ImpactFeeAtlasCompare fees

St. George, UT vs Star, ID: Development Impact Fees Compared (2026)

A single-family home pays about $33,173 in St. George vs $32,492 in Star St. George is $681 (2%) higher. Every figure below is normalized per dwelling unit by category, with links to each jurisdiction’s official sources.

City

St. George, UT

$33,173
Total per single-family home
impact + connection fees
$12,172
Impact / development fees
roads, parks, schools…
$21,001
Water & sewer connection
tap / capacity / SDC
Per multifamily unit
total fees / unit

Impact / development fees

Fee (local term)BasisAmountSource · effective
Parks & recreation
Parks & Recreation Impact Fee — Per dwelling unit, single-family. Confirmed verbatim on 4/21/21 schedule.
per dwelling unit$4,525City of St. George, Utah
Apr 21, 2021Highdated 2021
Transportation / roads
Transportation Impact Fee — Per dwelling unit, single-family. Confirmed verbatim.
per dwelling unit$2,188City of St. George, Utah
Apr 21, 2021Highdated 2021
Police
Police Impact Fee (Residential) — Residential single-family per unit. Confirmed verbatim.
per dwelling unit$95City of St. George, Utah
Apr 21, 2021Highdated 2021
Fire / EMS
Fire/EMS Impact Fee (Residential) — Residential single-family per unit (Fire/EMS column). Confirmed verbatim.
per dwelling unit$320City of St. George, Utah
Apr 21, 2021Highdated 2021
Drainage / stormwater
Storm Drain (Drainage) Impact Fee (Residential) — Residential single-family per unit (Drainage column). Confirmed verbatim.
per dwelling unit$781City of St. George, Utah
Apr 21, 2021Highdated 2021
General government / capital
Electrical (Power) Impact Fee - Residential single-phase 100 AMP — St. George is a municipal power provider; residential single-phase 100 AMP service (typical SF) used as representative. Additive. Confirmed verbatim.
per meter$3,893City of St. George, Utah
Apr 21, 2021Highdated 2021
General government / capital
Electrical (Power) Impact Fee - Residential single-phase 200 AMP — 200 AMP residential single-phase tier, mutually exclusive with 100 AMP. Excluded.
alternative · not added to total
per meter$4,809City of St. George, Utah
Apr 21, 2021Highdated 2021
General government / capital
Power Meter Fee - Underground — Power meter fee, underground service. Additive. Confirmed verbatim.
per meter$370City of St. George, Utah
Apr 21, 2021Highdated 2021

Water & sewer connection fees

Fee (local term)BasisAmountSource · effective
Water connection (tap / SDC)
Culinary Water Impact Fee (City) - base 0.8" meter — City culinary water impact fee, smallest/base residential 0.8" meter. Separate from and additive to WCWCD regional water impact fee.
per meter$1,996City of St. George, Utah
Apr 21, 2021Highdated 2021
Water connection (tap / SDC)
Culinary Water Impact Fee (City) - 1.0" meter — Larger meter tier, mutually exclusive with 0.8" base. Excluded.
alternative · not added to total
per meter$4,311City of St. George, Utah
Apr 21, 2021Highdated 2021
Water connection (tap / SDC)
Culinary Water Connection Fee (City) - 0.8" meter, water on lot — Additive water connection fee (on-lot), base 0.8" meter. If water not on lot it is $1,207.
per meter$223City of St. George, Utah
Apr 21, 2021Highdated 2021
Water connection (tap / SDC)
Culinary Water Connection Fee (City) - 0.8" meter, water NOT on lot — Alternative to on-lot connection fee. Excluded (mutually exclusive with on-lot $223).
alternative · not added to total
per meter$1,207City of St. George, Utah
Apr 21, 2021Highdated 2021
Sewer connection (tap / SDC)
Local & Regional Wastewater Impact Fee (City) - base 0.8" meter — Total wastewater impact fee for base 0.8" meter = $137 local + $1,379 regional. Confirmed verbatim.
per meter$1,516City of St. George, Utah
Apr 21, 2021Highdated 2021
Sewer connection (tap / SDC)
Local & Regional Wastewater Impact Fee (City) - 1.0" meter — Larger meter tier, mutually exclusive with 0.8" base. Excluded.
alternative · not added to total
per meter$3,274City of St. George, Utah
Apr 21, 2021Highdated 2021
Water connection (tap / SDC)
WCWCD Regional Water Impact Fee (separate district) — SEPARATE DISTRICT FEE: Washington County Water Conservancy District regional water impact fee, $17,266 per ERC for a 3/4"/5/8" residential meter. Confirmed verbatim on the WCWCD page. Paid by builders in St. George IN ADDITION to the city culinary water impact fee. Reduced fee available under Ultra Water Efficiency Standards (amount not published). Confidence medium and effectiveDate cleared because the district page publishes no specific effective date or resolution number.
per meter$17,266Washington County Water Conservancy District
Medium
St. Georgeimpact fees →
City

Star, ID

$32,492
Total per single-family home
impact + connection fees
$21,042
Impact / development fees
roads, parks, schools…
$11,450
Water & sewer connection
tap / capacity / SDC
Per multifamily unit
total fees / unit

Impact / development fees

Fee (local term)BasisAmountSource · effective
Transportation / roads
ACHD Transportation Impact Fee (Single Family Detached) — VERIFIED. Transportation/road impact fee levied by the Ada County Highway District (ACHD), a SEPARATE district, collected at the City of Star building permit. ACHD Ordinance No. 254, effective March 1, 2026 ($5,803/single-family home), single service area model. Confirmed on the City of Star fee page (verbatim) and corroborated by ACHD's adoption notice (Meridian-hosted PDF: 'Single Family : $5803.00') and KIVI/KTVB reporting.
per dwelling unit$5,803City of Star, Idaho
Mar 1, 2026High
Transportation / roads
Highway District No. 4 (Canyon County) Impact Fee — VERIFIED on City of Star fee page. MUTUALLY EXCLUSIVE alternative to the ACHD transportation fee. Star straddles the Ada/Canyon county line; parcels in the Canyon County portion pay Highway District No. 4 ($5,050) INSTEAD OF the ACHD fee ($5,803). ACHD (Ada County) treated as representative/primary; this Canyon County variant excludeFromTotal=true (correct).
alternative · not added to total
per dwelling unit$5,050City of Star, Idaho
High
Fire / EMS
Star Fire Impact Fee — VERIFIED on City of Star fee page (verbatim). Fire impact fee levied by the City of Star, per dwelling unit.
per dwelling unit$2,152City of Star, Idaho
High
Parks & recreation
Star Parks Impact Fee — VERIFIED on City of Star fee page (verbatim). Parks/recreation impact fee levied by the City of Star, per dwelling unit.
per dwelling unit$4,696City of Star, Idaho
High
Police
Star Police Impact Fee — VERIFIED on City of Star fee page (verbatim). Police impact fee levied by the City of Star, per dwelling unit.
per dwelling unit$681City of Star, Idaho
High
Police
Public Safety Mitigation Fee - Police — VERIFIED on City of Star fee page (verbatim). Police 'Public Safety Mitigation Fee' charged by the City of Star in addition to the Police Impact Fee. Additive mitigation/exaction (per dwelling unit).
per dwelling unit$3,360City of Star, Idaho
High
Fire / EMS
Public Safety Mitigation Fee - Fire — VERIFIED on City of Star fee page (verbatim). Fire 'Public Safety Mitigation Fee' charged by the City of Star in addition to the Fire Impact Fee. Additive mitigation/exaction (per dwelling unit).
per dwelling unit$3,600City of Star, Idaho
High
General government / capital
Ada County Impact Fees (Jail, EMS, Coroner) — VERIFIED on City of Star fee page (verbatim). Ada County (SEPARATE county government) impact fee covering Jail, EMS, and Coroner capital facilities, collected at the City of Star permit, per single-family dwelling unit.
per dwelling unit$750City of Star, Idaho
High

Water & sewer connection fees

Fee (local term)BasisAmountSource · effective
Water connection (tap / SDC)
Water Connection Fee (per EDU) — VERIFIED in Star Sewer & Water District Residential Permit Application PDF (Revised 3/31/2026): 'Water Connection Fee Amt. Paid $2,000.00 PER EDU ... $2,000.00'. Water connection/capacity fee charged by the SWD (SEPARATE special district providing all water/sewer in Star); 1 SFD = 1 EDU.
per meter$2,000Star Sewer & Water District
Mar 31, 2026High
Water connection (tap / SDC)
Water Meter Lease Fee (3/4" meter) — VERIFIED in SWD Residential Permit Application PDF (Revised 3/31/2026): 'Water Meter Lease Fee Amt. Paid ¾" Meter ... $950.00'. One-time water meter (lease) fee for the standard residential 3/4" meter (representative meter size), additive to the water connection fee.
per meter$950Star Sewer & Water District
Mar 31, 2026High
Sewer connection (tap / SDC)
Sewer Connection Fee (per EDU) — VERIFIED in SWD Residential Permit Application PDF (Revised 3/31/2026): 'Sewer Connection Fee Amt Paid $8,500.00 PER EDU ... $8,500.00'. Sewer connection/capacity fee, $8,500 per EDU (1 SFD = 1 EDU). PDF total water+meter+sewer = $11,450.00 ($2,000 + $950 + $8,500), confirmed.
per meter$8,500Star Sewer & Water District
Mar 31, 2026High
Starimpact fees →

What drives the difference

St. George’s $33,173 per single-family home is $681 (2%) above Star’s $32,492. The largest single difference is in water connection (tap / sdc): St. George charges about $19,485 there versus $2,950 in Star — a $16,535 swing that accounts for much of the overall gap. The two also differ in how much falls on water and sewer connection charges: $21,001 in St. George versus $11,450 in Star.

Keep comparing

St. George vs Star impact fees — FAQ

Which has higher impact fees, St. George or Star?
St. George, UT is higher. A single-family home pays about $33,173 per unit in St. George versus $32,492 in Star, ID — $681 (2%) more, as of 2026.
How much more does it cost to build a home in St. George than in Star?
About $681 more per single-family home — $33,173 in St. George, UT versus $32,492 in Star, ID, a difference of 2% in total development impact and connection fees.
What's the difference between impact fees in St. George and Star for a single-family home?
St. George, UT charges about $33,173 per single-family home ($12,172 impact + $21,001 water/sewer connection), while Star, ID charges about $32,492 ($21,042 impact + $11,450 connection). Figures are normalized from official sources for 2026.