Conroe, TX vs Leander, TX: Development Impact Fees Compared (2026)
A single-family home pays about $3,750 in Conroe vs $16,912 in Leander — Leander is $13,162 (351%) higher. Every figure below is normalized per dwelling unit by category, with links to each jurisdiction’s official sources.
City
Conroe, TX
$3,750
Total per single-family home
impact + connection fees
$0
Impact / development fees
roads, parks, schools…
$3,750
Water & sewer connection
tap / capacity / SDC
—
Per multifamily unit
total fees / unit
Impact / development fees
| Fee (local term) | Basis | Amount | Source · effective |
|---|---|---|---|
Mitigation Tree mitigation payment in lieu of preservation/planting — VERIFIED verbatim against Exhibit I (Chapter 102 Vegetation): line '102-32 Mitigation payment in lieu of preservation. Cost per square foot. $5.00'. Charged per square foot of additional canopy, payable only if a variance from tree preservation/planting is granted — conditional/situational, not a flat per-dwelling charge. Correctly excluded from total. Confidence held at medium per the researcher's noted $5.00 (Exhibit/Appendix A) vs $3.50 (ordinance body text) discrepancy; the codified Appendix A Exhibit value of $5.00 is used. alternative · not added to total | per sq ft | $5 | City of Conroe, Texas Nov 13, 2025Medium |
Water & sewer connection fees
| Fee (local term) | Basis | Amount | Source · effective |
|---|---|---|---|
Water connection (tap / SDC) Water tap fee (3/4" meter, standard residential) — VERIFIED verbatim against Exhibit D (Chapter 70 Proposed Tap Fees), City of Conroe Appendix A Fee Schedule adopted by Ord. No. 2759-25, eff. 11-13-2025. The 3/4" tap is the standard residential water service connection and is the representative single-family row. Included in per-DU total. | per meter | $1,875 | City of Conroe, Texas Nov 13, 2025High |
Sewer connection (tap / SDC) Sewer tap fee (4" tap, standard residential) — VERIFIED verbatim against Exhibit D (Chapter 70), Ord. No. 2759-25, eff. 11-13-2025. 4" is the standard residential sewer tap. One-time connection charge, effectively per dwelling unit for a typical single-family home. Included in per-DU total (water $1,875 + sewer $1,875 = $3,750, no double-counting). | per meter | $1,875 | City of Conroe, Texas Nov 13, 2025High |
Water connection (tap / SDC) Water tap fee — 1" meter — VERIFIED verbatim against Exhibit D. Alternative (larger) meter size; mutually exclusive with the primary 3/4" residential tap. Correctly excluded from total. alternative · not added to total | per meter | $2,000 | City of Conroe, Texas Nov 13, 2025High |
City
Leander, TX
$16,912
Total per single-family home
impact + connection fees
$4,159
Impact / development fees
roads, parks, schools…
$12,753
Water & sewer connection
tap / capacity / SDC
—
Per multifamily unit
total fees / unit
Impact / development fees
| Fee (local term) | Basis | Amount | Source · effective |
|---|---|---|---|
Transportation / roads Roadway Impact Fee (collected, residential 50% of max; Service Area D representative) — REPRESENTATIVE value (Service Area D). VERIFIED: the study's sample calculation (Example 1) confirms SF detached = 4.04 veh-mi/DU x Service Area D $1,229 = $4,965.16 maximum assessable. Max fee per service unit by area VERIFIED from Table 8: A $2,179, B $842, C $929, D $1,229, E $287. The 50% residential collection rate (10% nonresidential) is NOT in the fee-study PDF; it is corroborated by a web search and the citizenportal council-workshop coverage (source 4 was HTTP 403 on direct fetch, confirmed via search-engine snippet). Shown amount = 50% of SA D max ($4,965.16 x 0.50 = $2,482.58). Collected by area at 50%: A $4,401.58, B $1,700.84, C $1,876.58, D $2,482.58, E $579.74. Confidence MEDIUM: collection rate from a secondary source and the city was actively considering raising it (to phase out the separate Roadway Adequacy Payment) as of mid-2025. Verify exact service area + current collection rate at building permit. | per dwelling unit | $2,483 | City of Leander, TX (prepared by Kimley-Horn) Dec 1, 2023Medium |
Transportation / roads Roadway Impact Fee MAXIMUM assessable (Service Area D) — VERIFIED exactly against the study sample calculation (Example 1, Service Area D): 'Impact Fee = 1 * 4.04 * $1,229 ... Maximum Assessable Impact Fee = $4,965.16.' This is the MAXIMUM assessable (not what is collected); actual residential collection is 50% of this (see collected row). excludeFromTotal=true is correct to avoid double-counting with the collected roadway row. alternative · not added to total | per dwelling unit | $4,965 | City of Leander, TX (prepared by Kimley-Horn) Dec 1, 2023High |
Parks & recreation Fee-in-Lieu of Parkland (Williamson County) — VERIFIED exactly against the downloaded Concept Plan Submittal Packet PDF (text extracted via pdftotext): 'Parkland is calculated as 7.5 acres per each 100 dwelling units. A payment of fee in lieu of parkland is an option at a rate of $1,676.60 for Williamson County or $2,355.13 for Travis County.' NOT a Chapter 395 impact fee - this is a parkland dedication / fee-in-lieu requirement under the city's subdivision/parks authority for residential developments (developer may dedicate 7.5 ac/100 DU OR pay this per-unit fee). Leander is primarily in Williamson County, so $1,676.60/DU is the applicable primary rate. Park improvements (up to 50%) may also be required separately. | per dwelling unit | $1,677 | City of Leander, TX Oct 9, 2025High |
Parks & recreation Fee-in-Lieu of Parkland (Travis County portion) — VERIFIED exactly against the Concept Plan Submittal Packet PDF. Mutually exclusive county variant; applies only to the Travis County ETJ portion of Leander's jurisdiction. Williamson County rate ($1,676.60) used as primary since Leander is primarily in Williamson County. excludeFromTotal=true is correct. alternative · not added to total | per dwelling unit | $2,355 | City of Leander, TX Oct 9, 2025High |
Water & sewer connection fees
| Fee (local term) | Basis | Amount | Source · effective |
|---|---|---|---|
Water connection (tap / SDC) Water Impact (Capital Recovery) Fee — VERIFIED directly against Municode Sec. 13.07.009 (browser-rendered): '(2) Water: $8,762.00.' Adopted by Ord. No. 23-044-00, sec. 4 (eff. 8/17/2023). Per LUE (living unit equivalent); one single-family detached residence of average size = 1.0 LUE, so $8,762 per home. The code expressly states the impact fee 'shall be charged in addition to all other fees... including... building permit fees and tap fees,' so this is additive to the water tap fee. | per dwelling unit | $8,762 | City of Leander, TX (Municode Library) Aug 17, 2023High |
Sewer connection (tap / SDC) Wastewater Impact (Capital Recovery) Fee — VERIFIED directly against Municode Sec. 13.07.009 (browser-rendered): '(1) Wastewater: $2,301.00.' Per LUE; SF detached = 1.0 LUE = $2,301 per home. Combined code water+wastewater = $11,063 per LUE (note: a July 2023 Community Impact news article reported the combined figure as $11,064.73/LUE; the code itself lists exactly $8,762 + $2,301, so $11,063 is used). Adopted Ord. No. 23-044-00 (eff. 8/17/2023). | per dwelling unit | $2,301 | City of Leander, TX (Municode Library) Aug 17, 2023High |
Water connection (tap / SDC) Water Tap Fee (full install, 3/4-inch meter) — VERIFIED directly against Municode Appendix A, Sec. A7.007 (browser-rendered): water tap where the city installs service lines and sets the meter (typical new construction) is 5/8 inch $840.00, 3/4 inch $940.00. Additive to the water impact fee. Excludes backflow device cost; street cut adds $1,000 for a two-lane roadway + $500 per additional lane. (Where lines already exist and the city only inspects + sets a meter, the lower 3/4-inch fee is $415 - a different scenario, not used here.) | per meter | $940 | City of Leander, TX (Municode Library) —High |
Water connection (tap / SDC) Water Tap Fee (full install, 5/8-inch meter) — VERIFIED against Municode Sec. A7.007: 5/8 inch $840.00. Mutually exclusive meter-size variant of the water tap fee; the 3/4-inch ($940) row is used as the primary residential meter. excludeFromTotal=true is correct to avoid double-counting. alternative · not added to total | per meter | $840 | City of Leander, TX (Municode Library) —High |
Sewer connection (tap / SDC) Wastewater Tap Fee (full install by city) — VERIFIED directly against Municode Appendix A, Sec. A7.007 wastewater tap schedule (browser-rendered): 'Where service lines must be installed set by the city, the tap fee shall be $750.00.' Flat fee. Street cut adds $850 for a two-lane roadway + $425 per additional lane. Additive to the wastewater impact fee. (Where lines already exist and the city only inspects, the fee is $100 - a different scenario.) Note: researcher's original quote prefixed 'Wastewater tap schedule ...'; corrected to the verbatim code sentence. | per meter | $750 | City of Leander, TX (Municode Library) —High |
What drives the difference
Leander’s $16,912 per single-family home is $13,162 (351%) above Conroe’s $3,750. The largest single difference is in water connection (tap / sdc): Leander charges about $9,702 there versus $1,875 in Conroe — a $7,827 swing that accounts for much of the overall gap. The two also differ in how much falls on water and sewer connection charges: $3,750 in Conroe versus $12,753 in Leander.
Keep comparing
Conroe vs Leander impact fees — FAQ
- Which has higher impact fees, Conroe or Leander?
- Leander, TX is higher. A single-family home pays about $16,912 per unit in Leander versus $3,750 in Conroe, TX — $13,162 (351%) more, as of 2026.
- How much more does it cost to build a home in Leander than in Conroe?
- About $13,162 more per single-family home — $16,912 in Leander, TX versus $3,750 in Conroe, TX, a difference of 351% in total development impact and connection fees.
- What's the difference between impact fees in Conroe and Leander for a single-family home?
- Conroe, TX charges about $3,750 per single-family home ($0 impact + $3,750 water/sewer connection), while Leander, TX charges about $16,912 ($4,159 impact + $12,753 connection). Figures are normalized from official sources for 2026.