ImpactFeeAtlasCompare fees

Celina, TX vs Leander, TX: Development Impact Fees Compared (2026)

A single-family home pays about $36,743 in Celina vs $16,912 in Leander Celina is $19,831 (117%) higher. Every figure below is normalized per dwelling unit by category, with links to each jurisdiction’s official sources.

City

Celina, TX

$36,743
Total per single-family home
impact + connection fees
$15,540
Impact / development fees
roads, parks, schools…
$21,203
Water & sewer connection
tap / capacity / SDC
Per multifamily unit
total fees / unit

Impact / development fees

Fee (local term)BasisAmountSource · effective
Transportation / roads
Roadway Impact Fee — Roadway impact fee per Texas LGC Ch. 395. VERIFIED 2026-06-17: Estimator Worksheet row 15 (Single-Family Detached Housing, 4.6 veh-mi, $3,043.48/veh-mi) and row 32 ROADWAY IMPACT FEE COST: 14000. The estimator's per-service-area collection-rate table (LUE Table 2025 Study, cells T5:U11) confirms $3,043.48/veh-mi is the UNIFORM adopted collection rate for Service Areas 1, 2, 3, 4, AND 5, so the 'SA1-5' grouping is correct; 4.60 x $3,043.48 = $14,000.008 (rounddown 14,000). Jan 2025 RIF Study (Kimley-Horn) confirms 4.60 veh-mi/SFD and lists the higher MAXIMUM assessable fee ($18,359 SA1 to $18,382 SA5; max per-veh-mi $3,048-$3,996); the city collects at the reduced $3,043.48 rate. The collection rate and $14,000 figure are NOT in the RIF study itself — they come from the adopted estimator. Applies to plats dated on/after 3/12/2025.
per dwelling unit$14,000City of Celina, Texas
Mar 12, 2025High
Transportation / roads
Roadway Impact Fee (Service Area 6) — Mutually-exclusive service-area variant. VERIFIED 2026-06-17: Estimator LUE Table 2025 Study cell U10 confirms SA6 collection rate $1,934.78/veh-mi. 4.6 x $1,934.78 = $8,899.99 (rounds to ~$8,900). Correctly excluded; Service Areas 1-5 row ($14,000) is the representative primary. RIF max assessable for SA6 is $8,906/SF home.
alternative · not added to total
per dwelling unit$8,900City of Celina, Texas
Mar 12, 2025High
Transportation / roads
Roadway Impact Fee (Service Area 7) — Mutually-exclusive service-area variant. VERIFIED 2026-06-17: Estimator LUE Table 2025 Study cell U11 confirms SA7 collection rate $1,565.22/veh-mi. 4.6 x $1,565.22 = $7,200.01 (rounddown 7,200). Correctly excluded; Service Areas 1-5 row is the representative primary. RIF study max assessable for SA7 is $7,277/SF home.
alternative · not added to total
per dwelling unit$7,200City of Celina, Texas
Mar 12, 2025High
Parks & recreation
Park Improvement Fee (Single-Family) — Park improvement fee on new 1 & 2 family dwellings. VERIFIED 2026-06-17 verbatim in Master Fee Chart Nov 2025 residential building permit section (Park Improvement $1,500 per unit). NOTE: Texas LGC Ch. 395 does NOT authorize park impact fees; this is a parkland-dedication/development exaction levied under the city's subdivision/zoning authority, not a Ch. 395 impact fee. Builder pays it regardless.
per dwelling unit$1,500City of Celina, Texas
Nov 11, 2025High
Public safety
Outdoor Warning Device Fee (Single-Family) — Outdoor warning (storm-siren) device fee charged per new single-family dwelling at building permit. VERIFIED 2026-06-17 verbatim in Master Fee Chart Nov 2025 (Outdoor Warning Device $40 per unit (SF); $14/unit for multi-family). Permit-time exaction, not a Ch. 395 impact fee.
per dwelling unit$40City of Celina, Texas
Nov 11, 2025High
General government / capital
Civil/Site Development Permit Fee (Residential, per lot) — Site development (civil) permit fee billed per residential lot at the subdivision/civil stage, typically paid by the developer rather than per home permit. VERIFIED 2026-06-17 verbatim in Master Fee Chart Nov 2025 Site Development Fees (Civil Permit) section (Civil Permit Fee - Residential $601 (per lot)). Correctly excluded from the per-dwelling-unit impact-fee total to avoid mixing process fees with capacity fees.
alternative · not added to total
per dwelling unit$601City of Celina, Texas
Nov 11, 2025High

Water & sewer connection fees

Fee (local term)BasisAmountSource · effective
Water connection (tap / SDC)
Water Impact Fee — Water impact fee per Texas LGC Ch. 395, for the standard 1-inch residential meter (1.0 service unit). VERIFIED 2026-06-17: confirmed verbatim in the 2025 Impact Fee Estimator 'Water-Sewer 2025' tab (Single-Family, 1", Displacement, SUE 1, Water Impact Fee 6815) and main Worksheet row 38. Independently corroborated by July 2025 W&W Impact Fee Report (Freese & Nichols) Tables ES-2 and 4-4: Maximum Water Impact Fee per SU $13,631, 50% credit, Maximum Allowable Water Impact Fee = $6,815. Replaced the 2021 rate of $4,400 (1-inch).
per dwelling unit$6,815City of Celina, Texas
Mar 12, 2025High
Water connection (tap / SDC)
Water Impact Fee (3/4" meter variant) — Mutually-exclusive meter-size variant. VERIFIED 2026-06-17: 'Water-Sewer 2025' tab shows Single-Family 3/4" Displacement SUE 0.625 Water Impact Fee 4259 (= 6815 x 0.625 = 4259.4). City standardized residential to 1-inch meters, so the 1-inch row is the representative primary; this 3/4-inch row is correctly excluded from the total. (Note: W&W report Table 4-1 displays 3/4" SUE as 0.6 rounded, but the operative adopted estimator uses 0.625.)
alternative · not added to total
per dwelling unit$4,259City of Celina, Texas
Mar 12, 2025High
Sewer connection (tap / SDC)
Wastewater (Sewer) Impact Fee — Wastewater impact fee per Texas LGC Ch. 395, standard 1-inch residential meter (1.0 service unit). VERIFIED 2026-06-17: confirmed in the 2025 Impact Fee Estimator 'Water-Sewer 2025' tab (sewer column = 10233; row total 17048 = 6815 + 10233) and Worksheet row 38. Corroborated by W&W Impact Fee Report Tables ES-3 and 4-5: Maximum Wastewater Impact Fee per SU $20,467, 50% credit, Maximum Allowable Wastewater Impact Fee = $10,233. (The W&W report's narrative ES paragraph contains a typo '$10,496' but all controlling tables state $10,233.) Replaced the 2021 rate of $5,200 (1-inch).
per dwelling unit$10,233City of Celina, Texas
Mar 12, 2025High
Sewer connection (tap / SDC)
Wastewater (Sewer) Impact Fee (3/4" meter variant) — Mutually-exclusive meter-size variant (0.625 SU). VERIFIED 2026-06-17: 'Water-Sewer 2025' tab shows 6395 (= 10233 x 0.625 = 6395.6). Correctly excluded; the 1-inch standard meter row is the representative primary.
alternative · not added to total
per dwelling unit$6,395City of Celina, Texas
Mar 12, 2025High
Water connection (tap / SDC)
Water Connection / Access (Tap) Fee - 1" — Water tap/connection ('access') fee for a 1-inch service (standard residential), separate from and additive to the water impact fee. VERIFIED 2026-06-17 verbatim in Master Fee Chart Nov 2025 (Water/Wastewater Connection Fees, Water: 1" Access $2,175). A separate boring fee of $1,200 may apply. This is the physical tap installation charge, not the Ch. 395 capacity/impact fee.
per meter$2,175City of Celina, Texas
Nov 11, 2025High
Water connection (tap / SDC)
Water Meter Fee - 1" — Water meter fee for the 1-inch minimum residential meter. VERIFIED 2026-06-17 verbatim in Master Fee Chart Nov 2025 (Meter Fees: 1" $480 (minimum meter size); 3/4" $415 existing meters only). Additive to tap and impact fees.
per meter$480City of Celina, Texas
Nov 11, 2025High
Sewer connection (tap / SDC)
Sewer Connection (Tap) Fee - 4" — Sewer tap/connection fee for a standard residential 4-inch service lateral, separate from and additive to the wastewater impact fee. VERIFIED 2026-06-17 verbatim in Master Fee Chart Nov 2025 (Sewer: 4" Tap $1,500; Boring Fee $1,000). A separate sewer boring fee of $1,000 may apply.
per meter$1,500City of Celina, Texas
Nov 11, 2025High
Celinaimpact fees →
City

Leander, TX

$16,912
Total per single-family home
impact + connection fees
$4,159
Impact / development fees
roads, parks, schools…
$12,753
Water & sewer connection
tap / capacity / SDC
Per multifamily unit
total fees / unit

Impact / development fees

Fee (local term)BasisAmountSource · effective
Transportation / roads
Roadway Impact Fee (collected, residential 50% of max; Service Area D representative) — REPRESENTATIVE value (Service Area D). VERIFIED: the study's sample calculation (Example 1) confirms SF detached = 4.04 veh-mi/DU x Service Area D $1,229 = $4,965.16 maximum assessable. Max fee per service unit by area VERIFIED from Table 8: A $2,179, B $842, C $929, D $1,229, E $287. The 50% residential collection rate (10% nonresidential) is NOT in the fee-study PDF; it is corroborated by a web search and the citizenportal council-workshop coverage (source 4 was HTTP 403 on direct fetch, confirmed via search-engine snippet). Shown amount = 50% of SA D max ($4,965.16 x 0.50 = $2,482.58). Collected by area at 50%: A $4,401.58, B $1,700.84, C $1,876.58, D $2,482.58, E $579.74. Confidence MEDIUM: collection rate from a secondary source and the city was actively considering raising it (to phase out the separate Roadway Adequacy Payment) as of mid-2025. Verify exact service area + current collection rate at building permit.
per dwelling unit$2,483City of Leander, TX (prepared by Kimley-Horn)
Dec 1, 2023Medium
Transportation / roads
Roadway Impact Fee MAXIMUM assessable (Service Area D) — VERIFIED exactly against the study sample calculation (Example 1, Service Area D): 'Impact Fee = 1 * 4.04 * $1,229 ... Maximum Assessable Impact Fee = $4,965.16.' This is the MAXIMUM assessable (not what is collected); actual residential collection is 50% of this (see collected row). excludeFromTotal=true is correct to avoid double-counting with the collected roadway row.
alternative · not added to total
per dwelling unit$4,965City of Leander, TX (prepared by Kimley-Horn)
Dec 1, 2023High
Parks & recreation
Fee-in-Lieu of Parkland (Williamson County) — VERIFIED exactly against the downloaded Concept Plan Submittal Packet PDF (text extracted via pdftotext): 'Parkland is calculated as 7.5 acres per each 100 dwelling units. A payment of fee in lieu of parkland is an option at a rate of $1,676.60 for Williamson County or $2,355.13 for Travis County.' NOT a Chapter 395 impact fee - this is a parkland dedication / fee-in-lieu requirement under the city's subdivision/parks authority for residential developments (developer may dedicate 7.5 ac/100 DU OR pay this per-unit fee). Leander is primarily in Williamson County, so $1,676.60/DU is the applicable primary rate. Park improvements (up to 50%) may also be required separately.
per dwelling unit$1,677City of Leander, TX
Oct 9, 2025High
Parks & recreation
Fee-in-Lieu of Parkland (Travis County portion) — VERIFIED exactly against the Concept Plan Submittal Packet PDF. Mutually exclusive county variant; applies only to the Travis County ETJ portion of Leander's jurisdiction. Williamson County rate ($1,676.60) used as primary since Leander is primarily in Williamson County. excludeFromTotal=true is correct.
alternative · not added to total
per dwelling unit$2,355City of Leander, TX
Oct 9, 2025High

Water & sewer connection fees

Fee (local term)BasisAmountSource · effective
Water connection (tap / SDC)
Water Impact (Capital Recovery) Fee — VERIFIED directly against Municode Sec. 13.07.009 (browser-rendered): '(2) Water: $8,762.00.' Adopted by Ord. No. 23-044-00, sec. 4 (eff. 8/17/2023). Per LUE (living unit equivalent); one single-family detached residence of average size = 1.0 LUE, so $8,762 per home. The code expressly states the impact fee 'shall be charged in addition to all other fees... including... building permit fees and tap fees,' so this is additive to the water tap fee.
per dwelling unit$8,762City of Leander, TX (Municode Library)
Aug 17, 2023High
Sewer connection (tap / SDC)
Wastewater Impact (Capital Recovery) Fee — VERIFIED directly against Municode Sec. 13.07.009 (browser-rendered): '(1) Wastewater: $2,301.00.' Per LUE; SF detached = 1.0 LUE = $2,301 per home. Combined code water+wastewater = $11,063 per LUE (note: a July 2023 Community Impact news article reported the combined figure as $11,064.73/LUE; the code itself lists exactly $8,762 + $2,301, so $11,063 is used). Adopted Ord. No. 23-044-00 (eff. 8/17/2023).
per dwelling unit$2,301City of Leander, TX (Municode Library)
Aug 17, 2023High
Water connection (tap / SDC)
Water Tap Fee (full install, 3/4-inch meter) — VERIFIED directly against Municode Appendix A, Sec. A7.007 (browser-rendered): water tap where the city installs service lines and sets the meter (typical new construction) is 5/8 inch $840.00, 3/4 inch $940.00. Additive to the water impact fee. Excludes backflow device cost; street cut adds $1,000 for a two-lane roadway + $500 per additional lane. (Where lines already exist and the city only inspects + sets a meter, the lower 3/4-inch fee is $415 - a different scenario, not used here.)
per meter$940City of Leander, TX (Municode Library)
High
Water connection (tap / SDC)
Water Tap Fee (full install, 5/8-inch meter) — VERIFIED against Municode Sec. A7.007: 5/8 inch $840.00. Mutually exclusive meter-size variant of the water tap fee; the 3/4-inch ($940) row is used as the primary residential meter. excludeFromTotal=true is correct to avoid double-counting.
alternative · not added to total
per meter$840City of Leander, TX (Municode Library)
High
Sewer connection (tap / SDC)
Wastewater Tap Fee (full install by city) — VERIFIED directly against Municode Appendix A, Sec. A7.007 wastewater tap schedule (browser-rendered): 'Where service lines must be installed set by the city, the tap fee shall be $750.00.' Flat fee. Street cut adds $850 for a two-lane roadway + $425 per additional lane. Additive to the wastewater impact fee. (Where lines already exist and the city only inspects, the fee is $100 - a different scenario.) Note: researcher's original quote prefixed 'Wastewater tap schedule ...'; corrected to the verbatim code sentence.
per meter$750City of Leander, TX (Municode Library)
High
Leanderimpact fees →

What drives the difference

Celina’s $36,743 per single-family home is $19,831 (117%) above Leander’s $16,912. The largest single difference is in transportation / roads: Celina charges about $14,000 there versus $2,483 in Leander — a $11,517 swing that accounts for much of the overall gap. The two also differ in how much falls on water and sewer connection charges: $21,203 in Celina versus $12,753 in Leander.

Keep comparing

Celina vs Leander impact fees — FAQ

Which has higher impact fees, Celina or Leander?
Celina, TX is higher. A single-family home pays about $36,743 per unit in Celina versus $16,912 in Leander, TX — $19,831 (117%) more, as of 2026.
How much more does it cost to build a home in Celina than in Leander?
About $19,831 more per single-family home — $36,743 in Celina, TX versus $16,912 in Leander, TX, a difference of 117% in total development impact and connection fees.
What's the difference between impact fees in Celina and Leander for a single-family home?
Celina, TX charges about $36,743 per single-family home ($15,540 impact + $21,203 water/sewer connection), while Leander, TX charges about $16,912 ($4,159 impact + $12,753 connection). Figures are normalized from official sources for 2026.