ImpactFeeAtlasCompare fees

Celina, TX vs Osceola County, FL: Development Impact Fees Compared (2026)

A single-family home pays about $36,743 in Celina vs $48,161 in Osceola County Osceola County is $11,418 (31%) higher. Every figure below is normalized per dwelling unit by category, with links to each jurisdiction’s official sources.

City

Celina, TX

$36,743
Total per single-family home
impact + connection fees
$15,540
Impact / development fees
roads, parks, schools…
$21,203
Water & sewer connection
tap / capacity / SDC
Per multifamily unit
total fees / unit

Impact / development fees

Fee (local term)BasisAmountSource · effective
Transportation / roads
Roadway Impact Fee — Roadway impact fee per Texas LGC Ch. 395. VERIFIED 2026-06-17: Estimator Worksheet row 15 (Single-Family Detached Housing, 4.6 veh-mi, $3,043.48/veh-mi) and row 32 ROADWAY IMPACT FEE COST: 14000. The estimator's per-service-area collection-rate table (LUE Table 2025 Study, cells T5:U11) confirms $3,043.48/veh-mi is the UNIFORM adopted collection rate for Service Areas 1, 2, 3, 4, AND 5, so the 'SA1-5' grouping is correct; 4.60 x $3,043.48 = $14,000.008 (rounddown 14,000). Jan 2025 RIF Study (Kimley-Horn) confirms 4.60 veh-mi/SFD and lists the higher MAXIMUM assessable fee ($18,359 SA1 to $18,382 SA5; max per-veh-mi $3,048-$3,996); the city collects at the reduced $3,043.48 rate. The collection rate and $14,000 figure are NOT in the RIF study itself — they come from the adopted estimator. Applies to plats dated on/after 3/12/2025.
per dwelling unit$14,000City of Celina, Texas
Mar 12, 2025High
Transportation / roads
Roadway Impact Fee (Service Area 6) — Mutually-exclusive service-area variant. VERIFIED 2026-06-17: Estimator LUE Table 2025 Study cell U10 confirms SA6 collection rate $1,934.78/veh-mi. 4.6 x $1,934.78 = $8,899.99 (rounds to ~$8,900). Correctly excluded; Service Areas 1-5 row ($14,000) is the representative primary. RIF max assessable for SA6 is $8,906/SF home.
alternative · not added to total
per dwelling unit$8,900City of Celina, Texas
Mar 12, 2025High
Transportation / roads
Roadway Impact Fee (Service Area 7) — Mutually-exclusive service-area variant. VERIFIED 2026-06-17: Estimator LUE Table 2025 Study cell U11 confirms SA7 collection rate $1,565.22/veh-mi. 4.6 x $1,565.22 = $7,200.01 (rounddown 7,200). Correctly excluded; Service Areas 1-5 row is the representative primary. RIF study max assessable for SA7 is $7,277/SF home.
alternative · not added to total
per dwelling unit$7,200City of Celina, Texas
Mar 12, 2025High
Parks & recreation
Park Improvement Fee (Single-Family) — Park improvement fee on new 1 & 2 family dwellings. VERIFIED 2026-06-17 verbatim in Master Fee Chart Nov 2025 residential building permit section (Park Improvement $1,500 per unit). NOTE: Texas LGC Ch. 395 does NOT authorize park impact fees; this is a parkland-dedication/development exaction levied under the city's subdivision/zoning authority, not a Ch. 395 impact fee. Builder pays it regardless.
per dwelling unit$1,500City of Celina, Texas
Nov 11, 2025High
Public safety
Outdoor Warning Device Fee (Single-Family) — Outdoor warning (storm-siren) device fee charged per new single-family dwelling at building permit. VERIFIED 2026-06-17 verbatim in Master Fee Chart Nov 2025 (Outdoor Warning Device $40 per unit (SF); $14/unit for multi-family). Permit-time exaction, not a Ch. 395 impact fee.
per dwelling unit$40City of Celina, Texas
Nov 11, 2025High
General government / capital
Civil/Site Development Permit Fee (Residential, per lot) — Site development (civil) permit fee billed per residential lot at the subdivision/civil stage, typically paid by the developer rather than per home permit. VERIFIED 2026-06-17 verbatim in Master Fee Chart Nov 2025 Site Development Fees (Civil Permit) section (Civil Permit Fee - Residential $601 (per lot)). Correctly excluded from the per-dwelling-unit impact-fee total to avoid mixing process fees with capacity fees.
alternative · not added to total
per dwelling unit$601City of Celina, Texas
Nov 11, 2025High

Water & sewer connection fees

Fee (local term)BasisAmountSource · effective
Water connection (tap / SDC)
Water Impact Fee — Water impact fee per Texas LGC Ch. 395, for the standard 1-inch residential meter (1.0 service unit). VERIFIED 2026-06-17: confirmed verbatim in the 2025 Impact Fee Estimator 'Water-Sewer 2025' tab (Single-Family, 1", Displacement, SUE 1, Water Impact Fee 6815) and main Worksheet row 38. Independently corroborated by July 2025 W&W Impact Fee Report (Freese & Nichols) Tables ES-2 and 4-4: Maximum Water Impact Fee per SU $13,631, 50% credit, Maximum Allowable Water Impact Fee = $6,815. Replaced the 2021 rate of $4,400 (1-inch).
per dwelling unit$6,815City of Celina, Texas
Mar 12, 2025High
Water connection (tap / SDC)
Water Impact Fee (3/4" meter variant) — Mutually-exclusive meter-size variant. VERIFIED 2026-06-17: 'Water-Sewer 2025' tab shows Single-Family 3/4" Displacement SUE 0.625 Water Impact Fee 4259 (= 6815 x 0.625 = 4259.4). City standardized residential to 1-inch meters, so the 1-inch row is the representative primary; this 3/4-inch row is correctly excluded from the total. (Note: W&W report Table 4-1 displays 3/4" SUE as 0.6 rounded, but the operative adopted estimator uses 0.625.)
alternative · not added to total
per dwelling unit$4,259City of Celina, Texas
Mar 12, 2025High
Sewer connection (tap / SDC)
Wastewater (Sewer) Impact Fee — Wastewater impact fee per Texas LGC Ch. 395, standard 1-inch residential meter (1.0 service unit). VERIFIED 2026-06-17: confirmed in the 2025 Impact Fee Estimator 'Water-Sewer 2025' tab (sewer column = 10233; row total 17048 = 6815 + 10233) and Worksheet row 38. Corroborated by W&W Impact Fee Report Tables ES-3 and 4-5: Maximum Wastewater Impact Fee per SU $20,467, 50% credit, Maximum Allowable Wastewater Impact Fee = $10,233. (The W&W report's narrative ES paragraph contains a typo '$10,496' but all controlling tables state $10,233.) Replaced the 2021 rate of $5,200 (1-inch).
per dwelling unit$10,233City of Celina, Texas
Mar 12, 2025High
Sewer connection (tap / SDC)
Wastewater (Sewer) Impact Fee (3/4" meter variant) — Mutually-exclusive meter-size variant (0.625 SU). VERIFIED 2026-06-17: 'Water-Sewer 2025' tab shows 6395 (= 10233 x 0.625 = 6395.6). Correctly excluded; the 1-inch standard meter row is the representative primary.
alternative · not added to total
per dwelling unit$6,395City of Celina, Texas
Mar 12, 2025High
Water connection (tap / SDC)
Water Connection / Access (Tap) Fee - 1" — Water tap/connection ('access') fee for a 1-inch service (standard residential), separate from and additive to the water impact fee. VERIFIED 2026-06-17 verbatim in Master Fee Chart Nov 2025 (Water/Wastewater Connection Fees, Water: 1" Access $2,175). A separate boring fee of $1,200 may apply. This is the physical tap installation charge, not the Ch. 395 capacity/impact fee.
per meter$2,175City of Celina, Texas
Nov 11, 2025High
Water connection (tap / SDC)
Water Meter Fee - 1" — Water meter fee for the 1-inch minimum residential meter. VERIFIED 2026-06-17 verbatim in Master Fee Chart Nov 2025 (Meter Fees: 1" $480 (minimum meter size); 3/4" $415 existing meters only). Additive to tap and impact fees.
per meter$480City of Celina, Texas
Nov 11, 2025High
Sewer connection (tap / SDC)
Sewer Connection (Tap) Fee - 4" — Sewer tap/connection fee for a standard residential 4-inch service lateral, separate from and additive to the wastewater impact fee. VERIFIED 2026-06-17 verbatim in Master Fee Chart Nov 2025 (Sewer: 4" Tap $1,500; Boring Fee $1,000). A separate sewer boring fee of $1,000 may apply.
per meter$1,500City of Celina, Texas
Nov 11, 2025High
Celinaimpact fees →
County

Osceola County, FL

$48,161
Total per single-family home
impact + connection fees
$37,718
Impact / development fees
roads, parks, schools…
$10,443
Water & sewer connection
tap / capacity / SDC
$27,626
Per multifamily unit
total fees / unit

Impact / development fees

Fee (local term)BasisAmountSource · effective
Transportation / roads
Mobility Fee (Transportation) - Single-Family (countywide base CMP area) — Countywide base CMP (Capacity Management Plan) area mobility fee; columns are Single-Family / Mobile Home / Multi-Family Rental / Multi-Family Condo / Townhouse. Used as PRIMARY single-family mobility row. Mutually-exclusive sub-area variants are excluded below. VERIFIED against archived official county PDF.
per dwelling unit$21,710Osceola County, FL (Impact and Mobility Fees Office)
Jun 20, 2025High
Schools
School (Educational System) Impact Fee - Single-Family — Educational system impact fee adopted under Osceola County Code Chapter 24, Article III; collected by the County for school facilities. Identical across all CMP service areas. Columns: Single-Family / Mobile Home / Multi-Family Rental / Multi-Family Condo / Townhouse. VERIFIED.
per dwelling unit$12,923Osceola County, FL (Impact and Mobility Fees Office)
Jun 20, 2025High
Parks & recreation
Park Impact Fee - Single-Family — Identical across all CMP service areas. VERIFIED.
per dwelling unit$2,305Osceola County, FL (Impact and Mobility Fees Office)
Jun 20, 2025High
Fire / EMS
Fire/Rescue Impact Fee - Single-Family — Fire rescue impact fee (Chapter 24, Article V). Identical across all CMP service areas. VERIFIED.
per dwelling unit$780Osceola County, FL (Impact and Mobility Fees Office)
Jun 20, 2025High
Transportation / roads
Mobility Fee - Single-Family (East of Lake Toho CMP Area) [VARIANT] — Mutually-exclusive geographic variant of the single-family mobility fee for the East of Lake Toho CMP service area. Excluded from total; countywide base $21,710.14 is primary. VERIFIED.
alternative · not added to total
per dwelling unit$20,654Osceola County, FL (Impact and Mobility Fees Office)
Jun 20, 2025High
Transportation / roads
Mobility Fee - Single-Family (South Lake Toho CMP Area) [VARIANT] — Mutually-exclusive geographic variant of the single-family mobility fee for the South Lake Toho CMP service area. Excluded from total. VERIFIED.
alternative · not added to total
per dwelling unit$20,014Osceola County, FL (Impact and Mobility Fees Office)
Jun 20, 2025High
Transportation / roads
Mobility Fee - Single-Family (Alligator Chain of Lakes CMP Area) [VARIANT] — Mutually-exclusive geographic variant of the single-family mobility fee for the Alligator Chain of Lakes CMP service area. Excluded from total. VERIFIED.
alternative · not added to total
per dwelling unit$21,347Osceola County, FL (Impact and Mobility Fees Office)
Jun 20, 2025High

Water & sewer connection fees

Fee (local term)BasisAmountSource · effective
Water connection (tap / SDC)
Toho Water Authority - Water System Development Charge (SDC), 3/4" meter — Toho Water Authority (utility serving Osceola County) Water SDC for the standard residential 3/4" meter. Separate special district / utility authority fee a builder must pay. PRIMARY meter size; larger meters are mutually-exclusive variants (excluded below). VERIFIED in Appendix A PDF.
per meter$6,650Toho Water Authority
May 5, 2025High
Sewer connection (tap / SDC)
Toho Water Authority - Wastewater/Sewer System Development Charge (SDC), 3/4" meter — Toho Water Authority Wastewater SDC for the standard residential 3/4" meter. Combined water+wastewater SDC = $9,943 per ERU at the 3/4" meter. Separate special district / utility authority fee. VERIFIED in Appendix A PDF.
per meter$3,293Toho Water Authority
May 5, 2025High
Water connection (tap / SDC)
Toho Water Authority - Water meter installation fee, 3/4" meter — Meter installation/set fee, additive to the water SDC for a new 3/4" residential connection. INDEPENDENTLY VERIFIED on the Toho Development Fees page AND in the Appendix A PDF (sourceIndex 1: '3/4" Potable Meter with dual check $500.00'). Confidence upgraded medium->high.
per meter$500Toho Water Authority
May 5, 2025High
Sewer connection (tap / SDC)
Toho Water Authority - Sanitary sewer tap fee — Wastewater tap fee, additive to the sewer SDC where a new tap is required. INDEPENDENTLY VERIFIED on the Toho Development Fees page; confidence upgraded medium->high. A separate sanitary lateral ($4,800) and sanitary connection ($150) may also apply depending on connection scope.
$2,250Toho Water Authority
May 5, 2025High
Water connection (tap / SDC)
Toho Water Authority - Water SDC, 1" meter [VARIANT] — Mutually-exclusive meter-size variant. Standard residential uses 3/4" meter (primary). Wastewater SDC at 1" meter is $5,499. VERIFIED in Appendix A PDF.
alternative · not added to total
per meter$11,106Toho Water Authority
May 5, 2025High
Water connection (tap / SDC)
Toho Water Authority - Water SDC, 2" meter [VARIANT] — Mutually-exclusive meter-size variant (Water SDC $35,445 / Wastewater SDC $17,552 at 2" meter). All meters above 2" subject to individual capacity analysis. 3/4" meter is primary. VERIFIED in Appendix A PDF.
alternative · not added to total
per meter$35,445Toho Water Authority
May 5, 2025High
Osceola Countyimpact fees →

What drives the difference

Osceola County’s $48,161 per single-family home is $11,418 (31%) above Celina’s $36,743. The largest single difference is in schools: Osceola County charges about $12,923 there versus nothing in Celina — a $12,923 swing that accounts for much of the overall gap. The two also differ in how much falls on water and sewer connection charges: $21,203 in Celina versus $10,443 in Osceola County.

Keep comparing

Celina vs Osceola County impact fees — FAQ

Which has higher impact fees, Celina or Osceola County?
Osceola County, FL is higher. A single-family home pays about $48,161 per unit in Osceola County versus $36,743 in Celina, TX — $11,418 (31%) more, as of 2026.
How much more does it cost to build a home in Osceola County than in Celina?
About $11,418 more per single-family home — $48,161 in Osceola County, FL versus $36,743 in Celina, TX, a difference of 31% in total development impact and connection fees.
What's the difference between impact fees in Celina and Osceola County for a single-family home?
Celina, TX charges about $36,743 per single-family home ($15,540 impact + $21,203 water/sewer connection), while Osceola County, FL charges about $48,161 ($37,718 impact + $10,443 connection). Figures are normalized from official sources for 2026.