ImpactFeeAtlasCompare fees

St. George, UT vs Tooele, UT: Development Impact Fees Compared (2026)

A single-family home pays about $33,173 in St. George vs $16,967 in Tooele St. George is $16,206 (96%) higher. Every figure below is normalized per dwelling unit by category, with links to each jurisdiction’s official sources.

City

St. George, UT

$33,173
Total per single-family home
impact + connection fees
$12,172
Impact / development fees
roads, parks, schools…
$21,001
Water & sewer connection
tap / capacity / SDC
Per multifamily unit
total fees / unit

Impact / development fees

Fee (local term)BasisAmountSource · effective
Parks & recreation
Parks & Recreation Impact Fee — Per dwelling unit, single-family. Confirmed verbatim on 4/21/21 schedule.
per dwelling unit$4,525City of St. George, Utah
Apr 21, 2021Highdated 2021
Transportation / roads
Transportation Impact Fee — Per dwelling unit, single-family. Confirmed verbatim.
per dwelling unit$2,188City of St. George, Utah
Apr 21, 2021Highdated 2021
Police
Police Impact Fee (Residential) — Residential single-family per unit. Confirmed verbatim.
per dwelling unit$95City of St. George, Utah
Apr 21, 2021Highdated 2021
Fire / EMS
Fire/EMS Impact Fee (Residential) — Residential single-family per unit (Fire/EMS column). Confirmed verbatim.
per dwelling unit$320City of St. George, Utah
Apr 21, 2021Highdated 2021
Drainage / stormwater
Storm Drain (Drainage) Impact Fee (Residential) — Residential single-family per unit (Drainage column). Confirmed verbatim.
per dwelling unit$781City of St. George, Utah
Apr 21, 2021Highdated 2021
General government / capital
Electrical (Power) Impact Fee - Residential single-phase 100 AMP — St. George is a municipal power provider; residential single-phase 100 AMP service (typical SF) used as representative. Additive. Confirmed verbatim.
per meter$3,893City of St. George, Utah
Apr 21, 2021Highdated 2021
General government / capital
Electrical (Power) Impact Fee - Residential single-phase 200 AMP — 200 AMP residential single-phase tier, mutually exclusive with 100 AMP. Excluded.
alternative · not added to total
per meter$4,809City of St. George, Utah
Apr 21, 2021Highdated 2021
General government / capital
Power Meter Fee - Underground — Power meter fee, underground service. Additive. Confirmed verbatim.
per meter$370City of St. George, Utah
Apr 21, 2021Highdated 2021

Water & sewer connection fees

Fee (local term)BasisAmountSource · effective
Water connection (tap / SDC)
Culinary Water Impact Fee (City) - base 0.8" meter — City culinary water impact fee, smallest/base residential 0.8" meter. Separate from and additive to WCWCD regional water impact fee.
per meter$1,996City of St. George, Utah
Apr 21, 2021Highdated 2021
Water connection (tap / SDC)
Culinary Water Impact Fee (City) - 1.0" meter — Larger meter tier, mutually exclusive with 0.8" base. Excluded.
alternative · not added to total
per meter$4,311City of St. George, Utah
Apr 21, 2021Highdated 2021
Water connection (tap / SDC)
Culinary Water Connection Fee (City) - 0.8" meter, water on lot — Additive water connection fee (on-lot), base 0.8" meter. If water not on lot it is $1,207.
per meter$223City of St. George, Utah
Apr 21, 2021Highdated 2021
Water connection (tap / SDC)
Culinary Water Connection Fee (City) - 0.8" meter, water NOT on lot — Alternative to on-lot connection fee. Excluded (mutually exclusive with on-lot $223).
alternative · not added to total
per meter$1,207City of St. George, Utah
Apr 21, 2021Highdated 2021
Sewer connection (tap / SDC)
Local & Regional Wastewater Impact Fee (City) - base 0.8" meter — Total wastewater impact fee for base 0.8" meter = $137 local + $1,379 regional. Confirmed verbatim.
per meter$1,516City of St. George, Utah
Apr 21, 2021Highdated 2021
Sewer connection (tap / SDC)
Local & Regional Wastewater Impact Fee (City) - 1.0" meter — Larger meter tier, mutually exclusive with 0.8" base. Excluded.
alternative · not added to total
per meter$3,274City of St. George, Utah
Apr 21, 2021Highdated 2021
Water connection (tap / SDC)
WCWCD Regional Water Impact Fee (separate district) — SEPARATE DISTRICT FEE: Washington County Water Conservancy District regional water impact fee, $17,266 per ERC for a 3/4"/5/8" residential meter. Confirmed verbatim on the WCWCD page. Paid by builders in St. George IN ADDITION to the city culinary water impact fee. Reduced fee available under Ultra Water Efficiency Standards (amount not published). Confidence medium and effectiveDate cleared because the district page publishes no specific effective date or resolution number.
per meter$17,266Washington County Water Conservancy District
Medium
St. Georgeimpact fees →
City

Tooele, UT

$16,967
Total per single-family home
impact + connection fees
$3,667
Impact / development fees
roads, parks, schools…
$13,300
Water & sewer connection
tap / capacity / SDC
$2,662
Per multifamily unit
total fees / unit

Impact / development fees

Fee (local term)BasisAmountSource · effective
Parks & recreation
Parks & Recreation Impact Fee — Single-Family Residential category includes detached, attached, townhouses, condos, duplexes. VERIFIED verbatim in fee schedule p.2 and Chapter 15.
per dwelling unit$3,194Tooele City Corporation
May 4, 2026High
Fire / EMS
Public Safety Impact Fee - Fire — Part of Public Safety impact fee. VERIFIED verbatim in fee schedule p.15 and Chapter 15.
per dwelling unit$256Tooele City Corporation
May 4, 2026High
Police
Public Safety Impact Fee - Police — Part of Public Safety impact fee. VERIFIED verbatim in fee schedule p.15 and Chapter 15.
per dwelling unit$217Tooele City Corporation
May 4, 2026High

Water & sewer connection fees

Fee (local term)BasisAmountSource · effective
Water connection (tap / SDC)
Culinary Water Impact Fee — Per ERC. Service area = entire Tooele City corporate boundary. No separate water tap/capacity fee beyond this. Same per-unit amount applies to multifamily (per ERC). VERIFIED verbatim in fee schedule p.26 and Chapter 15.
per dwelling unit$7,805Tooele City Corporation
May 4, 2026High
Sewer connection (tap / SDC)
Sanitary Sewer Impact Fee — Per ERU. Tooele City provides sewer directly (no separate district). Same per-unit amount applies to multifamily (per ERU). VERIFIED verbatim in fee schedule p.27 and Chapter 15.
per dwelling unit$4,731Tooele City Corporation
May 4, 2026High
Water connection (tap / SDC)
Water Connection Inspection Fee — One-time connection inspection, all meter sizes. Additive to the culinary water impact fee. VERIFIED verbatim in fee schedule p.26.
per meter$170Tooele City Corporation
May 4, 2026High
Sewer connection (tap / SDC)
Sewer Connection Inspection Fee — One-time sewer connection inspection. Additive to the sanitary sewer impact fee. VERIFIED verbatim in fee schedule p.27.
per meter$170Tooele City Corporation
May 4, 2026High
Water connection (tap / SDC)
Water Meter Cost (3/4" residential) — Equipment purchase cost for the standard 3/4-inch residential meter at new connection. Larger meters are mutually-exclusive variants (excluded below). VERIFIED verbatim in fee schedule p.26 (table shows 3/4" = $424).
per meter$424Tooele City Corporation
May 4, 2026High
Water connection (tap / SDC)
Water Meter Cost (1") — Alternative meter size variant; excluded from total (3/4" is the representative residential meter). VERIFIED verbatim in fee schedule p.26.
alternative · not added to total
per meter$484Tooele City Corporation
May 4, 2026High
Tooeleimpact fees →

What drives the difference

St. George’s $33,173 per single-family home is $16,206 (96%) above Tooele’s $16,967. The largest single difference is in water connection (tap / sdc): St. George charges about $19,485 there versus $8,399 in Tooele — a $11,086 swing that accounts for much of the overall gap. The two also differ in how much falls on water and sewer connection charges: $21,001 in St. George versus $13,300 in Tooele.

Keep comparing

St. George vs Tooele impact fees — FAQ

Which has higher impact fees, St. George or Tooele?
St. George, UT is higher. A single-family home pays about $33,173 per unit in St. George versus $16,967 in Tooele, UT — $16,206 (96%) more, as of 2026.
How much more does it cost to build a home in St. George than in Tooele?
About $16,206 more per single-family home — $33,173 in St. George, UT versus $16,967 in Tooele, UT, a difference of 96% in total development impact and connection fees.
What's the difference between impact fees in St. George and Tooele for a single-family home?
St. George, UT charges about $33,173 per single-family home ($12,172 impact + $21,001 water/sewer connection), while Tooele, UT charges about $16,967 ($3,667 impact + $13,300 connection). Figures are normalized from official sources for 2026.