ImpactFeeAtlasCompare fees

Osceola County, FL vs St. George, UT: Development Impact Fees Compared (2026)

A single-family home pays about $48,161 in Osceola County vs $33,173 in St. George Osceola County is $14,988 (45%) higher. Every figure below is normalized per dwelling unit by category, with links to each jurisdiction’s official sources.

County

Osceola County, FL

$48,161
Total per single-family home
impact + connection fees
$37,718
Impact / development fees
roads, parks, schools…
$10,443
Water & sewer connection
tap / capacity / SDC
$27,626
Per multifamily unit
total fees / unit

Impact / development fees

Fee (local term)BasisAmountSource · effective
Transportation / roads
Mobility Fee (Transportation) - Single-Family (countywide base CMP area) — Countywide base CMP (Capacity Management Plan) area mobility fee; columns are Single-Family / Mobile Home / Multi-Family Rental / Multi-Family Condo / Townhouse. Used as PRIMARY single-family mobility row. Mutually-exclusive sub-area variants are excluded below. VERIFIED against archived official county PDF.
per dwelling unit$21,710Osceola County, FL (Impact and Mobility Fees Office)
Jun 20, 2025High
Schools
School (Educational System) Impact Fee - Single-Family — Educational system impact fee adopted under Osceola County Code Chapter 24, Article III; collected by the County for school facilities. Identical across all CMP service areas. Columns: Single-Family / Mobile Home / Multi-Family Rental / Multi-Family Condo / Townhouse. VERIFIED.
per dwelling unit$12,923Osceola County, FL (Impact and Mobility Fees Office)
Jun 20, 2025High
Parks & recreation
Park Impact Fee - Single-Family — Identical across all CMP service areas. VERIFIED.
per dwelling unit$2,305Osceola County, FL (Impact and Mobility Fees Office)
Jun 20, 2025High
Fire / EMS
Fire/Rescue Impact Fee - Single-Family — Fire rescue impact fee (Chapter 24, Article V). Identical across all CMP service areas. VERIFIED.
per dwelling unit$780Osceola County, FL (Impact and Mobility Fees Office)
Jun 20, 2025High
Transportation / roads
Mobility Fee - Single-Family (East of Lake Toho CMP Area) [VARIANT] — Mutually-exclusive geographic variant of the single-family mobility fee for the East of Lake Toho CMP service area. Excluded from total; countywide base $21,710.14 is primary. VERIFIED.
alternative · not added to total
per dwelling unit$20,654Osceola County, FL (Impact and Mobility Fees Office)
Jun 20, 2025High
Transportation / roads
Mobility Fee - Single-Family (South Lake Toho CMP Area) [VARIANT] — Mutually-exclusive geographic variant of the single-family mobility fee for the South Lake Toho CMP service area. Excluded from total. VERIFIED.
alternative · not added to total
per dwelling unit$20,014Osceola County, FL (Impact and Mobility Fees Office)
Jun 20, 2025High
Transportation / roads
Mobility Fee - Single-Family (Alligator Chain of Lakes CMP Area) [VARIANT] — Mutually-exclusive geographic variant of the single-family mobility fee for the Alligator Chain of Lakes CMP service area. Excluded from total. VERIFIED.
alternative · not added to total
per dwelling unit$21,347Osceola County, FL (Impact and Mobility Fees Office)
Jun 20, 2025High

Water & sewer connection fees

Fee (local term)BasisAmountSource · effective
Water connection (tap / SDC)
Toho Water Authority - Water System Development Charge (SDC), 3/4" meter — Toho Water Authority (utility serving Osceola County) Water SDC for the standard residential 3/4" meter. Separate special district / utility authority fee a builder must pay. PRIMARY meter size; larger meters are mutually-exclusive variants (excluded below). VERIFIED in Appendix A PDF.
per meter$6,650Toho Water Authority
May 5, 2025High
Sewer connection (tap / SDC)
Toho Water Authority - Wastewater/Sewer System Development Charge (SDC), 3/4" meter — Toho Water Authority Wastewater SDC for the standard residential 3/4" meter. Combined water+wastewater SDC = $9,943 per ERU at the 3/4" meter. Separate special district / utility authority fee. VERIFIED in Appendix A PDF.
per meter$3,293Toho Water Authority
May 5, 2025High
Water connection (tap / SDC)
Toho Water Authority - Water meter installation fee, 3/4" meter — Meter installation/set fee, additive to the water SDC for a new 3/4" residential connection. INDEPENDENTLY VERIFIED on the Toho Development Fees page AND in the Appendix A PDF (sourceIndex 1: '3/4" Potable Meter with dual check $500.00'). Confidence upgraded medium->high.
per meter$500Toho Water Authority
May 5, 2025High
Sewer connection (tap / SDC)
Toho Water Authority - Sanitary sewer tap fee — Wastewater tap fee, additive to the sewer SDC where a new tap is required. INDEPENDENTLY VERIFIED on the Toho Development Fees page; confidence upgraded medium->high. A separate sanitary lateral ($4,800) and sanitary connection ($150) may also apply depending on connection scope.
$2,250Toho Water Authority
May 5, 2025High
Water connection (tap / SDC)
Toho Water Authority - Water SDC, 1" meter [VARIANT] — Mutually-exclusive meter-size variant. Standard residential uses 3/4" meter (primary). Wastewater SDC at 1" meter is $5,499. VERIFIED in Appendix A PDF.
alternative · not added to total
per meter$11,106Toho Water Authority
May 5, 2025High
Water connection (tap / SDC)
Toho Water Authority - Water SDC, 2" meter [VARIANT] — Mutually-exclusive meter-size variant (Water SDC $35,445 / Wastewater SDC $17,552 at 2" meter). All meters above 2" subject to individual capacity analysis. 3/4" meter is primary. VERIFIED in Appendix A PDF.
alternative · not added to total
per meter$35,445Toho Water Authority
May 5, 2025High
Osceola Countyimpact fees →
City

St. George, UT

$33,173
Total per single-family home
impact + connection fees
$12,172
Impact / development fees
roads, parks, schools…
$21,001
Water & sewer connection
tap / capacity / SDC
Per multifamily unit
total fees / unit

Impact / development fees

Fee (local term)BasisAmountSource · effective
Parks & recreation
Parks & Recreation Impact Fee — Per dwelling unit, single-family. Confirmed verbatim on 4/21/21 schedule.
per dwelling unit$4,525City of St. George, Utah
Apr 21, 2021Highdated 2021
Transportation / roads
Transportation Impact Fee — Per dwelling unit, single-family. Confirmed verbatim.
per dwelling unit$2,188City of St. George, Utah
Apr 21, 2021Highdated 2021
Police
Police Impact Fee (Residential) — Residential single-family per unit. Confirmed verbatim.
per dwelling unit$95City of St. George, Utah
Apr 21, 2021Highdated 2021
Fire / EMS
Fire/EMS Impact Fee (Residential) — Residential single-family per unit (Fire/EMS column). Confirmed verbatim.
per dwelling unit$320City of St. George, Utah
Apr 21, 2021Highdated 2021
Drainage / stormwater
Storm Drain (Drainage) Impact Fee (Residential) — Residential single-family per unit (Drainage column). Confirmed verbatim.
per dwelling unit$781City of St. George, Utah
Apr 21, 2021Highdated 2021
General government / capital
Electrical (Power) Impact Fee - Residential single-phase 100 AMP — St. George is a municipal power provider; residential single-phase 100 AMP service (typical SF) used as representative. Additive. Confirmed verbatim.
per meter$3,893City of St. George, Utah
Apr 21, 2021Highdated 2021
General government / capital
Electrical (Power) Impact Fee - Residential single-phase 200 AMP — 200 AMP residential single-phase tier, mutually exclusive with 100 AMP. Excluded.
alternative · not added to total
per meter$4,809City of St. George, Utah
Apr 21, 2021Highdated 2021
General government / capital
Power Meter Fee - Underground — Power meter fee, underground service. Additive. Confirmed verbatim.
per meter$370City of St. George, Utah
Apr 21, 2021Highdated 2021

Water & sewer connection fees

Fee (local term)BasisAmountSource · effective
Water connection (tap / SDC)
Culinary Water Impact Fee (City) - base 0.8" meter — City culinary water impact fee, smallest/base residential 0.8" meter. Separate from and additive to WCWCD regional water impact fee.
per meter$1,996City of St. George, Utah
Apr 21, 2021Highdated 2021
Water connection (tap / SDC)
Culinary Water Impact Fee (City) - 1.0" meter — Larger meter tier, mutually exclusive with 0.8" base. Excluded.
alternative · not added to total
per meter$4,311City of St. George, Utah
Apr 21, 2021Highdated 2021
Water connection (tap / SDC)
Culinary Water Connection Fee (City) - 0.8" meter, water on lot — Additive water connection fee (on-lot), base 0.8" meter. If water not on lot it is $1,207.
per meter$223City of St. George, Utah
Apr 21, 2021Highdated 2021
Water connection (tap / SDC)
Culinary Water Connection Fee (City) - 0.8" meter, water NOT on lot — Alternative to on-lot connection fee. Excluded (mutually exclusive with on-lot $223).
alternative · not added to total
per meter$1,207City of St. George, Utah
Apr 21, 2021Highdated 2021
Sewer connection (tap / SDC)
Local & Regional Wastewater Impact Fee (City) - base 0.8" meter — Total wastewater impact fee for base 0.8" meter = $137 local + $1,379 regional. Confirmed verbatim.
per meter$1,516City of St. George, Utah
Apr 21, 2021Highdated 2021
Sewer connection (tap / SDC)
Local & Regional Wastewater Impact Fee (City) - 1.0" meter — Larger meter tier, mutually exclusive with 0.8" base. Excluded.
alternative · not added to total
per meter$3,274City of St. George, Utah
Apr 21, 2021Highdated 2021
Water connection (tap / SDC)
WCWCD Regional Water Impact Fee (separate district) — SEPARATE DISTRICT FEE: Washington County Water Conservancy District regional water impact fee, $17,266 per ERC for a 3/4"/5/8" residential meter. Confirmed verbatim on the WCWCD page. Paid by builders in St. George IN ADDITION to the city culinary water impact fee. Reduced fee available under Ultra Water Efficiency Standards (amount not published). Confidence medium and effectiveDate cleared because the district page publishes no specific effective date or resolution number.
per meter$17,266Washington County Water Conservancy District
Medium
St. Georgeimpact fees →

What drives the difference

Osceola County’s $48,161 per single-family home is $14,988 (45%) above St. George’s $33,173. The largest single difference is in transportation / roads: Osceola County charges about $21,710 there versus $2,188 in St. George — a $19,522 swing that accounts for much of the overall gap. The two also differ in how much falls on water and sewer connection charges: $10,443 in Osceola County versus $21,001 in St. George.

Keep comparing

Osceola County vs St. George impact fees — FAQ

Which has higher impact fees, Osceola County or St. George?
Osceola County, FL is higher. A single-family home pays about $48,161 per unit in Osceola County versus $33,173 in St. George, UT — $14,988 (45%) more, as of 2026.
How much more does it cost to build a home in Osceola County than in St. George?
About $14,988 more per single-family home — $48,161 in Osceola County, FL versus $33,173 in St. George, UT, a difference of 45% in total development impact and connection fees.
What's the difference between impact fees in Osceola County and St. George for a single-family home?
Osceola County, FL charges about $48,161 per single-family home ($37,718 impact + $10,443 water/sewer connection), while St. George, UT charges about $33,173 ($12,172 impact + $21,001 connection). Figures are normalized from official sources for 2026.