD detached = $4,162. VERIFIED verbatim (PDF line 243). | per dwelling unit | $4,162 | Draper City Oct 1, 2025High |
Police Police Facilities Impact Fee — Draper City police impact fee. Multifamily $75/unit; commercial $130/KSF, office $46/KSF, industrial $21/KSF. VERIFIED verbatim (PDF line 249). | per dwelling unit | $102 | Draper City Oct 1, 2025High |
Transportation / roads Transportation Facilities Impact Fee — Draper City transportation/roads impact fee. Multifamily $893/unit. VERIFIED verbatim (PDF line 254). | per dwelling unit | $1,152 | Draper City Oct 1, 2025High |
Drainage / stormwater Storm Water Facilities Impact Fee (per ERU) — COLLECTION SUSPENDED — Draper City storm water impact fee is $1,729.00 per ERU on the books, but COLLECTION IS TEMPORARILY SUSPENDED per Ordinance 1480 — a builder currently pays $0 for this. Listed for completeness and excluded from the active total. VERIFIED verbatim (PDF lines above row 273). alternative · not added to total | per dwelling unit | $1,729 | Draper City Jan 1, 2018Highdated 2018 |
Water & sewer connection fees
| Fee (local term) | Basis | Amount | Source · effective |
|---|---|---|---|
Water connection (tap / SDC) Water System Facilities Impact Fee (SFD per unit / 3/4" meter) — Draper City culinary water impact fee (Res 18-19). SFD per unit = base 3/4" meter equivalent ($2,097). 'All other housing types (per unit)' = $1,606. Non-residential is priced by meter size (0.75"=$2,097, 1"=$3,501, 1.5"=$6,982, 2"=$11,175, etc.); non-standard = ERC count x $2,097. Applies where the City of Draper provides water; part of Draper is served by WaterPro (separate provider) with its own fees. VERIFIED verbatim (PDF line 261). | per dwelling unit | $2,097 | Draper City Jan 1, 2018Highdated 2018 |
Water connection (tap / SDC) Water System Hookup (Connection) Fee — 3/4" connection — ADDITIVE physical water hookup fee on top of the water impact fee (PDF: 'Hookup fees are in addition to Water System Facilities Impact Fees'). 3/4" residential meter = $440 (1"=$475, 1.5"=$665, 2"=$810; larger paid directly to installation contractor). VERIFIED verbatim (PDF lines 481, 485). | per meter | $440 | Draper City Oct 1, 2025High |
Sewer connection (tap / SDC) Sewer Impact Fee — Jordan Basin Improvement District, Service Area 1 (separate district) — SEPARATE DISTRICT fee. Draper does NOT levy its own sewer impact fee — sanitary sewer is provided by the Jordan Basin Improvement District (JBID). Most of Draper lies in Salt Lake County = JBID Service Area 1, where the SFD impact fee is $6,637.31 (per current live JBID utility fee schedule). A builder in Draper pays this to JBID. VERIFIED verbatim from JBID fee schedule. | per dwelling unit | $6,637 | Jordan Basin Improvement District —High |
Sewer connection (tap / SDC) Sewer Impact Fee — JBID Service Area 3 (Suncrest/Utah County portion of Draper, remitted to TSSD) — Applies ONLY to the Suncrest portion of Draper in Utah County (JBID Service Area 3), where effluent flows to the Timpanogos Special Service District; fee is remitted to TSSD. This is a MUTUALLY-EXCLUSIVE geographic service-area alternative to the Service Area 1 fee — most Draper builders pay the Service Area 1 fee ($6,637.31). Excluded from the representative SFD total. VERIFIED. alternative · not added to total | per dwelling unit | $5,793 | Jordan Basin Improvement District —High |
Sewer connection (tap / SDC) Sewer Lateral Connection Fee — JBID (4" in asphalt, separate district) — ADDITIVE JBID lateral/connection fee where the District installs the lateral from the main to the property line. Representative 4" lateral in asphalt = $3,600 (4" out of asphalt $3,100; 6" in asphalt $4,500; 6" out of asphalt $4,300). Charged only when the District installs the lateral; a builder may install its own. Excluded from the per-unit impact-fee total since it is a conditional physical-installation charge, not a uniform impact fee. VERIFIED. alternative · not added to total | per meter | $3,600 | Jordan Basin Improvement District —High |
City
Herriman, UT
$17,137
Total per single-family home
impact + connection fees
$7,008
Impact / development fees
roads, parks, schools…
$10,129
Water & sewer connection
tap / capacity / SDC
—
Per multifamily unit
total fees / unit
Impact / development fees
| Fee (local term) | Basis | Amount | Source · effective |
|---|---|---|---|
Transportation / roads Transportation Impact Fee — Herriman City adopted transportation impact fee, Master Fee Schedule effective July 1, 2026. VERIFIED verbatim (line 292). | per dwelling unit | $2,707 | City of Herriman, Utah Jul 1, 2026High |
Fire / EMS Fire Impact Fee (Residential) — Flat per-residential-unit fire/EMS impact fee (applies equally to SFD and MF units). Non-residential is $0.43/sq ft. VERIFIED verbatim (line 366). | per dwelling unit | $549 | City of Herriman, Utah Jul 1, 2026High |
Police Police Impact Fee (Residential) — Flat per-residential-unit police impact fee (applies equally to SFD and MF units). Non-residential is $0.35/sq ft. VERIFIED verbatim (line 369). | per dwelling unit | $201 | City of Herriman, Utah Jul 1, 2026High |
Parks & recreation Parks, Trails and Recreation Impact Fee (Single Family) — Herriman City Parks, Trails and Recreation impact fee. VERIFIED verbatim (line 375, under 'Parks Impact Fee' header). | per dwelling unit | $3,551 | City of Herriman, Utah Jul 1, 2026High |
Drainage / stormwater Storm Drain Impact Fee (Main Herriman service area) — Storm drain impact fee is charged PER ACRE of development, not per dwelling unit, so it cannot be cleanly normalized to a per-unit basis (varies with lot/density) and is intentionally left out of the per-unit total. Representative primary = Main Herriman area. The Towne Center service area is $4,088.17/acre (mutually exclusive geographic variant). VERIFIED verbatim (line 372). | per acre | $2,611 | City of Herriman, Utah Jul 1, 2026High |
Drainage / stormwater Storm Drain Impact Fee (Towne Center service area) — Mutually-exclusive geographic variant of the storm drain impact fee (Towne Center area). Excluded; Main Herriman area is the representative primary. VERIFIED verbatim (line 373). alternative · not added to total | per acre | $4,088 | City of Herriman, Utah Jul 1, 2026High |
Water & sewer connection fees
| Fee (local term) | Basis | Amount | Source · effective |
|---|---|---|---|
Water connection (tap / SDC) Water Impact Fee (Single Family, <0.24 acre lot) - culinary + secondary capacity — Herriman culinary + secondary WATER IMPACT (capacity) fee, tiered by lot size. Representative ~typical SFD lot (<0.24 acre) = $5,274 (Indoor $964 + Outdoor $4,310). This is the capacity/impact fee and is ADDITIVE to the separate water meter Connection Fee below. Larger lots cost more (0.25-0.49ac=$6,932; 0.50-0.74ac=$8,259; 0.75-0.99ac=$8,590; 1ac=$9,585). VERIFIED verbatim (line 380, under 'Water Impact Fee Schedule'). | per dwelling unit | $5,274 | City of Herriman, Utah Jul 1, 2026High |
Water connection (tap / SDC) Water Connection Fee - Full Installation 3/4" Meter — Physical water meter installation/connection fee for the standard residential 3/4" meter. This is SEPARATE FROM and ADDITIVE TO the water impact (capacity) fee above. Larger meters cost more (1"=$1,785; 1.5"=$1,800; 2"=$2,500). VERIFIED verbatim (line 233, under 'Water Connection Fees'). | per meter | $1,585 | City of Herriman, Utah Jul 1, 2026High |
Sewer connection (tap / SDC) Sewer Impact Fee - Single Family Detached (Jordan Basin Improvement District, Service Area 1) — Sewer is NOT provided by Herriman City. It is levied by a SEPARATE district: Jordan Basin Improvement District (formerly South Valley Sewer District, renamed 2024). Confirmed Herriman lies in Salt Lake County = JBID Service Area 1 (budget states 'Service Area 1 basically encompasses Salt Lake County'). SFD impact (connection) fee = $3,270/unit; 2026 rate unchanged from 2025. Resolution 11-25-2025-04 calls impact fees 'connection fee(s)' and adopts them for Service Area No. 1. VERIFIED verbatim in 2026 budget (line 901). | per dwelling unit | $3,270 | Jordan Basin Improvement District (formerly South Valley Sewer District) Jan 1, 2026High |
What drives the difference
Herriman’s $17,137 per single-family home is $2,476 (17%) above Draper’s $14,661. The largest single difference is in water connection (tap / sdc): Herriman charges about $6,859 there versus $2,537 in Draper — a $4,322 swing that accounts for much of the overall gap. The two also differ in how much falls on water and sewer connection charges: $9,174 in Draper versus $10,129 in Herriman.
Keep comparing
Draper vs Herriman impact fees — FAQ
- Which has higher impact fees, Draper or Herriman?
- Herriman, UT is higher. A single-family home pays about $17,137 per unit in Herriman versus $14,661 in Draper, UT — $2,476 (17%) more, as of 2026.
- How much more does it cost to build a home in Herriman than in Draper?
- About $2,476 more per single-family home — $17,137 in Herriman, UT versus $14,661 in Draper, UT, a difference of 17% in total development impact and connection fees.
- What's the difference between impact fees in Draper and Herriman for a single-family home?
- Draper, UT charges about $14,661 per single-family home ($5,487 impact + $9,174 water/sewer connection), while Herriman, UT charges about $17,137 ($7,008 impact + $10,129 connection). Figures are normalized from official sources for 2026.