ImpactFeeAtlasCompare fees

Lincoln, CA vs Rocklin, CA: Development Impact Fees Compared (2026)

A single-family home pays about $53,182 in Lincoln vs $65,146 in Rocklin Rocklin is $11,964 (22%) higher. Every figure below is normalized per dwelling unit by category, with links to each jurisdiction’s official sources.

City

Lincoln, CA

$53,182
Total per single-family home
impact + connection fees
$37,892
Impact / development fees
roads, parks, schools…
$15,290
Water & sewer connection
tap / capacity / SDC
$29,518
Per multifamily unit
total fees / unit

Impact / development fees

Fee (local term)BasisAmountSource · effective
Transportation / roads
Transportation PFE (Public Facility Element) Fee — VERIFIED against Res. 2025-070 page-2 fee table (scanned image, read at 200 dpi). 'Proposed Area 1 PFE Fee' column = $6,642.16 per 1.00 EDU, effective Aug 1, 2025. Current Area 1 was $5,670.94 (corroborated by Annual DIF Report Attachment 2, eff. 9/1/2024). A typical SFD is 'Low Density' = 1.00 EDU for transportation (Table A-9 verified), so the per-EDU amount applies directly. Area 2 transportation = $4,832.15 (verified, excluded row). Fee escalates annually by ENR Construction Cost Index, applied 60 days after Council approval (Gov. Code 66017).
per dwelling unit$6,642City of Lincoln City Council
Aug 1, 2025High
Transportation / roads
Transportation PFE Fee — Area 2 (alternative service area) — VERIFIED: Proposed Area 2 transportation = $4,832.15 in Res. 2025-070 table. Alternative PFE service area, mutually exclusive with Area 1. excludeFromTotal correctly set to avoid double-counting with the Area 1 transportation row.
alternative · not added to total
per dwelling unit$4,832City of Lincoln City Council
Aug 1, 2025High
Drainage / stormwater
Drainage PFE Fee — North of Ravine — VERIFIED against Res. 2025-070 table: Drainage – North of Ravine Proposed Area 1 = $3,556.42 per 1.00 EDU, eff. Aug 1, 2025 (used as primary). Drainage splits geographically: Area 1 South of Ravine = $1,057.29 (verified, excluded), Area 2 = $831.67 (verified). Low-Density SFD drainage factor = 1.00 EDU (Table A-9 verified).
per dwelling unit$3,556City of Lincoln City Council
Aug 1, 2025High
Drainage / stormwater
Drainage PFE Fee — South of Ravine (alternative area) — VERIFIED against Res. 2025-070 table: Drainage – South of Ravine Proposed Area 1 = $1,057.29. Alternative drainage sub-area within Area 1 (a property pays either North OR South, not both). excludeFromTotal correctly set to avoid double-counting with the North-of-Ravine row used as primary.
alternative · not added to total
per dwelling unit$1,057City of Lincoln City Council
Aug 1, 2025High
Fire / EMS
Fire PFE Fee — VERIFIED against Res. 2025-070 table: Fire² Proposed Area 1 = $708.62 per 1.00 EDU, eff. Aug 1, 2025. Area 2 = $883.99 (verified). Footnote 2 verified verbatim: 'Development within the Village 1 Specific Plan area pays the Area No. 1 Fire PFE fee.'
per dwelling unit$709City of Lincoln City Council
Aug 1, 2025High
Police
Police PFE Fee — VERIFIED against Res. 2025-070 table: Police Proposed Area 1 = $775.28 per 1.00 EDU, eff. Aug 1, 2025. Area 2 = $862.45 (verified).
per dwelling unit$775City of Lincoln City Council
Aug 1, 2025High
General government / capital
Administration Facilities PFE Fee — VERIFIED against Res. 2025-070 table: Administration Proposed Area 1 = $1,132.15 per 1.00 EDU, eff. Aug 1, 2025. Same amount in Area 1 and Area 2 ($1,132.15, both columns verified). Funds administration building space to serve new development.
per dwelling unit$1,132City of Lincoln City Council
Aug 1, 2025High
Parks & recreation
Parks and Trails PFE Fee (Area 1) — VERIFIED against Res. 2025-070 table: Parks and Trails Proposed Area 1 = $5,901.76 per 1.00 EDU; Area 2 = $0.00 (verified — in Area 2 it is split into Neighborhood Parks $3,945.09, Regional Parks $4,317.16, Trails $737.34, all verified, all $0.00 in Area 1). A separate Park Recreational Facilities fee applies in both areas. Quimby Act park land-dedication in-lieu fees are SEPARATE and not a flat per-unit amount.
per dwelling unit$5,902City of Lincoln City Council
Aug 1, 2025High
Parks & recreation
Park Recreational Facilities PFE Fee — VERIFIED against Res. 2025-070 table: Park Recreational Facilities Proposed Area 1 = $776.30 per 1.00 EDU, eff. Aug 1, 2025. Area 2 = $847.06 (verified). ADDITIVE to the Parks and Trails fee. Applies in both areas.
per dwelling unit$776City of Lincoln City Council
Aug 1, 2025High
Library
Library PFE Fee (Area 2 only) — VERIFIED against Res. 2025-070 table: Library Proposed Area 1 = $0.00; Proposed Area 2 = $1,519.79 per 1.00 EDU. Because it is $0.00 in the Area 1 representative total, excludeFromTotal is correctly set; retained for completeness for Area 2 builders.
alternative · not added to total
per dwelling unit$1,520City of Lincoln City Council
Aug 1, 2025High
Other
Solid Waste PFE Fee — VERIFIED against Res. 2025-070 table: Solid Waste Proposed Area 1 = $699.39 per 1.00 EDU, eff. Aug 1, 2025. Area 2 = $681.96 (verified). Funds solid waste vehicles/equipment for new development.
per dwelling unit$699City of Lincoln City Council
Aug 1, 2025High
Schools
School Facilities Fee (Level 2) — Western Placer Unified School District — VERIFIED verbatim against the WPUSD Development Impact Fees 2025-2026 sheet (updated 9/17/2025): '$7.08/sq. ft. – Residential (Level 2, September 17, 2025)'. Statutory CA school facilities fee levied by Western Placer Unified School District on residential construction outside Mello Roos districts. 'Any additions 500 sq. ft. or smaller are exempt from fees' (verified verbatim). Commercial/industrial Level 1 = $0.84/sq ft (verified). For a ~2,200 sq ft SFD this is ~$15,576 paid to the district before the City issues a building permit. Attributed to WPUSD, not the City. Mello-Roos/CFD special taxes (CFD #1 12 Bridges/CattaVedera $10.58/sq ft up to 2,200 sq ft; CFD #2 Lincoln Crossing) are verified in the source as SEPARATE financing districts and correctly out of scope.
per sq ft$7.08Western Placer Unified School District
Sep 17, 2025High

Water & sewer connection fees

Fee (local term)BasisAmountSource · effective
Sewer connection (tap / SDC)
Wastewater Collection PFE Fee — VERIFIED against Res. 2025-070 table: Wastewater Collection¹ Proposed Area 1 = $4,319.41 per 1.00 EDU, eff. Aug 1, 2025. Footnote 1 confirms it 'includes wastewater collection and non-potable water facilities costs.' ADDITIVE to Wastewater Treatment below (separate funds). Area 2 = $5,676.14 (verified). Low-Density SFD = 1.00 EDU for wastewater (Table A-9 verified).
per dwelling unit$4,319City of Lincoln City Council
Aug 1, 2025High
Sewer connection (tap / SDC)
Wastewater Treatment PFE Fee — VERIFIED against Res. 2025-070 table: Wastewater Treatment Proposed Area 1 = $7,895.32 per 1.00 EDU, eff. Aug 1, 2025. Same amount in Area 1 and Area 2 ($7,895.32, both columns verified). ADDITIVE to Wastewater Collection above. Combined SFD sewer connection (collection + treatment) = $12,214.73 in Area 1. These are one-time PFE capacity charges (Annual DIF Report confirms PFE fees are one-time charges on new development).
per dwelling unit$7,895City of Lincoln City Council
Aug 1, 2025High
Water connection (tap / SDC)
Water Transmission PFE Fee — VERIFIED against Res. 2025-070 table: Water Transmission Proposed Area 1 = $2,025.36 per 1.00 EDU, eff. Aug 1, 2025. Same in Area 1 and Area 2 ($2,025.36, both columns verified). ADDITIVE to Water Storage below. This is the development water-capacity impact fee; physical meter installation ($570.06 for a residential 1" meter) is verified in the Master Fee Schedule Water Meter Rates and is correctly EXCLUDED as a hardware/install charge, not an impact fee.
per dwelling unit$2,025City of Lincoln City Council
Aug 1, 2025High
Water connection (tap / SDC)
Water Storage PFE Fee — VERIFIED against Res. 2025-070 table: Water Storage Proposed Area 1 = $1,050.12 per 1.00 EDU, eff. Aug 1, 2025. Area 2 = $957.82 (verified). ADDITIVE to Water Transmission above. Combined SFD water connection (transmission + storage) = $3,075.48 in Area 1.
per dwelling unit$1,050City of Lincoln City Council
Aug 1, 2025High
Lincolnimpact fees →
City

Rocklin, CA

$65,146
Total per single-family home
impact + connection fees
$34,196
Impact / development fees
roads, parks, schools…
$30,950
Water & sewer connection
tap / capacity / SDC
Per multifamily unit
total fees / unit

Impact / development fees

Fee (local term)BasisAmountSource · effective
Parks & recreation
Park Improvement Impact Fee — Representative single-family tier >1,501-2,500 sq ft. Other tiers: <600 sf $1,954.43; 600-1,000 $2,399.50; >1,000-1,500 $3,831.46; >2,501-3,500 $6,269.67; 3,500+ $8,127.35; age-restricted $2,805.87. VERIFIED verbatim in City of Rocklin fee schedule (Ordinance 1149), p.8.
per dwelling unit$5,341City of Rocklin
Jul 1, 2025High
Parks & recreation
Trails Impact Fee — Additive to Park Improvement Fee (Ordinance 1149). Tiered by home size; representative >1,500-2,500 sq ft tier. VERIFIED verbatim p.9.
per dwelling unit$238City of Rocklin
Jul 1, 2025High
General government / capital
Public Facilities Impact Fee — Public Facilities Impact Fee (Ordinance 1149) for general municipal facilities. Representative >1,500-2,500 sq ft tier. Other tiers range $870-$3,618. VERIFIED verbatim p.12.
per dwelling unit$2,378City of Rocklin
Jul 1, 2025High
Parks & recreation
Community and Recreational Facilities Fee — Community and Recreational Facilities Fee (Ordinance 1149), separate from Park Improvement and Trails fees. Representative >1,500-2,500 sq ft tier. VERIFIED verbatim p.13.
per dwelling unit$1,031City of Rocklin
Jul 1, 2025High
Transportation / roads
City Traffic Fee — City of Rocklin Traffic Fee (Resolution 2011-125), per dwelling-unit-equivalent. This is the CITY traffic fee; the regional SPRTA fee and (in NW Rocklin) the Highway 65 Interchange fee are additive separate transportation fees. VERIFIED verbatim p.14.
per dwelling unit$3,774City of Rocklin
Jul 1, 2025High
Transportation / roads
SPRTA Regional Traffic Fee (Rocklin district) — South Placer Regional Transportation Authority Tier 1 fee for the Rocklin fee district, collected by the City of Rocklin (Resolution 2008-02). Additive to the City Traffic Fee. Tiered by size: Small <1,500 sf $3,849; Medium 1,500-2,500 $4,637; Large >2,500-3,500 $5,008; Very Large >3,500 $5,286. Representative Medium tier shown. VERIFIED in SPRTA Tier 1 table (Rocklin district): SFD row 0.83/1.00/1.08/1.14 = $3,849/$4,637/$5,008/$5,286.
per dwelling unit$4,637Placer County Transportation Planning Agency / South Placer Regional Transportation Authority
Jul 1, 2025High
Drainage / stormwater
DC Watershed Drainage Fee (Secret Ravine) — Dry Creek (DC) Watershed JPA drainage fee (Ordinance 672), collected by City of Rocklin. Zone-specific: Secret Ravine SFD (<=4 du/acre) $311/unit; Antelope Creek SFD $274/unit; higher-density rates $119/$113; Pleasant Grove watershed has no fee. Applies only to parcels within the Secret Ravine or Antelope Creek watersheds, so not universally applicable across Rocklin. VERIFIED verbatim p.17 (table wraps 'per acre' to next line).
per dwelling unit$311City of Rocklin
Jul 1, 2025Medium
General government / capital
Placer County Capital Facilities Impact Fee (County Impact Fee) — Placer County Capital Facilities Impact Fee (County Impact Fee, Resolution 2000-108), collected by City of Rocklin on behalf of Placer County for county-wide general government facilities. Adjusted for inflation each fall. VERIFIED verbatim p.25.
per dwelling unit$3,561City of Rocklin
Jul 1, 2025High
Schools
Rocklin USD School Facilities (Developer) Fee - Level 1 — Levied by Rocklin Unified School District (separate district), not the City. Statutory Level 1 fee $5.17/sq ft of assessable residential area (Resolution #23-24-34, adopted 4/17/2024). For a representative ~2,250 sq ft home this is ~$11,632. Multifamily also $5.17/sf (no cap). NOTE: Whitney Ranch area adds $1,500/SF home (or $1,000/MF) ON TOP of $5.17/sf. Commercial $0.84/sf; senior housing $0.23/sf; self-storage $0.34/sf. Most of Rocklin is in Rocklin USD; small areas may be in other districts. VERIFIED verbatim on RUSD fee increase flier.
per sq ft$5.17Rocklin Unified School District
Jun 16, 2024High
Schools
Rocklin USD School Facilities Fee - per representative 2,250 sf home — Per-dwelling-unit equivalent of the $5.17/sf school fee assuming a representative 2,250 sq ft home ($5.17 x 2,250 = $11,632.50). Marked excludeFromTotal to avoid double-counting with the per-sqft school fee row; included for reference/comparison. VERIFIED: math checks ($5.17 x 2,250 = $11,632.50).
alternative · not added to total
per dwelling unit$11,633Rocklin Unified School District
Jun 16, 2024High

Water & sewer connection fees

Fee (local term)BasisAmountSource · effective
Sewer connection (tap / SDC)
NW Rocklin Sewer Trunk Line Facilities Fee — Northwest Rocklin Sewer Trunk Line Project Facilities Fee (Resolution 2013-200). Applies ONLY to development within the Northwest Rocklin Annexation Area, so it is geographically limited; excluded from the citywide single-family total. VERIFIED verbatim p.16.
alternative · not added to total
per dwelling unit$268City of Rocklin
Jul 1, 2025Medium
Sewer connection (tap / SDC)
SPMUD Sewer Capacity Charge (total per EDU) — Levied by South Placer Municipal Utility District (SPMUD, separate district) - the sewer provider for Rocklin. Total capacity charge per single-family EDU = $15,006, composed of a $5,019 Local Capacity Charge + $9,987 Regional Capacity Charge (SPWA treatment). One EDU = a single-family residential connection. Same amount in the FY26/27 fee schedule (Resolution 26-23). The 2023 Capacity Fee Study's $4,915 figure was the LOCAL component only; the larger regional/treatment component is additive. VERIFIED verbatim in SPMUD FY26/27 fee schedule.
per meter$15,006South Placer Municipal Utility District
Jul 1, 2025High
Sewer connection (tap / SDC)
SPMUD Local Capacity Charge per EDU — Local component of the SPMUD capacity charge; excluded from total because it is already included in the $15,006 total capacity charge row. VERIFIED verbatim.
alternative · not added to total
per meter$5,019South Placer Municipal Utility District
Jul 1, 2025High
Sewer connection (tap / SDC)
SPMUD Regional Capacity Charge per EDU (SPWA treatment) — Regional treatment component (South Placer Wastewater Authority) of the SPMUD capacity charge; excluded from total because already included in the $15,006 total capacity charge row. VERIFIED verbatim ($5,019 + $9,987 = $15,006).
alternative · not added to total
per meter$9,987South Placer Municipal Utility District
Jul 1, 2025High
Water connection (tap / SDC)
PCWA Water Connection Charge (Lower Zone 6) - typical SFD lot — Levied by Placer County Water Agency (PCWA, separate district) - the water provider for Rocklin (Lower Zone 6 - Foothill/Sunset/Ophir & Auburn/Bowman). Effective 1/1/2026. WCC is assessed by LOT SIZE (UOC x base rate $25,815). Representative typical Rocklin SFD lot of 5,501-7,000 sq ft = 0.6 UOC = $15,489 (5/8" meter). Smaller lots (<=2,900 sf) = $5,163; larger lots (10,001-17,000 sf, 1.0 UOC) = $25,815 (full base rate). Plus a 5/8" Meter Set Fee of $455. VERIFIED verbatim in PCWA Lower Zone 6 WCC sheet.
per meter$15,489Placer County Water Agency
Jan 1, 2026High
Water connection (tap / SDC)
PCWA Water Connection Charge - full 1.0 UOC base rate — Full base-rate WCC for one Unit of Capacity (lot 10,001-17,000 sq ft). Larger-lot variant of the PCWA water connection charge; excluded from total to avoid double counting (the typical-lot 0.6-UOC row is the primary). Components: Treatment $10,561 + Transmission $9,452 + Storage $4,880 + Groundwater $798 + Planning $124 = $25,815. VERIFIED verbatim.
alternative · not added to total
per meter$25,815Placer County Water Agency
Jan 1, 2026High
Water connection (tap / SDC)
PCWA Meter Set Fee (5/8") — PCWA meter set/installation fee for a 5/8" meter, additive to the Water Connection Charge. VERIFIED verbatim (5/8" = $455).
per meter$455Placer County Water Agency
Jan 1, 2026High
Rocklinimpact fees →

What drives the difference

Rocklin’s $65,146 per single-family home is $11,964 (22%) above Lincoln’s $53,182. The largest single difference is in water connection (tap / sdc): Rocklin charges about $15,944 there versus $3,075 in Lincoln — a $12,869 swing that accounts for much of the overall gap. The two also differ in how much falls on water and sewer connection charges: $15,290 in Lincoln versus $30,950 in Rocklin.

Keep comparing

Lincoln vs Rocklin impact fees — FAQ

Which has higher impact fees, Lincoln or Rocklin?
Rocklin, CA is higher. A single-family home pays about $65,146 per unit in Rocklin versus $53,182 in Lincoln, CA — $11,964 (22%) more, as of 2026.
How much more does it cost to build a home in Rocklin than in Lincoln?
About $11,964 more per single-family home — $65,146 in Rocklin, CA versus $53,182 in Lincoln, CA, a difference of 22% in total development impact and connection fees.
What's the difference between impact fees in Lincoln and Rocklin for a single-family home?
Lincoln, CA charges about $53,182 per single-family home ($37,892 impact + $15,290 water/sewer connection), while Rocklin, CA charges about $65,146 ($34,196 impact + $30,950 connection). Figures are normalized from official sources for 2026.