ImpactFeeAtlasCompare fees

Lincoln, CA vs Roseville, CA: Development Impact Fees Compared (2026)

A single-family home pays about $53,182 in Lincoln vs $50,059 in Roseville Lincoln is $3,123 (6%) higher. Every figure below is normalized per dwelling unit by category, with links to each jurisdiction’s official sources.

City

Lincoln, CA

$53,182
Total per single-family home
impact + connection fees
$37,892
Impact / development fees
roads, parks, schools…
$15,290
Water & sewer connection
tap / capacity / SDC
$29,518
Per multifamily unit
total fees / unit

Impact / development fees

Fee (local term)BasisAmountSource · effective
Transportation / roads
Transportation PFE (Public Facility Element) Fee — VERIFIED against Res. 2025-070 page-2 fee table (scanned image, read at 200 dpi). 'Proposed Area 1 PFE Fee' column = $6,642.16 per 1.00 EDU, effective Aug 1, 2025. Current Area 1 was $5,670.94 (corroborated by Annual DIF Report Attachment 2, eff. 9/1/2024). A typical SFD is 'Low Density' = 1.00 EDU for transportation (Table A-9 verified), so the per-EDU amount applies directly. Area 2 transportation = $4,832.15 (verified, excluded row). Fee escalates annually by ENR Construction Cost Index, applied 60 days after Council approval (Gov. Code 66017).
per dwelling unit$6,642City of Lincoln City Council
Aug 1, 2025High
Transportation / roads
Transportation PFE Fee — Area 2 (alternative service area) — VERIFIED: Proposed Area 2 transportation = $4,832.15 in Res. 2025-070 table. Alternative PFE service area, mutually exclusive with Area 1. excludeFromTotal correctly set to avoid double-counting with the Area 1 transportation row.
alternative · not added to total
per dwelling unit$4,832City of Lincoln City Council
Aug 1, 2025High
Drainage / stormwater
Drainage PFE Fee — North of Ravine — VERIFIED against Res. 2025-070 table: Drainage – North of Ravine Proposed Area 1 = $3,556.42 per 1.00 EDU, eff. Aug 1, 2025 (used as primary). Drainage splits geographically: Area 1 South of Ravine = $1,057.29 (verified, excluded), Area 2 = $831.67 (verified). Low-Density SFD drainage factor = 1.00 EDU (Table A-9 verified).
per dwelling unit$3,556City of Lincoln City Council
Aug 1, 2025High
Drainage / stormwater
Drainage PFE Fee — South of Ravine (alternative area) — VERIFIED against Res. 2025-070 table: Drainage – South of Ravine Proposed Area 1 = $1,057.29. Alternative drainage sub-area within Area 1 (a property pays either North OR South, not both). excludeFromTotal correctly set to avoid double-counting with the North-of-Ravine row used as primary.
alternative · not added to total
per dwelling unit$1,057City of Lincoln City Council
Aug 1, 2025High
Fire / EMS
Fire PFE Fee — VERIFIED against Res. 2025-070 table: Fire² Proposed Area 1 = $708.62 per 1.00 EDU, eff. Aug 1, 2025. Area 2 = $883.99 (verified). Footnote 2 verified verbatim: 'Development within the Village 1 Specific Plan area pays the Area No. 1 Fire PFE fee.'
per dwelling unit$709City of Lincoln City Council
Aug 1, 2025High
Police
Police PFE Fee — VERIFIED against Res. 2025-070 table: Police Proposed Area 1 = $775.28 per 1.00 EDU, eff. Aug 1, 2025. Area 2 = $862.45 (verified).
per dwelling unit$775City of Lincoln City Council
Aug 1, 2025High
General government / capital
Administration Facilities PFE Fee — VERIFIED against Res. 2025-070 table: Administration Proposed Area 1 = $1,132.15 per 1.00 EDU, eff. Aug 1, 2025. Same amount in Area 1 and Area 2 ($1,132.15, both columns verified). Funds administration building space to serve new development.
per dwelling unit$1,132City of Lincoln City Council
Aug 1, 2025High
Parks & recreation
Parks and Trails PFE Fee (Area 1) — VERIFIED against Res. 2025-070 table: Parks and Trails Proposed Area 1 = $5,901.76 per 1.00 EDU; Area 2 = $0.00 (verified — in Area 2 it is split into Neighborhood Parks $3,945.09, Regional Parks $4,317.16, Trails $737.34, all verified, all $0.00 in Area 1). A separate Park Recreational Facilities fee applies in both areas. Quimby Act park land-dedication in-lieu fees are SEPARATE and not a flat per-unit amount.
per dwelling unit$5,902City of Lincoln City Council
Aug 1, 2025High
Parks & recreation
Park Recreational Facilities PFE Fee — VERIFIED against Res. 2025-070 table: Park Recreational Facilities Proposed Area 1 = $776.30 per 1.00 EDU, eff. Aug 1, 2025. Area 2 = $847.06 (verified). ADDITIVE to the Parks and Trails fee. Applies in both areas.
per dwelling unit$776City of Lincoln City Council
Aug 1, 2025High
Library
Library PFE Fee (Area 2 only) — VERIFIED against Res. 2025-070 table: Library Proposed Area 1 = $0.00; Proposed Area 2 = $1,519.79 per 1.00 EDU. Because it is $0.00 in the Area 1 representative total, excludeFromTotal is correctly set; retained for completeness for Area 2 builders.
alternative · not added to total
per dwelling unit$1,520City of Lincoln City Council
Aug 1, 2025High
Other
Solid Waste PFE Fee — VERIFIED against Res. 2025-070 table: Solid Waste Proposed Area 1 = $699.39 per 1.00 EDU, eff. Aug 1, 2025. Area 2 = $681.96 (verified). Funds solid waste vehicles/equipment for new development.
per dwelling unit$699City of Lincoln City Council
Aug 1, 2025High
Schools
School Facilities Fee (Level 2) — Western Placer Unified School District — VERIFIED verbatim against the WPUSD Development Impact Fees 2025-2026 sheet (updated 9/17/2025): '$7.08/sq. ft. – Residential (Level 2, September 17, 2025)'. Statutory CA school facilities fee levied by Western Placer Unified School District on residential construction outside Mello Roos districts. 'Any additions 500 sq. ft. or smaller are exempt from fees' (verified verbatim). Commercial/industrial Level 1 = $0.84/sq ft (verified). For a ~2,200 sq ft SFD this is ~$15,576 paid to the district before the City issues a building permit. Attributed to WPUSD, not the City. Mello-Roos/CFD special taxes (CFD #1 12 Bridges/CattaVedera $10.58/sq ft up to 2,200 sq ft; CFD #2 Lincoln Crossing) are verified in the source as SEPARATE financing districts and correctly out of scope.
per sq ft$7.08Western Placer Unified School District
Sep 17, 2025High

Water & sewer connection fees

Fee (local term)BasisAmountSource · effective
Sewer connection (tap / SDC)
Wastewater Collection PFE Fee — VERIFIED against Res. 2025-070 table: Wastewater Collection¹ Proposed Area 1 = $4,319.41 per 1.00 EDU, eff. Aug 1, 2025. Footnote 1 confirms it 'includes wastewater collection and non-potable water facilities costs.' ADDITIVE to Wastewater Treatment below (separate funds). Area 2 = $5,676.14 (verified). Low-Density SFD = 1.00 EDU for wastewater (Table A-9 verified).
per dwelling unit$4,319City of Lincoln City Council
Aug 1, 2025High
Sewer connection (tap / SDC)
Wastewater Treatment PFE Fee — VERIFIED against Res. 2025-070 table: Wastewater Treatment Proposed Area 1 = $7,895.32 per 1.00 EDU, eff. Aug 1, 2025. Same amount in Area 1 and Area 2 ($7,895.32, both columns verified). ADDITIVE to Wastewater Collection above. Combined SFD sewer connection (collection + treatment) = $12,214.73 in Area 1. These are one-time PFE capacity charges (Annual DIF Report confirms PFE fees are one-time charges on new development).
per dwelling unit$7,895City of Lincoln City Council
Aug 1, 2025High
Water connection (tap / SDC)
Water Transmission PFE Fee — VERIFIED against Res. 2025-070 table: Water Transmission Proposed Area 1 = $2,025.36 per 1.00 EDU, eff. Aug 1, 2025. Same in Area 1 and Area 2 ($2,025.36, both columns verified). ADDITIVE to Water Storage below. This is the development water-capacity impact fee; physical meter installation ($570.06 for a residential 1" meter) is verified in the Master Fee Schedule Water Meter Rates and is correctly EXCLUDED as a hardware/install charge, not an impact fee.
per dwelling unit$2,025City of Lincoln City Council
Aug 1, 2025High
Water connection (tap / SDC)
Water Storage PFE Fee — VERIFIED against Res. 2025-070 table: Water Storage Proposed Area 1 = $1,050.12 per 1.00 EDU, eff. Aug 1, 2025. Area 2 = $957.82 (verified). ADDITIVE to Water Transmission above. Combined SFD water connection (transmission + storage) = $3,075.48 in Area 1.
per dwelling unit$1,050City of Lincoln City Council
Aug 1, 2025High
Lincolnimpact fees →
City

Roseville, CA

$50,059
Total per single-family home
impact + connection fees
$26,569
Impact / development fees
roads, parks, schools…
$23,490
Water & sewer connection
tap / capacity / SDC
Per multifamily unit
total fees / unit

Impact / development fees

Fee (local term)BasisAmountSource · effective
General government / capital
Public Facilities Fee (city capital/general) — Table 1 Public Facilities Fee per unit. LDR (low density) tier used as representative SFD. VERIFIED verbatim. Other tiers: MDR $3,742; SFD Age Restricted/HDR $2,694; HDR Age Restricted $2,245.
per dwelling unit$4,042City of Roseville Development Services Department
Jul 1, 2025High
General government / capital
Placer County Public/Capital Facilities Impact Fee — VERIFIED verbatim (Table 6). County fee collected by the City at Placer County's request, to mitigate impacts of growth on county services. SEPARATE DISTRICT (Placer County). Multi-family $2,032.09; Senior $1,833.29.
per dwelling unit$2,788City of Roseville Development Services Department
Jul 1, 2025High
Transportation / roads
City Traffic Mitigation Fee (TMF) - net (Infill district) — VERIFIED verbatim (Appendix M). City TMF gross $9,990.23 less $3,052 offset = $6,938.23 net per single-family unit in the Infill benefit district. Varies by benefit district; e.g. WRSP Fiddyment net $6,383.26, NRSP Ph2 N net $1,375.39.
per dwelling unit$6,938City of Roseville Development Services Department
Jul 1, 2025High
Transportation / roads
Highway 65 Interchange Improvement Fee (Hwy 65 JPA) — VERIFIED (Appendix M, Hwy 65 JPA gross=net per SFD in Infill district, additive). JPA includes Roseville, Rocklin, portions of Placer County. Other districts e.g. Del Webb/N.Industrial $432.77.
per dwelling unit$325City of Roseville Development Services Department
Jul 1, 2025High
Transportation / roads
South Placer Regional Transportation (SPRTA) Regional Fee — VERIFIED (Appendix M, SPRTA Regional net per SFD in Infill district, additive). Regional program (Roseville, Rocklin, Lincoln, unincorp. Placer Co). Many specific-plan districts $2,005.00.
per dwelling unit$945City of Roseville Development Services Department
Jul 1, 2025High
Transportation / roads
City-County Traffic Mitigation Fee (Baseline/Fiddyment/Walerga) — VERIFIED (Appendix M, City-County fee net per SFD in Infill district, additive). Funds Baseline Rd, Fiddyment Rd, Walerga Rd. Western specific plans much higher (WRSP Fiddyment $1,126.58). Infill four-fee Total Net = $8,291.53 as printed in booklet (confirms no double-count).
per dwelling unit$83.39City of Roseville Development Services Department
Jul 1, 2025High
Transportation / roads
SPRTA Tier II Fee (residential) - western specific plans only — VERIFIED verbatim (Appendix M footnote). EXCLUDED from primary total: SPRTA Tier II applies only in newer western benefit districts (Sierra Vista/Westbrook, Creekview, Amoruso Ranch), NOT in Infill. Where it applies it is additive on top of SPRTA Regional. Correctly excluded.
alternative · not added to total
per dwelling unit$8,687City of Roseville Development Services Department
Jul 1, 2025High
Drainage / stormwater
Pleasant Grove Creek Drainage Fee (LDR) — VERIFIED verbatim (Appendix L, Pleasant Grove Creek watershed, LDR per unit). MDR also $643.79; HDR $531.01. Only one drainage system applies depending on parcel watershed.
per dwelling unit$644City of Roseville Development Services Department
Jul 1, 2025High
Drainage / stormwater
Dry Creek Drainage Fee (Main Stem subshed, low density) - alternate watershed — VERIFIED verbatim (Appendix L). EXCLUDED (mutually exclusive with Pleasant Grove Creek - depends on parcel watershed). Dry Creek low-density per-new-unit rates range $371.38 (Main Stem) to $1,275.41 (Miners Ravine). Correctly excluded.
alternative · not added to total
per dwelling unit$371City of Roseville Development Services Department
Jul 1, 2025High
Parks & recreation
Citywide Park Fee (Infill) — VERIFIED verbatim (Appendix N Park Fees, Infill row, Citywide Park Fee per unit). Varies widely by specific plan. Funds community-serving park/recreation facilities.
per dwelling unit$2,897City of Roseville Development Services Department
Jul 1, 2025High
Parks & recreation
Neighborhood Park Fee (Infill) — VERIFIED verbatim (Appendix N Park Fees, Infill row, Neighborhood Park Fee per unit, additive to Citywide Park Fee). Varies by specific plan.
per dwelling unit$1,551City of Roseville Development Services Department
Jul 1, 2025High
Other
Electric Backbone Impact Fee (municipal electric utility) — VERIFIED verbatim (Table 7). Roseville Electric Backbone Impact Fee (substation & 60kV network), Roseville municipal electric utility. Per SFD; Multi-family $431.78. CORRECTED: recategorized from miscategorized 'police' to 'other' (schema lacks a utility/electric category), and flipped to excludeFromTotal=false - this is a genuine additive impact fee assessed on every new SFD electric connection; the prior exclusion was only to avoid the police miscategorization, now resolved.
per dwelling unit$596City of Roseville Development Services Department
Jul 1, 2025High
Other
Solid Waste Impact Fee — VERIFIED verbatim (Table 8 Solid Waste Impact Fee, to set up solid waste service). SFD per unit; Multi-family $139.00.
per dwelling unit$410City of Roseville Development Services Department
Jul 1, 2025High
Schools
RJUHSD High School Statutory Level 1 Developer Fee (no agreement) — VERIFIED verbatim (RJUHSD Schedule of Developer Fee Agreements, Revised 06/15/2026; statutory fees effective 08/10/2026). SEPARATE DISTRICT: Roseville Joint Union High School District (high-school portion ONLY) statutory Level 1 fee where no mitigation agreement applies. The ELEMENTARY district portion is additive on top; statewide combined Level 1 cap is $5.38/sf as of 1/28/2026 (sourceIndex 3, AALRR; takes effect 60 days after each district board approval). Most Roseville specific-plan areas use Mutual Benefit (mitigation) Agreements with far higher per-DU fees (RJUHSD alone ~$6,300-$13,300/DU).
per sq ft$2.14Roseville Joint Union High School District
Aug 10, 2026High
Schools
RJUHSD Mitigation-Agreement Fee example (Parcel 44 / Broadstone & Stone Point specific plans) — VERIFIED verbatim (RJUHSD schedule; mitigation agreements effective 07/01/2026 - effectiveDate CORRECTED from 2026-08-10 to 2026-07-01 per the document's own header). EXCLUDED (per-DU mitigation-agreement variant, area-specific; HIGH-SCHOOL DISTRICT ONLY). Stone Point also $13,269/DU. Illustrates that in master-planned specific-plan areas the RJUHSD fee alone (before the additive elementary-district fee) is ~$11,000-$13,300/DU, well above the statutory Level 1 rate. Mutually exclusive with the statutory $2.14/sf row. Correctly excluded.
alternative · not added to total
per dwelling unit$13,269Roseville Joint Union High School District
Jul 1, 2026High

Water & sewer connection fees

Fee (local term)BasisAmountSource · effective
Water connection (tap / SDC)
Water Connection Fee (Low Density Residential) — VERIFIED verbatim (Table 2 Water Connection Fee, LDR per unit, representative SFD). Density-tiered & mutually exclusive: MDR $7,614, HDR $5,074. City of Roseville Environmental Utilities (water).
per dwelling unit$12,688City of Roseville Development Services Department
Jul 1, 2025High
Water connection (tap / SDC)
Water Connection Fee (Medium Density) - alternate tier — VERIFIED verbatim (Table 2). EXCLUDED (mutually exclusive density tier with LDR). Correctly excluded.
alternative · not added to total
per dwelling unit$7,614City of Roseville Development Services Department
Jul 1, 2025High
Water connection (tap / SDC)
Water Meter Fee (meter + installation) — VERIFIED verbatim. Additive to Water Connection Fee. Cost of meter and installation per new connection.
per dwelling unit$409City of Roseville Development Services Department
Jul 1, 2025High
Water connection (tap / SDC)
Water Use Fee (construction water) — VERIFIED verbatim. Additive. Water used during construction, per unit.
per dwelling unit$75City of Roseville Development Services Department
Jul 1, 2025High
Water connection (tap / SDC)
Doctor's Ranch Supplemental Water Benefit Area Fee (parcel-specific example) — VERIFIED verbatim (Appendix K, Doctor's Ranch Annexation Supplemental Water Benefit Area Fees). EXCLUDED: parcel-specific waterline-reimbursement assessment applying ONLY in Doctor's Ranch. Example of location-specific water pressure-zone/reimbursement fees (PZ2, PZ4, NI for NC, NUR for NC, Foothills, Doctor's Ranch) mutually exclusive by parcel. Correctly excluded.
alternative · not added to total
per dwelling unit$1,275City of Roseville Development Services Department
Jul 1, 2025High
Sewer connection (tap / SDC)
Regional Sewer Connection Fee — VERIFIED verbatim. Regional Treatment Plant Service Area (Roseville + portions of Placer Co + South Placer MUD). Per sewer/dwelling unit. Additive with Local Sewer Connection Fee.
per dwelling unit$9,858City of Roseville Development Services Department
Jul 1, 2025High
Sewer connection (tap / SDC)
Local Sewer Connection Fee — VERIFIED verbatim. City limits local sewer, per sewer/dwelling unit. Additive to Regional Sewer Connection Fee.
per dwelling unit$460City of Roseville Development Services Department
Jul 1, 2025High
Sewer connection (tap / SDC)
Sewer Special Benefit Area #4 Unit Bank Fee (parcel-specific) — VERIFIED verbatim. EXCLUDED: applies only to affected SSBA4 parcels (Southfork/A90 area). SSBA3 fee ($697/unit) similarly applies only to affected parcels. Correctly excluded.
alternative · not added to total
per dwelling unit$7,765City of Roseville Development Services Department
Jul 1, 2025High
Rosevilleimpact fees →

What drives the difference

Lincoln’s $53,182 per single-family home is $3,123 (6%) above Roseville’s $50,059. The largest single difference is in schools: Lincoln charges about $17,700 there versus $5,350 in Roseville — a $12,350 swing that accounts for much of the overall gap. The two also differ in how much falls on water and sewer connection charges: $15,290 in Lincoln versus $23,490 in Roseville.

Keep comparing

Lincoln vs Roseville impact fees — FAQ

Which has higher impact fees, Lincoln or Roseville?
Lincoln, CA is higher. A single-family home pays about $53,182 per unit in Lincoln versus $50,059 in Roseville, CA — $3,123 (6%) more, as of 2026.
How much more does it cost to build a home in Lincoln than in Roseville?
About $3,123 more per single-family home — $53,182 in Lincoln, CA versus $50,059 in Roseville, CA, a difference of 6% in total development impact and connection fees.
What's the difference between impact fees in Lincoln and Roseville for a single-family home?
Lincoln, CA charges about $53,182 per single-family home ($37,892 impact + $15,290 water/sewer connection), while Roseville, CA charges about $50,059 ($26,569 impact + $23,490 connection). Figures are normalized from official sources for 2026.