ImpactFeeAtlasCompare fees

Erie, CO vs Osceola County, FL: Development Impact Fees Compared (2026)

A single-family home pays about $94,679 in Erie vs $48,161 in Osceola County Erie is $46,518 (97%) higher. Every figure below is normalized per dwelling unit by category, with links to each jurisdiction’s official sources.

Town

Erie, CO

$94,679
Total per single-family home
impact + connection fees
$16,329
Impact / development fees
roads, parks, schools…
$78,350
Water & sewer connection
tap / capacity / SDC
$9,216
Per multifamily unit
total fees / unit

Impact / development fees

Fee (local term)BasisAmountSource · effective
Parks & recreation
Parks & Recreation Impact Fee
per dwelling unit$2,803Town of Erie, CO
Jan 1, 2026High
Police
Police Facilities Impact Fee
per dwelling unit$686Town of Erie, CO
Jan 1, 2026High
General government / capital
Public Facilities Impact Fee — General/municipal capital facilities impact fee.
per dwelling unit$4,276Town of Erie, CO
Jan 1, 2026High
Drainage / stormwater
Storm Drainage System Impact Fee
per dwelling unit$1,862Town of Erie, CO
Jan 1, 2026High
Transportation / roads
Transportation Facilities Impact Fee (standard area) — PRIMARY transportation rate; applies to property outside the Town Center PD and Historic Old Town (covers most new residential development).
per dwelling unit$6,402Town of Erie, CO
Jan 1, 2026High
Transportation / roads
Transportation Facilities Impact Fee (Town Center / Old Town) — Mutually-exclusive geographic variant (Town Center PD / Historic Old Town OTR/NMU/DT/MR zones); excluded from total in favor of the townwide standard rate. Verified verbatim on live 2026 page.
alternative · not added to total
per dwelling unit$4,546Town of Erie, CO
Jan 1, 2026High
Other
Tree Impact Fee — Per-dwelling-unit tree/urban-forestry impact fee; same $300 for all dwelling types (page shows 'All other dwelling units $300').
per dwelling unit$300Town of Erie, CO
Jan 1, 2026High

Water & sewer connection fees

Fee (local term)BasisAmountSource · effective
Water connection (tap / SDC)
Potable Water Tap Fee (3/4 inch residential) — Base 3/4" residential meter (typical single-family). Fees double for parcels outside Town limits. Confirmed by Ordinance 039-2024 ($17,290).
per meter$17,290Town of Erie, CO
Jan 1, 2026High
Water connection (tap / SDC)
Fee in Lieu of Water Dedication / Raw Water Fee (single-family residential) — SEPARATE, ADDITIVE one-time fee on top of the water tap fee (Ordinance 039-2024: 'separate and distinct fees'). Single largest residential charge. VERIFIED at $52,200 verbatim on the live 2026 fee schedule (sourceIndex 0). NOTE: Ordinance 039-2024 and the Water Dedication Guide state the 2025 fee-in-lieu was $31,400/SFE; the fee escalated to $52,200 for 2026. The 2026 amount is NOT supported by the Water Dedication Guide (which still shows $31,400) — confirmation rests on the live 2026 fee schedule only.
per dwelling unit$52,200Town of Erie, CO
Jan 1, 2026High
Sewer connection (tap / SDC)
Wastewater (Sewer) Tap Fee (3/4 inch) — Base 3/4" residential. Fees double for parcels outside Town limits. Confirmed by Ordinance 039-2024 ('Wastewater tap fee: ¾ inch 8,860.00').
per meter$8,860Town of Erie, CO
Jan 1, 2026High
Water connection (tap / SDC)
Potable Water Tap Fee (1 inch) — Larger meter variant; excluded in favor of the base 3/4" residential meter. Confirmed by Ordinance 039-2024.
alternative · not added to total
per meter$28,820Town of Erie, CO
Jan 1, 2026High
Sewer connection (tap / SDC)
Wastewater (Sewer) Tap Fee (1 inch) — Larger meter variant; excluded in favor of the base 3/4" residential meter. Confirmed by Ordinance 039-2024 ('1 inch 14,767.00').
alternative · not added to total
per meter$14,767Town of Erie, CO
Jan 1, 2026High
Erieimpact fees →
County

Osceola County, FL

$48,161
Total per single-family home
impact + connection fees
$37,718
Impact / development fees
roads, parks, schools…
$10,443
Water & sewer connection
tap / capacity / SDC
$27,626
Per multifamily unit
total fees / unit

Impact / development fees

Fee (local term)BasisAmountSource · effective
Transportation / roads
Mobility Fee (Transportation) - Single-Family (countywide base CMP area) — Countywide base CMP (Capacity Management Plan) area mobility fee; columns are Single-Family / Mobile Home / Multi-Family Rental / Multi-Family Condo / Townhouse. Used as PRIMARY single-family mobility row. Mutually-exclusive sub-area variants are excluded below. VERIFIED against archived official county PDF.
per dwelling unit$21,710Osceola County, FL (Impact and Mobility Fees Office)
Jun 20, 2025High
Schools
School (Educational System) Impact Fee - Single-Family — Educational system impact fee adopted under Osceola County Code Chapter 24, Article III; collected by the County for school facilities. Identical across all CMP service areas. Columns: Single-Family / Mobile Home / Multi-Family Rental / Multi-Family Condo / Townhouse. VERIFIED.
per dwelling unit$12,923Osceola County, FL (Impact and Mobility Fees Office)
Jun 20, 2025High
Parks & recreation
Park Impact Fee - Single-Family — Identical across all CMP service areas. VERIFIED.
per dwelling unit$2,305Osceola County, FL (Impact and Mobility Fees Office)
Jun 20, 2025High
Fire / EMS
Fire/Rescue Impact Fee - Single-Family — Fire rescue impact fee (Chapter 24, Article V). Identical across all CMP service areas. VERIFIED.
per dwelling unit$780Osceola County, FL (Impact and Mobility Fees Office)
Jun 20, 2025High
Transportation / roads
Mobility Fee - Single-Family (East of Lake Toho CMP Area) [VARIANT] — Mutually-exclusive geographic variant of the single-family mobility fee for the East of Lake Toho CMP service area. Excluded from total; countywide base $21,710.14 is primary. VERIFIED.
alternative · not added to total
per dwelling unit$20,654Osceola County, FL (Impact and Mobility Fees Office)
Jun 20, 2025High
Transportation / roads
Mobility Fee - Single-Family (South Lake Toho CMP Area) [VARIANT] — Mutually-exclusive geographic variant of the single-family mobility fee for the South Lake Toho CMP service area. Excluded from total. VERIFIED.
alternative · not added to total
per dwelling unit$20,014Osceola County, FL (Impact and Mobility Fees Office)
Jun 20, 2025High
Transportation / roads
Mobility Fee - Single-Family (Alligator Chain of Lakes CMP Area) [VARIANT] — Mutually-exclusive geographic variant of the single-family mobility fee for the Alligator Chain of Lakes CMP service area. Excluded from total. VERIFIED.
alternative · not added to total
per dwelling unit$21,347Osceola County, FL (Impact and Mobility Fees Office)
Jun 20, 2025High

Water & sewer connection fees

Fee (local term)BasisAmountSource · effective
Water connection (tap / SDC)
Toho Water Authority - Water System Development Charge (SDC), 3/4" meter — Toho Water Authority (utility serving Osceola County) Water SDC for the standard residential 3/4" meter. Separate special district / utility authority fee a builder must pay. PRIMARY meter size; larger meters are mutually-exclusive variants (excluded below). VERIFIED in Appendix A PDF.
per meter$6,650Toho Water Authority
May 5, 2025High
Sewer connection (tap / SDC)
Toho Water Authority - Wastewater/Sewer System Development Charge (SDC), 3/4" meter — Toho Water Authority Wastewater SDC for the standard residential 3/4" meter. Combined water+wastewater SDC = $9,943 per ERU at the 3/4" meter. Separate special district / utility authority fee. VERIFIED in Appendix A PDF.
per meter$3,293Toho Water Authority
May 5, 2025High
Water connection (tap / SDC)
Toho Water Authority - Water meter installation fee, 3/4" meter — Meter installation/set fee, additive to the water SDC for a new 3/4" residential connection. INDEPENDENTLY VERIFIED on the Toho Development Fees page AND in the Appendix A PDF (sourceIndex 1: '3/4" Potable Meter with dual check $500.00'). Confidence upgraded medium->high.
per meter$500Toho Water Authority
May 5, 2025High
Sewer connection (tap / SDC)
Toho Water Authority - Sanitary sewer tap fee — Wastewater tap fee, additive to the sewer SDC where a new tap is required. INDEPENDENTLY VERIFIED on the Toho Development Fees page; confidence upgraded medium->high. A separate sanitary lateral ($4,800) and sanitary connection ($150) may also apply depending on connection scope.
$2,250Toho Water Authority
May 5, 2025High
Water connection (tap / SDC)
Toho Water Authority - Water SDC, 1" meter [VARIANT] — Mutually-exclusive meter-size variant. Standard residential uses 3/4" meter (primary). Wastewater SDC at 1" meter is $5,499. VERIFIED in Appendix A PDF.
alternative · not added to total
per meter$11,106Toho Water Authority
May 5, 2025High
Water connection (tap / SDC)
Toho Water Authority - Water SDC, 2" meter [VARIANT] — Mutually-exclusive meter-size variant (Water SDC $35,445 / Wastewater SDC $17,552 at 2" meter). All meters above 2" subject to individual capacity analysis. 3/4" meter is primary. VERIFIED in Appendix A PDF.
alternative · not added to total
per meter$35,445Toho Water Authority
May 5, 2025High
Osceola Countyimpact fees →

What drives the difference

Erie’s $94,679 per single-family home is $46,518 (97%) above Osceola County’s $48,161. The largest single difference is in water connection (tap / sdc): Erie charges about $69,490 there versus $7,150 in Osceola County — a $62,340 swing that accounts for much of the overall gap. The two also differ in how much falls on water and sewer connection charges: $78,350 in Erie versus $10,443 in Osceola County.

Keep comparing

Erie vs Osceola County impact fees — FAQ

Which has higher impact fees, Erie or Osceola County?
Erie, CO is higher. A single-family home pays about $94,679 per unit in Erie versus $48,161 in Osceola County, FL — $46,518 (97%) more, as of 2026.
How much more does it cost to build a home in Erie than in Osceola County?
About $46,518 more per single-family home — $94,679 in Erie, CO versus $48,161 in Osceola County, FL, a difference of 97% in total development impact and connection fees.
What's the difference between impact fees in Erie and Osceola County for a single-family home?
Erie, CO charges about $94,679 per single-family home ($16,329 impact + $78,350 water/sewer connection), while Osceola County, FL charges about $48,161 ($37,718 impact + $10,443 connection). Figures are normalized from official sources for 2026.