Erie, CO vs Greeley, CO: Development Impact Fees Compared (2026)

A single-family home pays about $94,679 in Erie vs $46,126 in Greeley Erie is $48,553 (105%) higher. Every figure below is normalized per dwelling unit by category, with links to each jurisdiction’s official sources.

Town

Erie, CO

$94,679
Total per single-family home
impact + connection fees
$16,329
Impact / development fees
roads, parks, schools…
$78,350
Water & sewer connection
tap / capacity / SDC
$9,216
Per multifamily unit
total fees / unit

Impact / development fees

Fee (local term)BasisAmountSource · effective
Parks & recreation
Parks & Recreation Impact Fee
per dwelling unit$2,803Town of Erie, CO
Jan 1, 2026High
Police
Police Facilities Impact Fee
per dwelling unit$686Town of Erie, CO
Jan 1, 2026High
General government / capital
Public Facilities Impact Fee — General/municipal capital facilities impact fee.
per dwelling unit$4,276Town of Erie, CO
Jan 1, 2026High
Drainage / stormwater
Storm Drainage System Impact Fee
per dwelling unit$1,862Town of Erie, CO
Jan 1, 2026High
Transportation / roads
Transportation Facilities Impact Fee (standard area) — PRIMARY transportation rate; applies to property outside the Town Center PD and Historic Old Town (covers most new residential development).
per dwelling unit$6,402Town of Erie, CO
Jan 1, 2026High
Transportation / roads
Transportation Facilities Impact Fee (Town Center / Old Town) — Mutually-exclusive geographic variant (Town Center PD / Historic Old Town OTR/NMU/DT/MR zones); excluded from total in favor of the townwide standard rate. Verified verbatim on live 2026 page.
alternative · not added to total
per dwelling unit$4,546Town of Erie, CO
Jan 1, 2026High
Other
Tree Impact Fee — Per-dwelling-unit tree/urban-forestry impact fee; same $300 for all dwelling types (page shows 'All other dwelling units $300').
per dwelling unit$300Town of Erie, CO
Jan 1, 2026High

Water & sewer connection fees

Fee (local term)BasisAmountSource · effective
Water connection (tap / SDC)
Potable Water Tap Fee (3/4 inch residential) — Base 3/4" residential meter (typical single-family). Fees double for parcels outside Town limits. Confirmed by Ordinance 039-2024 ($17,290).
per meter$17,290Town of Erie, CO
Jan 1, 2026High
Water connection (tap / SDC)
Fee in Lieu of Water Dedication / Raw Water Fee (single-family residential) — SEPARATE, ADDITIVE one-time fee on top of the water tap fee (Ordinance 039-2024: 'separate and distinct fees'). Single largest residential charge. VERIFIED at $52,200 verbatim on the live 2026 fee schedule (sourceIndex 0). NOTE: Ordinance 039-2024 and the Water Dedication Guide state the 2025 fee-in-lieu was $31,400/SFE; the fee escalated to $52,200 for 2026. The 2026 amount is NOT supported by the Water Dedication Guide (which still shows $31,400) — confirmation rests on the live 2026 fee schedule only.
per dwelling unit$52,200Town of Erie, CO
Jan 1, 2026High
Sewer connection (tap / SDC)
Wastewater (Sewer) Tap Fee (3/4 inch) — Base 3/4" residential. Fees double for parcels outside Town limits. Confirmed by Ordinance 039-2024 ('Wastewater tap fee: ¾ inch 8,860.00').
per meter$8,860Town of Erie, CO
Jan 1, 2026High
Water connection (tap / SDC)
Potable Water Tap Fee (1 inch) — Larger meter variant; excluded in favor of the base 3/4" residential meter. Confirmed by Ordinance 039-2024.
alternative · not added to total
per meter$28,820Town of Erie, CO
Jan 1, 2026High
Sewer connection (tap / SDC)
Wastewater (Sewer) Tap Fee (1 inch) — Larger meter variant; excluded in favor of the base 3/4" residential meter. Confirmed by Ordinance 039-2024 ('1 inch 14,767.00').
alternative · not added to total
per meter$14,767Town of Erie, CO
Jan 1, 2026High
Erieimpact fees →
City

Greeley, CO

$46,126
Total per single-family home
impact + connection fees
$19,726
Impact / development fees
roads, parks, schools…
$26,400
Water & sewer connection
tap / capacity / SDC
Per multifamily unit
total fees / unit

Impact / development fees

Fee (local term)BasisAmountSource · effective
Transportation / roads
Transportation Development Impact Fee — VERIFIED 2026-06-17 against source 0; row reads 'Residential 1,801 square feet or more of heated living space ... 2025 Fee $8,609'. City impact fee is tiered by heated living space, not by land-use type. Representative single-family row uses the largest tier (1,801+ sq ft), typical for a 2,000-2,500 sq ft home. Effective March 1, 2025 - Feb 29, 2026.
per dwelling unit$8,609City of Greeley, Colorado - Finance Department
Mar 1, 2025High
Parks & recreation
Park Development Impact Fee — VERIFIED 2026-06-17 against source 0 (Park Development Fee, 1,801+ tier = $6,449). 1,801+ sq ft tier (representative SFD). Tiered by heated living space.
per dwelling unit$6,449City of Greeley, Colorado - Finance Department
Mar 1, 2025High
Open space
Trails Development Impact Fee — VERIFIED 2026-06-17 against source 0 (Trails Development Fee, 1,801+ tier = $967). Greeley levies a separate Trails impact fee (trail/open-space network). 1,801+ sq ft tier.
per dwelling unit$967City of Greeley, Colorado - Finance Department
Mar 1, 2025High
Fire / EMS
Fire Development Impact Fee — VERIFIED 2026-06-17 against source 0 (Fire Development Fee, 1,801+ tier = $869). 1,801+ sq ft tier (representative SFD).
per dwelling unit$869City of Greeley, Colorado - Finance Department
Mar 1, 2025High
Police
Police Development Impact Fee — VERIFIED 2026-06-17 against source 0 (Police Development Fee, 1,801+ tier = $334). 1,801+ sq ft tier (representative SFD).
per dwelling unit$334City of Greeley, Colorado - Finance Department
Mar 1, 2025High
Drainage / stormwater
Storm Drainage Development Impact Fee — VERIFIED 2026-06-17 against source 0 (Storm Drainage Development Fee, Impervious Area, Per Impervious Square Foot, 2024 $0.292 +7.88% = 2025 $0.315). Charged per impervious square foot of the site, NOT a flat per-dwelling-unit amount; excluded from the per-unit total. The 2026 Water/Sewer Rate Manual narrative still cited $0.29/sq ft; the 2025 official impact-fee schedule computed $0.315 for 2025. excludeFromTotal flag confirmed correct.
alternative · not added to total
per sq ft$0.32City of Greeley, Colorado - Finance Department
Mar 1, 2025High
Schools
School Land Dedication Fee-in-Lieu (Greeley-Evans School District 6) — VERIFIED 2026-06-17 against source 4 (Figure 6, Scenario #8, A5 Cost Per Unit by Level - SFD = $2,498.02) AND independently against source 5 (NoCo Optimist: single-family detached $2,498). Fee-in-lieu of land dedication for Weld County School District 6, adopted via City Council intergovernmental agreement approved June 2025 (5-2 vote confirmed in source 5). Developer may dedicate 0.0159 acres/unit instead of paying. This is NOT a school impact fee (CO does not authorize one) but a developer school-land obligation a Greeley residential builder must satisfy. Underlying study internally dated 1/12/2020; effectiveDate reflects June 2025 IGA adoption; medium confidence retained.
per dwelling unit$2,498Greeley-Evans School District 6 / Western Demographics, Inc.
Jun 1, 2025Medium

Water & sewer connection fees

Fee (local term)BasisAmountSource · effective
Water connection (tap / SDC)
Water Plant Investment Fee (PIF) - 3/4-inch tap — VERIFIED 2026-06-17 against source 1 (2026 Rate Manual PIF table: 3/4" -> Water PIF $16,900.00). Base residential 3/4-inch tap; representative for single-family. For SF lots the PIF is a proportion of the tap-size value by lot size/irrigation - a Standard Lot (6,000-13,000 s.f.) at potable irrigation = 100% = full $16,900 (confirmed in residential proportion table). Table header in PDF printed 'March 1, 2025 - Feb 28 2026' but values are the updated 2026-manual figures (2025 manual source 2 showed $15,000).
per meter$16,900City of Greeley Water & Sewer Department
Jan 1, 2026High
Sewer connection (tap / SDC)
Sewer/Wastewater Plant Investment Fee (PIF) - 3/4-inch tap — VERIFIED 2026-06-17 against source 1 (2026 Rate Manual PIF table: 3/4" -> Sewer PIF $9,500.00). Base residential 3/4-inch tap (2025 manual source 2 showed $8,650).
per meter$9,500City of Greeley Water & Sewer Department
Jan 1, 2026High
Water connection (tap / SDC)
Raw Water Dedication - Cash-in-Lieu — VERIFIED 2026-06-17 against source 1 (2026 Rate Manual, Cash-In-Lieu section: 'The cash-in-lieu of raw water fee is $57,000 per acre-foot of water'). PER ACRE-FOOT, not per dwelling unit. New residential development must dedicate 3 acre-feet of native water per ACRE of land (or pay cash-in-lieu). On a per-acre basis this is ~3 x $57,000 = ~$171,000/acre of residential land - a very large but land-area-driven cost. Excluded from per-unit total because it is not a flat per-DU amount. excludeFromTotal flag confirmed correct.
alternative · not added to total
per acre$57,000City of Greeley Water & Sewer Department
Jan 1, 2026High
Water connection (tap / SDC)
Water Plant Investment Fee (PIF) - 1-inch tap — VERIFIED 2026-06-17 against source 1 (2026 Rate Manual PIF table: 1" -> Water PIF $28,200.00). Larger-meter variant of water PIF; 3/4-inch is the base residential primary. Mutually exclusive by meter size. excludeFromTotal correct.
alternative · not added to total
per meter$28,200City of Greeley Water & Sewer Department
Jan 1, 2026High
Sewer connection (tap / SDC)
Sewer Plant Investment Fee (PIF) - 1-inch tap — VERIFIED 2026-06-17 against source 1 (2026 Rate Manual PIF table: 1" -> Sewer PIF $15,100.00). Larger-meter variant; 3/4-inch is the base residential primary. Mutually exclusive by meter size. excludeFromTotal correct.
alternative · not added to total
per meter$15,100City of Greeley Water & Sewer Department
Jan 1, 2026High
Greeleyimpact fees →

What drives the difference

Erie’s $94,679 per single-family home is $48,553 (105%) above Greeley’s $46,126. The largest single difference is in water connection (tap / sdc): Erie charges about $69,490 there versus $16,900 in Greeley — a $52,590 swing that accounts for much of the overall gap. The two also differ in how much falls on water and sewer connection charges: $78,350 in Erie versus $26,400 in Greeley.

Keep comparing

Erie vs Greeley impact fees — FAQ

Which has higher impact fees, Erie or Greeley?
Erie, CO is higher. A single-family home pays about $94,679 per unit in Erie versus $46,126 in Greeley, CO — $48,553 (105%) more, as of 2026.
How much more does it cost to build a home in Erie than in Greeley?
About $48,553 more per single-family home — $94,679 in Erie, CO versus $46,126 in Greeley, CO, a difference of 105% in total development impact and connection fees.
What's the difference between impact fees in Erie and Greeley for a single-family home?
Erie, CO charges about $94,679 per single-family home ($16,329 impact + $78,350 water/sewer connection), while Greeley, CO charges about $46,126 ($19,726 impact + $26,400 connection). Figures are normalized from official sources for 2026.