ImpactFeeAtlasCompare fees

Salt Lake City, UT vs Tooele, UT: Development Impact Fees Compared (2026)

A single-family home pays about $8,248 in Salt Lake City vs $16,967 in Tooele Tooele is $8,719 (106%) higher. Every figure below is normalized per dwelling unit by category, with links to each jurisdiction’s official sources.

City

Salt Lake City, UT

$8,248
Total per single-family home
impact + connection fees
$5,832
Impact / development fees
roads, parks, schools…
$2,416
Water & sewer connection
tap / capacity / SDC
$3,959
Per multifamily unit
total fees / unit

Impact / development fees

Fee (local term)BasisAmountSource · effective
Fire / EMS
Fire impact fee — Impact Fees table, Single Family column. City Code 18.98.160. Confirmed in adopted CFS PDF and 2016 General Fund IFFP/IFA.
per dwelling unit$171Salt Lake City Corporation
Jan 29, 2026High
Parks & recreation
Parks & Public Lands impact fee — Single Family column. Parks impact fee applies to residential only ($0 for office/industrial/commercial). Confirmed in adopted CFS PDF and 2016 IFFP/IFA.
per dwelling unit$5,173Salt Lake City Corporation
Jan 29, 2026High
Police
Police impact fee — Single Family column. City Code 18.98.160. Confirmed in adopted CFS PDF and 2016 IFFP/IFA.
per dwelling unit$59Salt Lake City Corporation
Jan 29, 2026High
Transportation / roads
Transportation/roads impact fee — Single Family column. City Code 18.98.090. Confirmed in adopted CFS PDF and in the 2020 Transportation IFFP/IFA ('Single family house ... dwelling $429').
per dwelling unit$429Salt Lake City Corporation
Jan 29, 2026High
Drainage / stormwater
Storm water / drainage impact fee — One-time drainage/storm-water impact fee: $374 per 1/4 acre, rounded up (§17.81.400). A typical single-family lot under 1/4 acre rounds up to one increment = $374. Parcel/area-based, not strictly per unit. Confirmed in adopted CFS PDF (Impact Fees table and Storm Water section). unitBasis per_acre is the closest enum to the actual per-1/4-acre basis.
per acre$374Salt Lake City Corporation
Jan 29, 2026High

Water & sewer connection fees

Fee (local term)BasisAmountSource · effective
Water connection (tap / SDC)
Water connection fee (single-family, 3/4-inch meter, City rate) — City Connection Fee for a residential single-family 3/4-inch meter (base residential meter), §17.16.040. County Connection Fee for the same is $1,952. Meter hardware & installation billed separately at actual cost (not included). Confirmed in adopted CFS PDF Water Connection Fees table.
per meter$1,871Salt Lake City Corporation
Jan 29, 2026High
Water connection (tap / SDC)
Water connection fee (single-family, 3/4-inch, County rate) — alternate — County Connection Fee variant for the 3/4-inch SF meter; applies to SLC Public Utilities customers in unincorporated/county service area, not inside city limits. Excluded as mutually-exclusive alternate to the City rate. Confirmed in adopted CFS PDF.
alternative · not added to total
per meter$1,952Salt Lake City Corporation
Jan 29, 2026High
Water connection (tap / SDC)
Water connection fee (single-family, 1-inch meter, City rate) — alternate tier — City Connection Fee for a 1-inch single-family meter; larger-meter alternate to the base 3/4-inch. County rate $3,494. Excluded as alternate meter-size tier. Confirmed in adopted CFS PDF.
alternative · not added to total
per meter$3,297Salt Lake City Corporation
Jan 29, 2026High
Sewer connection (tap / SDC)
Sanitary sewer connection fee (single dwelling) — Sanitary sewer connection fee on new development, residential single dwelling, §17.72.030. Includes condominiums and twin homes. Confirmed in adopted CFS PDF, 'Connection fees on new development property'.
per dwelling unit$545Salt Lake City Corporation
Jan 29, 2026High
Salt Lake Cityimpact fees →
City

Tooele, UT

$16,967
Total per single-family home
impact + connection fees
$3,667
Impact / development fees
roads, parks, schools…
$13,300
Water & sewer connection
tap / capacity / SDC
$2,662
Per multifamily unit
total fees / unit

Impact / development fees

Fee (local term)BasisAmountSource · effective
Parks & recreation
Parks & Recreation Impact Fee — Single-Family Residential category includes detached, attached, townhouses, condos, duplexes. VERIFIED verbatim in fee schedule p.2 and Chapter 15.
per dwelling unit$3,194Tooele City Corporation
May 4, 2026High
Fire / EMS
Public Safety Impact Fee - Fire — Part of Public Safety impact fee. VERIFIED verbatim in fee schedule p.15 and Chapter 15.
per dwelling unit$256Tooele City Corporation
May 4, 2026High
Police
Public Safety Impact Fee - Police — Part of Public Safety impact fee. VERIFIED verbatim in fee schedule p.15 and Chapter 15.
per dwelling unit$217Tooele City Corporation
May 4, 2026High

Water & sewer connection fees

Fee (local term)BasisAmountSource · effective
Water connection (tap / SDC)
Culinary Water Impact Fee — Per ERC. Service area = entire Tooele City corporate boundary. No separate water tap/capacity fee beyond this. Same per-unit amount applies to multifamily (per ERC). VERIFIED verbatim in fee schedule p.26 and Chapter 15.
per dwelling unit$7,805Tooele City Corporation
May 4, 2026High
Sewer connection (tap / SDC)
Sanitary Sewer Impact Fee — Per ERU. Tooele City provides sewer directly (no separate district). Same per-unit amount applies to multifamily (per ERU). VERIFIED verbatim in fee schedule p.27 and Chapter 15.
per dwelling unit$4,731Tooele City Corporation
May 4, 2026High
Water connection (tap / SDC)
Water Connection Inspection Fee — One-time connection inspection, all meter sizes. Additive to the culinary water impact fee. VERIFIED verbatim in fee schedule p.26.
per meter$170Tooele City Corporation
May 4, 2026High
Sewer connection (tap / SDC)
Sewer Connection Inspection Fee — One-time sewer connection inspection. Additive to the sanitary sewer impact fee. VERIFIED verbatim in fee schedule p.27.
per meter$170Tooele City Corporation
May 4, 2026High
Water connection (tap / SDC)
Water Meter Cost (3/4" residential) — Equipment purchase cost for the standard 3/4-inch residential meter at new connection. Larger meters are mutually-exclusive variants (excluded below). VERIFIED verbatim in fee schedule p.26 (table shows 3/4" = $424).
per meter$424Tooele City Corporation
May 4, 2026High
Water connection (tap / SDC)
Water Meter Cost (1") — Alternative meter size variant; excluded from total (3/4" is the representative residential meter). VERIFIED verbatim in fee schedule p.26.
alternative · not added to total
per meter$484Tooele City Corporation
May 4, 2026High
Tooeleimpact fees →

What drives the difference

Tooele’s $16,967 per single-family home is $8,719 (106%) above Salt Lake City’s $8,248. The largest single difference is in water connection (tap / sdc): Tooele charges about $8,399 there versus $1,871 in Salt Lake City — a $6,528 swing that accounts for much of the overall gap. The two also differ in how much falls on water and sewer connection charges: $2,416 in Salt Lake City versus $13,300 in Tooele.

Keep comparing

Salt Lake City vs Tooele impact fees — FAQ

Which has higher impact fees, Salt Lake City or Tooele?
Tooele, UT is higher. A single-family home pays about $16,967 per unit in Tooele versus $8,248 in Salt Lake City, UT — $8,719 (106%) more, as of 2026.
How much more does it cost to build a home in Tooele than in Salt Lake City?
About $8,719 more per single-family home — $16,967 in Tooele, UT versus $8,248 in Salt Lake City, UT, a difference of 106% in total development impact and connection fees.
What's the difference between impact fees in Salt Lake City and Tooele for a single-family home?
Salt Lake City, UT charges about $8,248 per single-family home ($5,832 impact + $2,416 water/sewer connection), while Tooele, UT charges about $16,967 ($3,667 impact + $13,300 connection). Figures are normalized from official sources for 2026.