ImpactFeeAtlasCompare fees

Erie, CO vs St. George, UT: Development Impact Fees Compared (2026)

A single-family home pays about $94,679 in Erie vs $33,173 in St. George Erie is $61,506 (185%) higher. Every figure below is normalized per dwelling unit by category, with links to each jurisdiction’s official sources.

Town

Erie, CO

$94,679
Total per single-family home
impact + connection fees
$16,329
Impact / development fees
roads, parks, schools…
$78,350
Water & sewer connection
tap / capacity / SDC
$9,216
Per multifamily unit
total fees / unit

Impact / development fees

Fee (local term)BasisAmountSource · effective
Parks & recreation
Parks & Recreation Impact Fee
per dwelling unit$2,803Town of Erie, CO
Jan 1, 2026High
Police
Police Facilities Impact Fee
per dwelling unit$686Town of Erie, CO
Jan 1, 2026High
General government / capital
Public Facilities Impact Fee — General/municipal capital facilities impact fee.
per dwelling unit$4,276Town of Erie, CO
Jan 1, 2026High
Drainage / stormwater
Storm Drainage System Impact Fee
per dwelling unit$1,862Town of Erie, CO
Jan 1, 2026High
Transportation / roads
Transportation Facilities Impact Fee (standard area) — PRIMARY transportation rate; applies to property outside the Town Center PD and Historic Old Town (covers most new residential development).
per dwelling unit$6,402Town of Erie, CO
Jan 1, 2026High
Transportation / roads
Transportation Facilities Impact Fee (Town Center / Old Town) — Mutually-exclusive geographic variant (Town Center PD / Historic Old Town OTR/NMU/DT/MR zones); excluded from total in favor of the townwide standard rate. Verified verbatim on live 2026 page.
alternative · not added to total
per dwelling unit$4,546Town of Erie, CO
Jan 1, 2026High
Other
Tree Impact Fee — Per-dwelling-unit tree/urban-forestry impact fee; same $300 for all dwelling types (page shows 'All other dwelling units $300').
per dwelling unit$300Town of Erie, CO
Jan 1, 2026High

Water & sewer connection fees

Fee (local term)BasisAmountSource · effective
Water connection (tap / SDC)
Potable Water Tap Fee (3/4 inch residential) — Base 3/4" residential meter (typical single-family). Fees double for parcels outside Town limits. Confirmed by Ordinance 039-2024 ($17,290).
per meter$17,290Town of Erie, CO
Jan 1, 2026High
Water connection (tap / SDC)
Fee in Lieu of Water Dedication / Raw Water Fee (single-family residential) — SEPARATE, ADDITIVE one-time fee on top of the water tap fee (Ordinance 039-2024: 'separate and distinct fees'). Single largest residential charge. VERIFIED at $52,200 verbatim on the live 2026 fee schedule (sourceIndex 0). NOTE: Ordinance 039-2024 and the Water Dedication Guide state the 2025 fee-in-lieu was $31,400/SFE; the fee escalated to $52,200 for 2026. The 2026 amount is NOT supported by the Water Dedication Guide (which still shows $31,400) — confirmation rests on the live 2026 fee schedule only.
per dwelling unit$52,200Town of Erie, CO
Jan 1, 2026High
Sewer connection (tap / SDC)
Wastewater (Sewer) Tap Fee (3/4 inch) — Base 3/4" residential. Fees double for parcels outside Town limits. Confirmed by Ordinance 039-2024 ('Wastewater tap fee: ¾ inch 8,860.00').
per meter$8,860Town of Erie, CO
Jan 1, 2026High
Water connection (tap / SDC)
Potable Water Tap Fee (1 inch) — Larger meter variant; excluded in favor of the base 3/4" residential meter. Confirmed by Ordinance 039-2024.
alternative · not added to total
per meter$28,820Town of Erie, CO
Jan 1, 2026High
Sewer connection (tap / SDC)
Wastewater (Sewer) Tap Fee (1 inch) — Larger meter variant; excluded in favor of the base 3/4" residential meter. Confirmed by Ordinance 039-2024 ('1 inch 14,767.00').
alternative · not added to total
per meter$14,767Town of Erie, CO
Jan 1, 2026High
Erieimpact fees →
City

St. George, UT

$33,173
Total per single-family home
impact + connection fees
$12,172
Impact / development fees
roads, parks, schools…
$21,001
Water & sewer connection
tap / capacity / SDC
Per multifamily unit
total fees / unit

Impact / development fees

Fee (local term)BasisAmountSource · effective
Parks & recreation
Parks & Recreation Impact Fee — Per dwelling unit, single-family. Confirmed verbatim on 4/21/21 schedule.
per dwelling unit$4,525City of St. George, Utah
Apr 21, 2021Highdated 2021
Transportation / roads
Transportation Impact Fee — Per dwelling unit, single-family. Confirmed verbatim.
per dwelling unit$2,188City of St. George, Utah
Apr 21, 2021Highdated 2021
Police
Police Impact Fee (Residential) — Residential single-family per unit. Confirmed verbatim.
per dwelling unit$95City of St. George, Utah
Apr 21, 2021Highdated 2021
Fire / EMS
Fire/EMS Impact Fee (Residential) — Residential single-family per unit (Fire/EMS column). Confirmed verbatim.
per dwelling unit$320City of St. George, Utah
Apr 21, 2021Highdated 2021
Drainage / stormwater
Storm Drain (Drainage) Impact Fee (Residential) — Residential single-family per unit (Drainage column). Confirmed verbatim.
per dwelling unit$781City of St. George, Utah
Apr 21, 2021Highdated 2021
General government / capital
Electrical (Power) Impact Fee - Residential single-phase 100 AMP — St. George is a municipal power provider; residential single-phase 100 AMP service (typical SF) used as representative. Additive. Confirmed verbatim.
per meter$3,893City of St. George, Utah
Apr 21, 2021Highdated 2021
General government / capital
Electrical (Power) Impact Fee - Residential single-phase 200 AMP — 200 AMP residential single-phase tier, mutually exclusive with 100 AMP. Excluded.
alternative · not added to total
per meter$4,809City of St. George, Utah
Apr 21, 2021Highdated 2021
General government / capital
Power Meter Fee - Underground — Power meter fee, underground service. Additive. Confirmed verbatim.
per meter$370City of St. George, Utah
Apr 21, 2021Highdated 2021

Water & sewer connection fees

Fee (local term)BasisAmountSource · effective
Water connection (tap / SDC)
Culinary Water Impact Fee (City) - base 0.8" meter — City culinary water impact fee, smallest/base residential 0.8" meter. Separate from and additive to WCWCD regional water impact fee.
per meter$1,996City of St. George, Utah
Apr 21, 2021Highdated 2021
Water connection (tap / SDC)
Culinary Water Impact Fee (City) - 1.0" meter — Larger meter tier, mutually exclusive with 0.8" base. Excluded.
alternative · not added to total
per meter$4,311City of St. George, Utah
Apr 21, 2021Highdated 2021
Water connection (tap / SDC)
Culinary Water Connection Fee (City) - 0.8" meter, water on lot — Additive water connection fee (on-lot), base 0.8" meter. If water not on lot it is $1,207.
per meter$223City of St. George, Utah
Apr 21, 2021Highdated 2021
Water connection (tap / SDC)
Culinary Water Connection Fee (City) - 0.8" meter, water NOT on lot — Alternative to on-lot connection fee. Excluded (mutually exclusive with on-lot $223).
alternative · not added to total
per meter$1,207City of St. George, Utah
Apr 21, 2021Highdated 2021
Sewer connection (tap / SDC)
Local & Regional Wastewater Impact Fee (City) - base 0.8" meter — Total wastewater impact fee for base 0.8" meter = $137 local + $1,379 regional. Confirmed verbatim.
per meter$1,516City of St. George, Utah
Apr 21, 2021Highdated 2021
Sewer connection (tap / SDC)
Local & Regional Wastewater Impact Fee (City) - 1.0" meter — Larger meter tier, mutually exclusive with 0.8" base. Excluded.
alternative · not added to total
per meter$3,274City of St. George, Utah
Apr 21, 2021Highdated 2021
Water connection (tap / SDC)
WCWCD Regional Water Impact Fee (separate district) — SEPARATE DISTRICT FEE: Washington County Water Conservancy District regional water impact fee, $17,266 per ERC for a 3/4"/5/8" residential meter. Confirmed verbatim on the WCWCD page. Paid by builders in St. George IN ADDITION to the city culinary water impact fee. Reduced fee available under Ultra Water Efficiency Standards (amount not published). Confidence medium and effectiveDate cleared because the district page publishes no specific effective date or resolution number.
per meter$17,266Washington County Water Conservancy District
Medium
St. Georgeimpact fees →

What drives the difference

Erie’s $94,679 per single-family home is $61,506 (185%) above St. George’s $33,173. The largest single difference is in water connection (tap / sdc): Erie charges about $69,490 there versus $19,485 in St. George — a $50,005 swing that accounts for much of the overall gap. The two also differ in how much falls on water and sewer connection charges: $78,350 in Erie versus $21,001 in St. George.

Keep comparing

Erie vs St. George impact fees — FAQ

Which has higher impact fees, Erie or St. George?
Erie, CO is higher. A single-family home pays about $94,679 per unit in Erie versus $33,173 in St. George, UT — $61,506 (185%) more, as of 2026.
How much more does it cost to build a home in Erie than in St. George?
About $61,506 more per single-family home — $94,679 in Erie, CO versus $33,173 in St. George, UT, a difference of 185% in total development impact and connection fees.
What's the difference between impact fees in Erie and St. George for a single-family home?
Erie, CO charges about $94,679 per single-family home ($16,329 impact + $78,350 water/sewer connection), while St. George, UT charges about $33,173 ($12,172 impact + $21,001 connection). Figures are normalized from official sources for 2026.