ImpactFeeAtlasCompare fees

Salt Lake City, UT vs St. George, UT: Development Impact Fees Compared (2026)

A single-family home pays about $8,248 in Salt Lake City vs $33,173 in St. George St. George is $24,925 (302%) higher. Every figure below is normalized per dwelling unit by category, with links to each jurisdiction’s official sources.

City

Salt Lake City, UT

$8,248
Total per single-family home
impact + connection fees
$5,832
Impact / development fees
roads, parks, schools…
$2,416
Water & sewer connection
tap / capacity / SDC
$3,959
Per multifamily unit
total fees / unit

Impact / development fees

Fee (local term)BasisAmountSource · effective
Fire / EMS
Fire impact fee — Impact Fees table, Single Family column. City Code 18.98.160. Confirmed in adopted CFS PDF and 2016 General Fund IFFP/IFA.
per dwelling unit$171Salt Lake City Corporation
Jan 29, 2026High
Parks & recreation
Parks & Public Lands impact fee — Single Family column. Parks impact fee applies to residential only ($0 for office/industrial/commercial). Confirmed in adopted CFS PDF and 2016 IFFP/IFA.
per dwelling unit$5,173Salt Lake City Corporation
Jan 29, 2026High
Police
Police impact fee — Single Family column. City Code 18.98.160. Confirmed in adopted CFS PDF and 2016 IFFP/IFA.
per dwelling unit$59Salt Lake City Corporation
Jan 29, 2026High
Transportation / roads
Transportation/roads impact fee — Single Family column. City Code 18.98.090. Confirmed in adopted CFS PDF and in the 2020 Transportation IFFP/IFA ('Single family house ... dwelling $429').
per dwelling unit$429Salt Lake City Corporation
Jan 29, 2026High
Drainage / stormwater
Storm water / drainage impact fee — One-time drainage/storm-water impact fee: $374 per 1/4 acre, rounded up (§17.81.400). A typical single-family lot under 1/4 acre rounds up to one increment = $374. Parcel/area-based, not strictly per unit. Confirmed in adopted CFS PDF (Impact Fees table and Storm Water section). unitBasis per_acre is the closest enum to the actual per-1/4-acre basis.
per acre$374Salt Lake City Corporation
Jan 29, 2026High

Water & sewer connection fees

Fee (local term)BasisAmountSource · effective
Water connection (tap / SDC)
Water connection fee (single-family, 3/4-inch meter, City rate) — City Connection Fee for a residential single-family 3/4-inch meter (base residential meter), §17.16.040. County Connection Fee for the same is $1,952. Meter hardware & installation billed separately at actual cost (not included). Confirmed in adopted CFS PDF Water Connection Fees table.
per meter$1,871Salt Lake City Corporation
Jan 29, 2026High
Water connection (tap / SDC)
Water connection fee (single-family, 3/4-inch, County rate) — alternate — County Connection Fee variant for the 3/4-inch SF meter; applies to SLC Public Utilities customers in unincorporated/county service area, not inside city limits. Excluded as mutually-exclusive alternate to the City rate. Confirmed in adopted CFS PDF.
alternative · not added to total
per meter$1,952Salt Lake City Corporation
Jan 29, 2026High
Water connection (tap / SDC)
Water connection fee (single-family, 1-inch meter, City rate) — alternate tier — City Connection Fee for a 1-inch single-family meter; larger-meter alternate to the base 3/4-inch. County rate $3,494. Excluded as alternate meter-size tier. Confirmed in adopted CFS PDF.
alternative · not added to total
per meter$3,297Salt Lake City Corporation
Jan 29, 2026High
Sewer connection (tap / SDC)
Sanitary sewer connection fee (single dwelling) — Sanitary sewer connection fee on new development, residential single dwelling, §17.72.030. Includes condominiums and twin homes. Confirmed in adopted CFS PDF, 'Connection fees on new development property'.
per dwelling unit$545Salt Lake City Corporation
Jan 29, 2026High
Salt Lake Cityimpact fees →
City

St. George, UT

$33,173
Total per single-family home
impact + connection fees
$12,172
Impact / development fees
roads, parks, schools…
$21,001
Water & sewer connection
tap / capacity / SDC
Per multifamily unit
total fees / unit

Impact / development fees

Fee (local term)BasisAmountSource · effective
Parks & recreation
Parks & Recreation Impact Fee — Per dwelling unit, single-family. Confirmed verbatim on 4/21/21 schedule.
per dwelling unit$4,525City of St. George, Utah
Apr 21, 2021Highdated 2021
Transportation / roads
Transportation Impact Fee — Per dwelling unit, single-family. Confirmed verbatim.
per dwelling unit$2,188City of St. George, Utah
Apr 21, 2021Highdated 2021
Police
Police Impact Fee (Residential) — Residential single-family per unit. Confirmed verbatim.
per dwelling unit$95City of St. George, Utah
Apr 21, 2021Highdated 2021
Fire / EMS
Fire/EMS Impact Fee (Residential) — Residential single-family per unit (Fire/EMS column). Confirmed verbatim.
per dwelling unit$320City of St. George, Utah
Apr 21, 2021Highdated 2021
Drainage / stormwater
Storm Drain (Drainage) Impact Fee (Residential) — Residential single-family per unit (Drainage column). Confirmed verbatim.
per dwelling unit$781City of St. George, Utah
Apr 21, 2021Highdated 2021
General government / capital
Electrical (Power) Impact Fee - Residential single-phase 100 AMP — St. George is a municipal power provider; residential single-phase 100 AMP service (typical SF) used as representative. Additive. Confirmed verbatim.
per meter$3,893City of St. George, Utah
Apr 21, 2021Highdated 2021
General government / capital
Electrical (Power) Impact Fee - Residential single-phase 200 AMP — 200 AMP residential single-phase tier, mutually exclusive with 100 AMP. Excluded.
alternative · not added to total
per meter$4,809City of St. George, Utah
Apr 21, 2021Highdated 2021
General government / capital
Power Meter Fee - Underground — Power meter fee, underground service. Additive. Confirmed verbatim.
per meter$370City of St. George, Utah
Apr 21, 2021Highdated 2021

Water & sewer connection fees

Fee (local term)BasisAmountSource · effective
Water connection (tap / SDC)
Culinary Water Impact Fee (City) - base 0.8" meter — City culinary water impact fee, smallest/base residential 0.8" meter. Separate from and additive to WCWCD regional water impact fee.
per meter$1,996City of St. George, Utah
Apr 21, 2021Highdated 2021
Water connection (tap / SDC)
Culinary Water Impact Fee (City) - 1.0" meter — Larger meter tier, mutually exclusive with 0.8" base. Excluded.
alternative · not added to total
per meter$4,311City of St. George, Utah
Apr 21, 2021Highdated 2021
Water connection (tap / SDC)
Culinary Water Connection Fee (City) - 0.8" meter, water on lot — Additive water connection fee (on-lot), base 0.8" meter. If water not on lot it is $1,207.
per meter$223City of St. George, Utah
Apr 21, 2021Highdated 2021
Water connection (tap / SDC)
Culinary Water Connection Fee (City) - 0.8" meter, water NOT on lot — Alternative to on-lot connection fee. Excluded (mutually exclusive with on-lot $223).
alternative · not added to total
per meter$1,207City of St. George, Utah
Apr 21, 2021Highdated 2021
Sewer connection (tap / SDC)
Local & Regional Wastewater Impact Fee (City) - base 0.8" meter — Total wastewater impact fee for base 0.8" meter = $137 local + $1,379 regional. Confirmed verbatim.
per meter$1,516City of St. George, Utah
Apr 21, 2021Highdated 2021
Sewer connection (tap / SDC)
Local & Regional Wastewater Impact Fee (City) - 1.0" meter — Larger meter tier, mutually exclusive with 0.8" base. Excluded.
alternative · not added to total
per meter$3,274City of St. George, Utah
Apr 21, 2021Highdated 2021
Water connection (tap / SDC)
WCWCD Regional Water Impact Fee (separate district) — SEPARATE DISTRICT FEE: Washington County Water Conservancy District regional water impact fee, $17,266 per ERC for a 3/4"/5/8" residential meter. Confirmed verbatim on the WCWCD page. Paid by builders in St. George IN ADDITION to the city culinary water impact fee. Reduced fee available under Ultra Water Efficiency Standards (amount not published). Confidence medium and effectiveDate cleared because the district page publishes no specific effective date or resolution number.
per meter$17,266Washington County Water Conservancy District
Medium
St. Georgeimpact fees →

What drives the difference

St. George’s $33,173 per single-family home is $24,925 (302%) above Salt Lake City’s $8,248. The largest single difference is in water connection (tap / sdc): St. George charges about $19,485 there versus $1,871 in Salt Lake City — a $17,614 swing that accounts for much of the overall gap. The two also differ in how much falls on water and sewer connection charges: $2,416 in Salt Lake City versus $21,001 in St. George.

Keep comparing

Salt Lake City vs St. George impact fees — FAQ

Which has higher impact fees, Salt Lake City or St. George?
St. George, UT is higher. A single-family home pays about $33,173 per unit in St. George versus $8,248 in Salt Lake City, UT — $24,925 (302%) more, as of 2026.
How much more does it cost to build a home in St. George than in Salt Lake City?
About $24,925 more per single-family home — $33,173 in St. George, UT versus $8,248 in Salt Lake City, UT, a difference of 302% in total development impact and connection fees.
What's the difference between impact fees in Salt Lake City and St. George for a single-family home?
Salt Lake City, UT charges about $8,248 per single-family home ($5,832 impact + $2,416 water/sewer connection), while St. George, UT charges about $33,173 ($12,172 impact + $21,001 connection). Figures are normalized from official sources for 2026.