ImpactFeeAtlasCompare fees

Spanish Fork, UT vs St. George, UT: Development Impact Fees Compared (2026)

A single-family home pays about $26,834 in Spanish Fork vs $33,173 in St. George St. George is $6,339 (24%) higher. Every figure below is normalized per dwelling unit by category, with links to each jurisdiction’s official sources.

City

Spanish Fork, UT

$26,834
Total per single-family home
impact + connection fees
$17,222
Impact / development fees
roads, parks, schools…
$9,612
Water & sewer connection
tap / capacity / SDC
Per multifamily unit
total fees / unit

Impact / development fees

Fee (local term)BasisAmountSource · effective
Transportation / roads
Transportation Impact Fee — Currently effective (2026 column), re-confirmed against city table 2026-06-17. Charged at building permit issuance; based on cost per peak trip per ITE land-use trip rates. Unchanged from prior 7/2024-2025 schedule ($1,992.92).
per dwelling unit$1,993Spanish Fork City, Public Works / Engineering Division
Jul 1, 2025High
Parks & recreation
Parks, Trails & Recreation Impact Fee — Currently effective (2026 column), re-confirmed 2026-06-17. Covers park, trail and recreation facilities. Prior 7/2024-2025 was $4,795.00.
per dwelling unit$4,896Spanish Fork City, Public Works / Engineering Division
Jul 1, 2025High
Public safety
Public Safety Impact Fee (combined police & fire) — Currently effective (2026 column), re-confirmed 2026-06-17. Single combined public-safety fee (police + fire); residential per-capita based. Prior 7/2024-2025 was $675.76. No separate police or fire impact fee in Spanish Fork.
per dwelling unit$1,106Spanish Fork City, Public Works / Engineering Division
Jul 1, 2025High
Drainage / stormwater
Storm Water Impact Fee — Currently effective (2026 column), re-confirmed 2026-06-17, base storm water. A reduced 'Storm w/LID' (low-impact-development) alternative of $1,241.97 applies if LID stormwater controls are used; that variant is mutually exclusive and excluded from total. Prior 7/2024-2025 base was $2,337.68.
per dwelling unit$1,253Spanish Fork City, Public Works / Engineering Division
Jul 1, 2025High
Drainage / stormwater
Storm Water Impact Fee w/ LID (alternative) — Mutually exclusive alternative to base Storm Water — applies only when low-impact-development (LID) stormwater controls are installed. Correctly excluded from total to avoid double counting (verified 2026-06-17). Prior 7/2024-2025 was $1,445.83.
alternative · not added to total
per dwelling unit$1,242Spanish Fork City, Public Works / Engineering Division
Jul 1, 2025High
Other
Power (Electric) Impact Fee — Currently effective (2026 column), re-confirmed 2026-06-17. Spanish Fork is a full-service municipal electric utility; power impact fee for base residential single-phase 120/240V 100A/24kW service. Prior 7/2024-2025 was $2,071.38.
per dwelling unit$2,137Spanish Fork City, Public Works / Engineering Division
Jul 1, 2025High
General government / capital
Building Permit & Hookup (Connection) Fee — Currently effective (2026 column), re-confirmed 2026-06-17. City-published bundled line combining the building permit (a non-impact regulatory fee) and utility hookup/connection charges; the city does not itemize separate water-tap vs sewer-tap dollar amounts publicly. Prior 7/2024-2025 was $5,224.19. Confidence medium because it aggregates a permit fee with connection sub-fees.
per dwelling unit$5,837Spanish Fork City, Public Works / Engineering Division
Jul 1, 2025Medium
General government / capital
Total Impact + Permit + Hookup Fees (informational total) — City-published all-in total for the 2026 schedule (impact fees subtotal $20,997.39 + Building Permit & Hookup $5,836.77). Correctly marked excludeFromTotal to avoid double-counting the individual rows above (verified 2026-06-17; sum of included rows equals this figure). Prior 7/2024-2025 all-in total was $25,254.93.
alternative · not added to total
per dwelling unit$26,834Spanish Fork City, Public Works / Engineering Division
Jul 1, 2025High

Water & sewer connection fees

Fee (local term)BasisAmountSource · effective
Water connection (tap / SDC)
Drinking Water Impact Fee — Currently effective (2026 column), re-confirmed 2026-06-17. Levied by Spanish Fork City (full-service municipal water utility, not a separate district). ERC based on a 1-inch residential connection. Prior 7/2024-2025 was $1,865.00. Separate from the bundled Building Permit & Hookup Fee.
per dwelling unit$2,261Spanish Fork City, Public Works / Engineering Division
Jul 1, 2025High
Sewer connection (tap / SDC)
Wastewater (Sewer) Impact Fee — Currently effective (2026 column), re-confirmed 2026-06-17. Levied by Spanish Fork City (municipal wastewater utility). ERU based on ~166 gpd domestic production. Prior 7/2024-2025 was $4,215.00.
per dwelling unit$5,764Spanish Fork City, Public Works / Engineering Division
Jul 1, 2025High
Water connection (tap / SDC)
Pressurized Irrigation (Secondary Water) Impact Fee — Currently effective (2026 column), re-confirmed 2026-06-17. Spanish Fork provides a separate pressurized (secondary) irrigation system; this fee is ADDITIVE to drinking water. Prior 7/2024-2025 was $2,078.00. Excludes the in-kind water-rights dedication required at final plat.
per dwelling unit$1,588Spanish Fork City, Public Works / Engineering Division
Jul 1, 2025High
Spanish Forkimpact fees →
City

St. George, UT

$33,173
Total per single-family home
impact + connection fees
$12,172
Impact / development fees
roads, parks, schools…
$21,001
Water & sewer connection
tap / capacity / SDC
Per multifamily unit
total fees / unit

Impact / development fees

Fee (local term)BasisAmountSource · effective
Parks & recreation
Parks & Recreation Impact Fee — Per dwelling unit, single-family. Confirmed verbatim on 4/21/21 schedule.
per dwelling unit$4,525City of St. George, Utah
Apr 21, 2021Highdated 2021
Transportation / roads
Transportation Impact Fee — Per dwelling unit, single-family. Confirmed verbatim.
per dwelling unit$2,188City of St. George, Utah
Apr 21, 2021Highdated 2021
Police
Police Impact Fee (Residential) — Residential single-family per unit. Confirmed verbatim.
per dwelling unit$95City of St. George, Utah
Apr 21, 2021Highdated 2021
Fire / EMS
Fire/EMS Impact Fee (Residential) — Residential single-family per unit (Fire/EMS column). Confirmed verbatim.
per dwelling unit$320City of St. George, Utah
Apr 21, 2021Highdated 2021
Drainage / stormwater
Storm Drain (Drainage) Impact Fee (Residential) — Residential single-family per unit (Drainage column). Confirmed verbatim.
per dwelling unit$781City of St. George, Utah
Apr 21, 2021Highdated 2021
General government / capital
Electrical (Power) Impact Fee - Residential single-phase 100 AMP — St. George is a municipal power provider; residential single-phase 100 AMP service (typical SF) used as representative. Additive. Confirmed verbatim.
per meter$3,893City of St. George, Utah
Apr 21, 2021Highdated 2021
General government / capital
Electrical (Power) Impact Fee - Residential single-phase 200 AMP — 200 AMP residential single-phase tier, mutually exclusive with 100 AMP. Excluded.
alternative · not added to total
per meter$4,809City of St. George, Utah
Apr 21, 2021Highdated 2021
General government / capital
Power Meter Fee - Underground — Power meter fee, underground service. Additive. Confirmed verbatim.
per meter$370City of St. George, Utah
Apr 21, 2021Highdated 2021

Water & sewer connection fees

Fee (local term)BasisAmountSource · effective
Water connection (tap / SDC)
Culinary Water Impact Fee (City) - base 0.8" meter — City culinary water impact fee, smallest/base residential 0.8" meter. Separate from and additive to WCWCD regional water impact fee.
per meter$1,996City of St. George, Utah
Apr 21, 2021Highdated 2021
Water connection (tap / SDC)
Culinary Water Impact Fee (City) - 1.0" meter — Larger meter tier, mutually exclusive with 0.8" base. Excluded.
alternative · not added to total
per meter$4,311City of St. George, Utah
Apr 21, 2021Highdated 2021
Water connection (tap / SDC)
Culinary Water Connection Fee (City) - 0.8" meter, water on lot — Additive water connection fee (on-lot), base 0.8" meter. If water not on lot it is $1,207.
per meter$223City of St. George, Utah
Apr 21, 2021Highdated 2021
Water connection (tap / SDC)
Culinary Water Connection Fee (City) - 0.8" meter, water NOT on lot — Alternative to on-lot connection fee. Excluded (mutually exclusive with on-lot $223).
alternative · not added to total
per meter$1,207City of St. George, Utah
Apr 21, 2021Highdated 2021
Sewer connection (tap / SDC)
Local & Regional Wastewater Impact Fee (City) - base 0.8" meter — Total wastewater impact fee for base 0.8" meter = $137 local + $1,379 regional. Confirmed verbatim.
per meter$1,516City of St. George, Utah
Apr 21, 2021Highdated 2021
Sewer connection (tap / SDC)
Local & Regional Wastewater Impact Fee (City) - 1.0" meter — Larger meter tier, mutually exclusive with 0.8" base. Excluded.
alternative · not added to total
per meter$3,274City of St. George, Utah
Apr 21, 2021Highdated 2021
Water connection (tap / SDC)
WCWCD Regional Water Impact Fee (separate district) — SEPARATE DISTRICT FEE: Washington County Water Conservancy District regional water impact fee, $17,266 per ERC for a 3/4"/5/8" residential meter. Confirmed verbatim on the WCWCD page. Paid by builders in St. George IN ADDITION to the city culinary water impact fee. Reduced fee available under Ultra Water Efficiency Standards (amount not published). Confidence medium and effectiveDate cleared because the district page publishes no specific effective date or resolution number.
per meter$17,266Washington County Water Conservancy District
Medium
St. Georgeimpact fees →

What drives the difference

St. George’s $33,173 per single-family home is $6,339 (24%) above Spanish Fork’s $26,834. The largest single difference is in water connection (tap / sdc): St. George charges about $19,485 there versus $3,849 in Spanish Fork — a $15,636 swing that accounts for much of the overall gap. The two also differ in how much falls on water and sewer connection charges: $9,612 in Spanish Fork versus $21,001 in St. George.

Keep comparing

Spanish Fork vs St. George impact fees — FAQ

Which has higher impact fees, Spanish Fork or St. George?
St. George, UT is higher. A single-family home pays about $33,173 per unit in St. George versus $26,834 in Spanish Fork, UT — $6,339 (24%) more, as of 2026.
How much more does it cost to build a home in St. George than in Spanish Fork?
About $6,339 more per single-family home — $33,173 in St. George, UT versus $26,834 in Spanish Fork, UT, a difference of 24% in total development impact and connection fees.
What's the difference between impact fees in Spanish Fork and St. George for a single-family home?
Spanish Fork, UT charges about $26,834 per single-family home ($17,222 impact + $9,612 water/sewer connection), while St. George, UT charges about $33,173 ($12,172 impact + $21,001 connection). Figures are normalized from official sources for 2026.