Kyle, TX vs San Marcos, TX: Development Impact Fees Compared (2026)
A single-family home pays about $20,470 in Kyle vs $7,074 in San Marcos — Kyle is $13,396 (189%) higher. Every figure below is normalized per dwelling unit by category, with links to each jurisdiction’s official sources.
City
Kyle, TX
$20,470
Total per single-family home
impact + connection fees
$0
Impact / development fees
roads, parks, schools…
$20,470
Water & sewer connection
tap / capacity / SDC
—
Per multifamily unit
total fees / unit
Impact / development fees
| Fee (local term) | Basis | Amount | Source · effective |
|---|---|---|---|
Drainage / stormwater Storm Drainage & Flood Risk Mitigation Utility Fee - Single-Family (RECURRING MONTHLY, not one-time) — VERIFIED VERBATIM (Code Section 50-511, Storm Drainage Charge (Monthly)). This is a RECURRING MONTHLY utility charge on the utility bill ($5.00/month per single-family home), NOT a one-time drainage impact/development fee. Kyle has NO one-time drainage impact fee. Reference row only; correctly excluded from the one-time development-fee total. alternative · not added to total | per dwelling unit | $5 | City of Kyle, TX (official adopted fee schedule) Oct 1, 2025High |
Water & sewer connection fees
| Fee (local term) | Basis | Amount | Source · effective |
|---|---|---|---|
Water connection (tap / SDC) Water Impact Fee - per LUE (single-family = 5/8"x3/4" meter = 1 LUE) — VERIFIED VERBATIM in the adopted FY2025-2026 fee schedule PDF (Code Section 50-259, Engineering, Schedule of Water Impact Fees Per LUE). CURRENT water impact fee, applicable to plats approved 8-27-2025 to present (set by Ordinance No. 1380, adopted 8-19-2025). Assessed per Living Unit Equivalent (LUE); one detached home = 1 LUE = $10,908. The $10,908/LUE figure and Ordinance 1380 (adopted 8-19-2025) are independently corroborated by Community Impact and the City's public-notice/eCode360 references. Older fees apply only to earlier plat-date ranges or net LUE increases on prior-assessed land. Note: the LUE Determination Table is a rendered image in the PDF and was not machine-extractable, but 5/8"x3/4" meter = 1.0 LUE is the standard single-family residential service unit. | per dwelling unit | $10,908 | City of Kyle, TX (official adopted fee schedule) Aug 27, 2025High |
Sewer connection (tap / SDC) Wastewater (Sewer) Impact Fee - per LUE (single-family = 1 LUE) — VERIFIED VERBATIM in the adopted FY2025-2026 fee schedule PDF (Code Section 50-259, Engineering, Schedule of Sewer Impact Fees Per LUE). CURRENT wastewater impact fee for plats approved 8-27-2025 to present (Ordinance No. 1380, adopted 8-19-2025). Per LUE; 1 single-family home = 1 LUE = $8,762. Independently corroborated by secondary sources. Combined current water + wastewater impact fee per single-family home = $10,908 + $8,762 = $19,670. Prior tier (12-5-2023 to 8-26-2025) was $6,345; historical only. | per dwelling unit | $8,762 | City of Kyle, TX (official adopted fee schedule) Aug 27, 2025High |
Water connection (tap / SDC) Water Tap Fee - Inside City (single tap) — VERIFIED VERBATIM (Code Section 50-20(a), Public Works, Water and Sewer System Tap Fees). Physical water tap/connection fee = $400.00 + Cost (actual install cost) inside city limits; $550.00 + Cost outside city. This is an at-cost connection fee SEPARATE from and additional to the water impact fee. The '+ Cost' means the cash figure varies by installation; $400 is the fixed base. Outside-city variant ($550) correctly excluded as a mutually-exclusive location variant. The variable '+ Cost' portion is not captured in the cash figure. | per meter | $400 | City of Kyle, TX (official adopted fee schedule) Oct 1, 2025High |
Sewer connection (tap / SDC) Sewer Tap Fee - Inside City (single tap) — VERIFIED VERBATIM (Code Section 50-20(a), Public Works). Physical sewer tap/connection fee = $400.00 + Cost inside city; $550.00 + Cost outside city. At-cost connection fee, separate from and additional to the wastewater impact fee. Fixed base of $400 captured; variable '+ Cost' not captured. Outside-city variant correctly excluded as a location variant. | per meter | $400 | City of Kyle, TX (official adopted fee schedule) Oct 1, 2025High |
Water connection (tap / SDC) Water Impact Fee - per LUE (prior tier, plats 12-5-2023 to 8-26-2025) — HISTORICAL — VERIFIED VERBATIM. Prior water impact fee tier; applies only to tracts platted 12-5-2023 to 8-26-2025 or to net LUE increases on prior-assessed land. NOT what a new single-family home platted today pays. Reference row only; correctly excluded from the representative current SFD total. alternative · not added to total | per dwelling unit | $6,169 | City of Kyle, TX (official adopted fee schedule) Dec 5, 2023High |
Sewer connection (tap / SDC) Wastewater Impact Fee - per LUE (prior tier, plats 12-5-2023 to 8-26-2025) — HISTORICAL — VERIFIED VERBATIM. Prior wastewater impact fee tier (plats 12-5-2023 to 8-26-2025 / net LUE increases on prior-assessed land). Historical reference only; not paid by a new SFD today. Correctly excluded from the representative current SFD total. alternative · not added to total | per dwelling unit | $6,345 | City of Kyle, TX (official adopted fee schedule) Dec 5, 2023High |
City
San Marcos, TX
$7,074
Total per single-family home
impact + connection fees
$444
Impact / development fees
roads, parks, schools…
$6,630
Water & sewer connection
tap / capacity / SDC
—
Per multifamily unit
total fees / unit
Impact / development fees
| Fee (local term) | Basis | Amount | Source · effective |
|---|---|---|---|
Parks & recreation Parkland Development Fee — From the Development Fee Schedule effective 10/1/2025 (Resolution 2025-185R); confirmed verbatim 'Parkland Development Fee $444/ unit'. NOTE: This is a parkland dedication/development charge under the city's subdivision authority, NOT a Ch. 395 park impact fee (park impact fees are not permitted in Texas). Applies per residential unit. | per dwelling unit | $444 | City of San Marcos, TX Oct 1, 2025High |
Parks & recreation Parkland Fee-in-Lieu — Fee-in-lieu of land dedication, per the 10/1/2025 Development Fee Schedule (Resolution 2025-185R); confirmed verbatim 'Parkland Fee-in-Lieu $317/ unit'. Alternative/additional to the $444 Parkland Development Fee depending on whether land is dedicated; excluded from total to avoid double-counting parkland charges. alternative · not added to total | per dwelling unit | $317 | City of San Marcos, TX Oct 1, 2025High |
Drainage / stormwater Detention (Drainage) Fee-in-Lieu — Fee-in-lieu of building on-site stormwater detention, per the 10/1/2025 Development Fee Schedule (Resolution 2025-185R); confirmed verbatim '$10.00 / square foot or a City approved Engineer's Estimate of cost to construct'. Per square foot of required detention, not per dwelling unit; only applies when a developer opts out of constructing detention. Excluded from per-unit total (project/site-specific). San Marcos has NO drainage impact fee; stormwater is otherwise a monthly utility fee. alternative · not added to total | per sq ft | $10 | City of San Marcos, TX Oct 1, 2025High |
Mitigation Water Quality Fee-in-Lieu — Fee-in-lieu of on-site water quality controls, per the 10/1/2025 Development Fee Schedule (Resolution 2025-185R); confirmed verbatim 'Water Quality Fee-in-Lieu $0.37 / square foot'. Per square foot of impervious cover, site-specific; excluded from per-unit total. alternative · not added to total | per sq ft | $0.37 | City of San Marcos, TX Oct 1, 2025High |
Water & sewer connection fees
| Fee (local term) | Basis | Amount | Source · effective |
|---|---|---|---|
Water connection (tap / SDC) Water Impact Fee — Per Ordinance 2018-09 Schedule 1 (confirmed verbatim in re-fetched PDF: WATER UTILITY '1 to 10 / 1.0 / Impact Fee after 4/30/2018 = 3,801.00'; corroborated by Table 8 and the 2018-update footnote 'Water $3,801/LUE'). 1.0 LUE = one single-family residential connection on a 5/8"-3/4" meter (calculated peak water flow 0-10 gpm). Adopted amount equals the 2018 study maximum (Option A). Still the only impact fee ordinance referenced on the city's official Impact Fees page as of 2026-06-17. Levied under City Code Ch. 86 Art. 5 Div. 4. | per dwelling unit | $3,801 | City of San Marcos, TX Apr 30, 2018Mediumdated 2018 |
Sewer connection (tap / SDC) Wastewater Impact Fee — Per Ordinance 2018-09 Schedule 1 (confirmed verbatim: WASTEWATER UTILITY '1 to 10 / 1.0 / Impact Fee after 4/30/2018 = 2,684.00'; corroborated by Table 8 and the footnote 'Wastewater $2,684/LUE'). 1.0 LUE = single-family residential connection (5/8"-3/4" meter). Combined with water impact fee, a typical SFD home pays $6,485 total. Levied under City Code Ch. 86 Art. 5 Div. 4. | per dwelling unit | $2,684 | City of San Marcos, TX Apr 30, 2018Mediumdated 2018 |
Water connection (tap / SDC) New Residential Water Service Connection Fee — Connection/meter-set fee for new residential service (Utility Rates effective 10/1/2025, City Code 86.198); confirmed verbatim 'New Service - Residential = Meter Cost + $ 145.00' with 'Service fees established by City Code 86.198'. The $145 is the fixed connection component, plus the actual meter hardware cost (varies). This is separate from and in addition to the water/wastewater impact fees above. | per meter | $145 | City of San Marcos, TX Oct 1, 2025High |
What drives the difference
Kyle’s $20,470 per single-family home is $13,396 (189%) above San Marcos’s $7,074. The largest single difference is in water connection (tap / sdc): Kyle charges about $11,308 there versus $3,946 in San Marcos — a $7,362 swing that accounts for much of the overall gap. The two also differ in how much falls on water and sewer connection charges: $20,470 in Kyle versus $6,630 in San Marcos.
Keep comparing
Kyle vs San Marcos impact fees — FAQ
- Which has higher impact fees, Kyle or San Marcos?
- Kyle, TX is higher. A single-family home pays about $20,470 per unit in Kyle versus $7,074 in San Marcos, TX — $13,396 (189%) more, as of 2026.
- How much more does it cost to build a home in Kyle than in San Marcos?
- About $13,396 more per single-family home — $20,470 in Kyle, TX versus $7,074 in San Marcos, TX, a difference of 189% in total development impact and connection fees.
- What's the difference between impact fees in Kyle and San Marcos for a single-family home?
- Kyle, TX charges about $20,470 per single-family home ($0 impact + $20,470 water/sewer connection), while San Marcos, TX charges about $7,074 ($444 impact + $6,630 connection). Figures are normalized from official sources for 2026.