Kent, WA Development Impact Fees (2026)
Normalized development impact fees, water & sewer connection (tap/SDC) fees, and mitigation fees for Kent, Washington — per dwelling unit, by category, with links to every official source.
What a single-family home pays in Kent
$8,570 total per unit across 3 fee categories. Fees charged per square foot assume a 2,500 sq ft home.
- Transportation / roads$6,109
- Fire / EMS$2,461
At $8,570, Kent is below the Washington tracked median of $19,206 — relatively affordable to build in.
Full fee schedule — single-family
Impact / development fees
| Fee (local term) | Basis | Amount | Source · effective |
|---|---|---|---|
Transportation / roads Transportation (Traffic) Impact Fee - Citywide — Primary single-family detached transportation impact fee, Citywide zone (ITE 210). Rate is 55% of maximum calculated rate per Ord. 4403. Verified against the City of Kent's own 2025 Traffic Impact Fees PDF (full-text extraction) and cross-confirmed via MRSC and web search. | per dwelling unit | $6,109 | City of Kent Public Works / Development Engineering Jan 1, 2025High |
Transportation / roads Transportation (Traffic) Impact Fee - Downtown zone — Mutually-exclusive geographic variant (Downtown service area). Excluded from total; the Citywide rate is the representative primary. Verified. alternative · not added to total | per dwelling unit | $5,009 | City of Kent Public Works / Development Engineering Jan 1, 2025High |
Transportation / roads Transportation (Traffic) Impact Fee - Midway zone — Mutually-exclusive geographic variant (Midway service area). Excluded from total; the Citywide rate is the representative primary. Verified. alternative · not added to total | per dwelling unit | $5,396 | City of Kent Public Works / Development Engineering Jan 1, 2025High |
Fire / EMS Fire Impact Fee - Single Family (representative 2,300 sf home) — Fire impact fee is assessed PER SQUARE FOOT ($1.07/sf single-family). This per-DU figure is derived for a representative 2,300 sf single-family detached home (2,300 x $1.07 = $2,461). Per RCW 82.02.100(2)/KCC 12.15.040(B), single-family homes with automatic fire sprinklers pay a reduced fee = 70% of this amount (30% discount). Ord. 4527 § 2 eff. 11-18-25. Code text verified verbatim. | per dwelling unit | $2,461 | City of Kent (Code Publishing) Nov 18, 2025High |
Fire / EMS Fire Impact Fee - Single Family (per square foot) — Source-of-truth per-square-foot fire impact fee rate for single-family (KCC 12.15.130). Excluded from total to avoid double-counting with the derived per-DU row above. Verified verbatim. alternative · not added to total | per sq ft | $1.07 | City of Kent (Code Publishing) Nov 18, 2025High |
Water & sewer connection fees
| Fee (local term) | Basis | Amount | Source · effective |
|---|---|---|---|
Sewer connection (tap / SDC) King County Sewer Capacity Charge - Single Family Medium (regional, 15-yr monthly) — REGIONAL King County charge (not a City of Kent fee), but a Kent builder connecting to the King County-served sewer system must pay it. $77.99 PER MONTH per RCE, billed quarterly for 15 YEARS (recurring, not one-time). SF medium (1,500-2,999 sf) = 1.0 RCE = $77.99/mo; small (<1,500 sf)=$63.17/mo; large (3,000+ sf)=$90.47/mo. unitBasis is 'other' = per RCE per month. Verified against King County WTD page. | $77.99 | King County Wastewater Treatment Division Jan 1, 2026High |
Full fee schedule — multifamily
Impact / development fees
| Fee (local term) | Basis | Amount | Source · effective |
|---|---|---|---|
Transportation / roads Transportation (Traffic) Impact Fee - Multifamily 1-2 story / townhome (Citywide) — Representative multifamily (1-2 story / townhome) Citywide rate (ITE 220). Other Citywide tiers: 3-10 story (ITE 221) $2,715.22; 3+ story (ITE 222) $2,221.54 per unit. Verified against the official PDF (full-text extraction). | per dwelling unit | $3,456 | City of Kent Public Works / Development Engineering Jan 1, 2025High |
Transportation / roads Transportation (Traffic) Impact Fee - Multifamily 3-10 story (Citywide) — Additional multifamily tier (3-10 story, ITE 221), Citywide. Excluded from total to avoid double-counting with the representative MF row. Verified. alternative · not added to total | per dwelling unit | $2,715 | City of Kent Public Works / Development Engineering Jan 1, 2025High |
Transportation / roads Transportation (Traffic) Impact Fee - Multifamily 3+ story (Citywide) — Additional multifamily tier (3+ story, ITE 222), Citywide. Excluded from total to avoid double-counting with the representative MF row. Verified. alternative · not added to total | per dwelling unit | $2,222 | City of Kent Public Works / Development Engineering Jan 1, 2025High |
Fire / EMS Fire Impact Fee - Multifamily (per square foot) — Multifamily fire impact fee assessed per square foot of building (KCC 12.15.130). Ord. 4527 § 2 eff. 11-18-25. Verified verbatim. | per sq ft | $2.42 | City of Kent (Code Publishing) Nov 18, 2025High |
Water & sewer connection fees
| Fee (local term) | Basis | Amount | Source · effective |
|---|---|---|---|
Sewer connection (tap / SDC) King County Sewer Capacity Charge - Multifamily 5+ units (regional, per unit, 15-yr monthly) — Regional King County sewer capacity charge for 5+ unit multifamily = 0.63 RCE/unit x $77.99 = $49.13/unit/month, billed for 15 years. ADU = 0.59 RCE = $46.01/mo. Excluded from total (regional, per-unit recurring). Math and RCE factor verified. alternative · not added to total | $49.13 | King County Wastewater Treatment Division Jan 1, 2026High |
Coverage & caveats
Kent levies four RCW 82.02 impact fees, codified in Kent City Code Title 12: school (12.13), transportation (12.14), fire (12.15), and parks (12.16). VERIFIED WITH EXACT FIGURES: (1) TRANSPORTATION — official City of Kent "Traffic Impact Fees" schedule effective 1/1/25-12/31/25 (3-zone system). Single-family detached = $6,109.26 citywide (PRIMARY); Downtown $5,008.94 and Midway $5,396.01 are mutually-exclusive geographic variants (excluded from total). Multifamily/townhome tiers by stories ($2,221.54-$3,455.75/unit), 2nd+ADU $3,054.63 (no TIF on 1st ADU). Rates are 55% of the maximum calculated rate (per Ord. 4403). (2) FIRE — KCC 12.15.130 (Revised 1/26, Ord. 4527 § 2, eff. 11-18-25): assessed PER SQUARE FOOT of building, NOT per unit: single-family $1.07/sf, multifamily $2.42/sf. A representative 2,300 sf single-family detached home = $2,461 (included as derived per-DU primary). Per RCW 82.02.100(2)/KCC 12.15.040(B), single-family with automatic fire sprinklers pays a reduced fee = 70% of the impact fee (i.e., 30% off); subsequent ADUs (after the first) are charged 50% of the SF fee per 12.15.040(A)(11). (3) SCHOOL — KCC 12.13.160 (Revised 2/25): the adopted fee is $0 for ALL three districts serving Kent (Kent SD #415, Federal Way #210, Highline #401), for single-family, multifamily, and multifamily studio. Statutory max cap for 2026 is $11,093 SF / $11,998 MF (KCC 12.13.170), but the actual collected fee is $0. (4) SEWER CAPACITY CHARGE — a regional King County charge (NOT a Kent fee) that a Kent builder connecting to the King County-served sewer system must pay: $77.99 per residential customer equivalent (RCE) per month for 2026 connections, billed quarterly for 15 years. Single-family medium home (1,500-2,999 sf) = 1.0 RCE = $77.99/mo; large (3,000+ sf) = 1.16 RCE = $90.47/mo; small (<1,500 sf) = 0.81 RCE = $63.17/mo; 5+ unit multifamily = 0.63 RCE/unit = $49.13/unit/mo; ADU = 0.59 RCE = $46.01/mo. CATEGORIES THAT DO NOT EXIST IN KENT: no police impact fee, no library impact fee, no drainage/stormwater impact fee, no general/capital-facilities impact fee, no open-space or affordable-housing impact fee. PARK impact fee — Kent DID adopt a park impact fee (KCC 12.16, Ord. 4398, eff. 3-16-21, based on the Jan-2021 City of Kent Park Impact Fee Study, CPI-escalated annually). It IS in effect and collected per dwelling unit, but the current dollar schedule (Exhibit 2 to the ordinance, as annually CPI-adjusted) is NOT published online — confirmed: the code text (KCC 12.16) references the dollar schedule only as the unpublished Exhibit 2, so NO park dollar amount is reported (no fabricated figure). Confirm current park impact fee with Kent Parks/ECD (253-856-5454). WATER/SEWER CONNECTION (local): Kent does not publish a flat water/sewer system development charge; local connection costs are actual-cost permit/inspection fees via Development Engineering, so omitted. codepublishing.com and kentwa.gov block plain HTTP clients (Akamai/403); the transportation PDF was verified via full text extraction through a rendering proxy and the codepublishing chapters were read via authenticated browser session. VERIFY: confirmed 15 of 15 rows; dropped 0; no park dollar figure was claimed (correctly omitted). excludeFromTotal corrections: none — all flags were already correct (Downtown/Midway geographic variants, non-representative MF story tiers, 2nd+ADU, the per-sqft fire duplicate, the duplicate MF school $0 row, and the per-unit regional sewer row are all properly excluded; representative per-DU primaries are SF transportation $6,109.26 + derived fire $2,461 + school $0, plus the regional recurring sewer charge — no double-counting).
Transportation figures are the exact official City of Kent 2025 schedule (verified against the city's own PDF via full-text extraction). Fire fee is per-square-foot of building area, not per dwelling unit; the per-DU fire row is derived for a representative 2,300 sf SFD (2,300 x $1.07 = $2,461). School fee is currently $0. Park impact fee exists and is collected but its current dollar amount is not publicly posted (lives in unpublished Exhibit 2) and is therefore not quantified. King County sewer capacity charge is a regional, recurring 15-year monthly charge, not a one-time City of Kent connection fee.
Sources
9 official sources · 14 high-confidence figures.
- 1City of Kent Traffic Impact Fees Schedule (Effective 1/1/25 - 12/31/25)City of Kent Public Works / Development Engineering · fee schedule · effective Jan 1, 2025 · retrieved Jun 17, 2026
- 2Kent City Code Chapter 12.14 Transportation Impact FeesCity of Kent (Code Publishing) · ordinance · effective Mar 16, 2021 · retrieved Jun 17, 2026
- 3Kent City Code Chapter 12.15 Fire Impact Fees (Base fee schedule 12.15.130, Revised 1/26, Ord. 4527)City of Kent (Code Publishing) · ordinance · effective Nov 18, 2025 · retrieved Jun 17, 2026
- 4Kent City Code Chapter 12.13 School Impact Fees (Base fee schedule 12.13.160, Revised 2/25)City of Kent (Code Publishing) · ordinance · effective Jan 1, 2025 · retrieved Jun 17, 2026
- 5Kent City Code Chapter 12.16 Park Impact Fees (Ord. 4398; dollar schedule in unpublished Exhibit 2)City of Kent (Code Publishing) · ordinance · effective Mar 16, 2021 · retrieved Jun 17, 2026
- 6About the King County Sewer Capacity Charge (2026 rates)King County Wastewater Treatment Division · municipal webpage · effective Jan 1, 2026 · retrieved Jun 17, 2026
- 7Comparison of Transportation Impact Fee Rates (2025) - Kent 3-zone footnoteMRSC (Municipal Research and Services Center of Washington) · government report · effective Jan 1, 2025 · retrieved Jun 17, 2026
- 8City of Kent Utility Services & Billing (water meter access, sewer, drainage rates)City of Kent · municipal webpage · effective Jan 1, 2026 · retrieved Jun 17, 2026
- 9City of Kent considers charging park impact fee to developers (Dec 2020 pre-adoption proposal)Kent Reporter · news article · effective Dec 1, 2020 · retrieved Jun 17, 2026
Kent impact fees — FAQ
- How much are development impact fees in Kent, WA for a single-family home?
- As of 2026-06-17, total development fees for a single-family detached home in Kent are about $8,570 per unit — roughly $8,570 in impact/development fees plus $0 in water/sewer connection fees. Figures are normalized from official sources; verify with the jurisdiction before relying on them.
- What are the impact fees per multifamily unit in Kent, WA?
- Total development fees for a multifamily unit in Kent are about $5,876 per unit as of 2026-06-17.
- Are impact fees in Kent the same as building permit fees?
- No. Impact fees (and water/sewer connection fees) fund off-site capital — roads, parks, schools, utilities — and are charged per new dwelling unit. Building permit and plan-review fees are separate and are not included here.
- How often do Kent's impact fees change?
- Most jurisdictions adopt fees by ordinance and escalate them annually (often by a construction cost index), with occasional mid-year updates. Always confirm the current adopted schedule with the jurisdiction. ImpactFeeAtlas last verified Kent on 2026-06-17.