Draper, UT vs Salt Lake City, UT: Development Impact Fees Compared (2026)
A single-family home pays about $14,661 in Draper vs $8,248 in Salt Lake City — Draper is $6,413 (78%) higher. Every figure below is normalized per dwelling unit by category, with links to each jurisdiction’s official sources.
City
Draper, UT
$14,661
Total per single-family home
impact + connection fees
$5,487
Impact / development fees
roads, parks, schools…
$9,174
Water & sewer connection
tap / capacity / SDC
—
Per multifamily unit
total fees / unit
Impact / development fees
| Fee (local term) | Basis | Amount | Source · effective |
|---|---|---|---|
Fire / EMS Fire Impact Fee — Draper City fire impact fee. Multifamily is $75.00/unit; commercial $97/KSF, office $47/KSF, industrial $5/KSF. VERIFIED verbatim from Resolution 25-52 fee schedule (PDF line 238). | per dwelling unit | $71 | Draper City Oct 1, 2025High |
Parks & recreation Parks & Recreation Impact Fee — Draper City parks impact fee, tiered by density. SFD detached = $4,162. VERIFIED verbatim (PDF line 243). | per dwelling unit | $4,162 | Draper City Oct 1, 2025High |
Police Police Facilities Impact Fee — Draper City police impact fee. Multifamily $75/unit; commercial $130/KSF, office $46/KSF, industrial $21/KSF. VERIFIED verbatim (PDF line 249). | per dwelling unit | $102 | Draper City Oct 1, 2025High |
Transportation / roads Transportation Facilities Impact Fee — Draper City transportation/roads impact fee. Multifamily $893/unit. VERIFIED verbatim (PDF line 254). | per dwelling unit | $1,152 | Draper City Oct 1, 2025High |
Drainage / stormwater Storm Water Facilities Impact Fee (per ERU) — COLLECTION SUSPENDED — Draper City storm water impact fee is $1,729.00 per ERU on the books, but COLLECTION IS TEMPORARILY SUSPENDED per Ordinance 1480 — a builder currently pays $0 for this. Listed for completeness and excluded from the active total. VERIFIED verbatim (PDF lines above row 273). alternative · not added to total | per dwelling unit | $1,729 | Draper City Jan 1, 2018Highdated 2018 |
Water & sewer connection fees
| Fee (local term) | Basis | Amount | Source · effective |
|---|---|---|---|
Water connection (tap / SDC) Water System Facilities Impact Fee (SFD per unit / 3/4" meter) — Draper City culinary water impact fee (Res 18-19). SFD per unit = base 3/4" meter equivalent ($2,097). 'All other housing types (per unit)' = $1,606. Non-residential is priced by meter size (0.75"=$2,097, 1"=$3,501, 1.5"=$6,982, 2"=$11,175, etc.); non-standard = ERC count x $2,097. Applies where the City of Draper provides water; part of Draper is served by WaterPro (separate provider) with its own fees. VERIFIED verbatim (PDF line 261). | per dwelling unit | $2,097 | Draper City Jan 1, 2018Highdated 2018 |
Water connection (tap / SDC) Water System Hookup (Connection) Fee — 3/4" connection — ADDITIVE physical water hookup fee on top of the water impact fee (PDF: 'Hookup fees are in addition to Water System Facilities Impact Fees'). 3/4" residential meter = $440 (1"=$475, 1.5"=$665, 2"=$810; larger paid directly to installation contractor). VERIFIED verbatim (PDF lines 481, 485). | per meter | $440 | Draper City Oct 1, 2025High |
Sewer connection (tap / SDC) Sewer Impact Fee — Jordan Basin Improvement District, Service Area 1 (separate district) — SEPARATE DISTRICT fee. Draper does NOT levy its own sewer impact fee — sanitary sewer is provided by the Jordan Basin Improvement District (JBID). Most of Draper lies in Salt Lake County = JBID Service Area 1, where the SFD impact fee is $6,637.31 (per current live JBID utility fee schedule). A builder in Draper pays this to JBID. VERIFIED verbatim from JBID fee schedule. | per dwelling unit | $6,637 | Jordan Basin Improvement District —High |
Sewer connection (tap / SDC) Sewer Impact Fee — JBID Service Area 3 (Suncrest/Utah County portion of Draper, remitted to TSSD) — Applies ONLY to the Suncrest portion of Draper in Utah County (JBID Service Area 3), where effluent flows to the Timpanogos Special Service District; fee is remitted to TSSD. This is a MUTUALLY-EXCLUSIVE geographic service-area alternative to the Service Area 1 fee — most Draper builders pay the Service Area 1 fee ($6,637.31). Excluded from the representative SFD total. VERIFIED. alternative · not added to total | per dwelling unit | $5,793 | Jordan Basin Improvement District —High |
Sewer connection (tap / SDC) Sewer Lateral Connection Fee — JBID (4" in asphalt, separate district) — ADDITIVE JBID lateral/connection fee where the District installs the lateral from the main to the property line. Representative 4" lateral in asphalt = $3,600 (4" out of asphalt $3,100; 6" in asphalt $4,500; 6" out of asphalt $4,300). Charged only when the District installs the lateral; a builder may install its own. Excluded from the per-unit impact-fee total since it is a conditional physical-installation charge, not a uniform impact fee. VERIFIED. alternative · not added to total | per meter | $3,600 | Jordan Basin Improvement District —High |
City
Salt Lake City, UT
$8,248
Total per single-family home
impact + connection fees
$5,832
Impact / development fees
roads, parks, schools…
$2,416
Water & sewer connection
tap / capacity / SDC
$3,959
Per multifamily unit
total fees / unit
Impact / development fees
| Fee (local term) | Basis | Amount | Source · effective |
|---|---|---|---|
Fire / EMS Fire impact fee — Impact Fees table, Single Family column. City Code 18.98.160. Confirmed in adopted CFS PDF and 2016 General Fund IFFP/IFA. | per dwelling unit | $171 | Salt Lake City Corporation Jan 29, 2026High |
Parks & recreation Parks & Public Lands impact fee — Single Family column. Parks impact fee applies to residential only ($0 for office/industrial/commercial). Confirmed in adopted CFS PDF and 2016 IFFP/IFA. | per dwelling unit | $5,173 | Salt Lake City Corporation Jan 29, 2026High |
Police Police impact fee — Single Family column. City Code 18.98.160. Confirmed in adopted CFS PDF and 2016 IFFP/IFA. | per dwelling unit | $59 | Salt Lake City Corporation Jan 29, 2026High |
Transportation / roads Transportation/roads impact fee — Single Family column. City Code 18.98.090. Confirmed in adopted CFS PDF and in the 2020 Transportation IFFP/IFA ('Single family house ... dwelling $429'). | per dwelling unit | $429 | Salt Lake City Corporation Jan 29, 2026High |
Drainage / stormwater Storm water / drainage impact fee — One-time drainage/storm-water impact fee: $374 per 1/4 acre, rounded up (§17.81.400). A typical single-family lot under 1/4 acre rounds up to one increment = $374. Parcel/area-based, not strictly per unit. Confirmed in adopted CFS PDF (Impact Fees table and Storm Water section). unitBasis per_acre is the closest enum to the actual per-1/4-acre basis. | per acre | $374 | Salt Lake City Corporation Jan 29, 2026High |
Water & sewer connection fees
| Fee (local term) | Basis | Amount | Source · effective |
|---|---|---|---|
Water connection (tap / SDC) Water connection fee (single-family, 3/4-inch meter, City rate) — City Connection Fee for a residential single-family 3/4-inch meter (base residential meter), §17.16.040. County Connection Fee for the same is $1,952. Meter hardware & installation billed separately at actual cost (not included). Confirmed in adopted CFS PDF Water Connection Fees table. | per meter | $1,871 | Salt Lake City Corporation Jan 29, 2026High |
Water connection (tap / SDC) Water connection fee (single-family, 3/4-inch, County rate) — alternate — County Connection Fee variant for the 3/4-inch SF meter; applies to SLC Public Utilities customers in unincorporated/county service area, not inside city limits. Excluded as mutually-exclusive alternate to the City rate. Confirmed in adopted CFS PDF. alternative · not added to total | per meter | $1,952 | Salt Lake City Corporation Jan 29, 2026High |
Water connection (tap / SDC) Water connection fee (single-family, 1-inch meter, City rate) — alternate tier — City Connection Fee for a 1-inch single-family meter; larger-meter alternate to the base 3/4-inch. County rate $3,494. Excluded as alternate meter-size tier. Confirmed in adopted CFS PDF. alternative · not added to total | per meter | $3,297 | Salt Lake City Corporation Jan 29, 2026High |
Sewer connection (tap / SDC) Sanitary sewer connection fee (single dwelling) — Sanitary sewer connection fee on new development, residential single dwelling, §17.72.030. Includes condominiums and twin homes. Confirmed in adopted CFS PDF, 'Connection fees on new development property'. | per dwelling unit | $545 | Salt Lake City Corporation Jan 29, 2026High |
What drives the difference
Draper’s $14,661 per single-family home is $6,413 (78%) above Salt Lake City’s $8,248. The largest single difference is in sewer connection (tap / sdc): Draper charges about $6,637 there versus $545 in Salt Lake City — a $6,092 swing that accounts for much of the overall gap. The two also differ in how much falls on water and sewer connection charges: $9,174 in Draper versus $2,416 in Salt Lake City.
Keep comparing
Draper vs Salt Lake City impact fees — FAQ
- Which has higher impact fees, Draper or Salt Lake City?
- Draper, UT is higher. A single-family home pays about $14,661 per unit in Draper versus $8,248 in Salt Lake City, UT — $6,413 (78%) more, as of 2026.
- How much more does it cost to build a home in Draper than in Salt Lake City?
- About $6,413 more per single-family home — $14,661 in Draper, UT versus $8,248 in Salt Lake City, UT, a difference of 78% in total development impact and connection fees.
- What's the difference between impact fees in Draper and Salt Lake City for a single-family home?
- Draper, UT charges about $14,661 per single-family home ($5,487 impact + $9,174 water/sewer connection), while Salt Lake City, UT charges about $8,248 ($5,832 impact + $2,416 connection). Figures are normalized from official sources for 2026.