Celina, TX vs Erie, CO: Development Impact Fees Compared (2026)
A single-family home pays about $36,743 in Celina vs $94,679 in Erie — Erie is $57,936 (158%) higher. Every figure below is normalized per dwelling unit by category, with links to each jurisdiction’s official sources.
City
Celina, TX
$36,743
Total per single-family home
impact + connection fees
$15,540
Impact / development fees
roads, parks, schools…
$21,203
Water & sewer connection
tap / capacity / SDC
—
Per multifamily unit
total fees / unit
Impact / development fees
| Fee (local term) | Basis | Amount | Source · effective |
|---|---|---|---|
Transportation / roads Roadway Impact Fee — Roadway impact fee per Texas LGC Ch. 395. VERIFIED 2026-06-17: Estimator Worksheet row 15 (Single-Family Detached Housing, 4.6 veh-mi, $3,043.48/veh-mi) and row 32 ROADWAY IMPACT FEE COST: 14000. The estimator's per-service-area collection-rate table (LUE Table 2025 Study, cells T5:U11) confirms $3,043.48/veh-mi is the UNIFORM adopted collection rate for Service Areas 1, 2, 3, 4, AND 5, so the 'SA1-5' grouping is correct; 4.60 x $3,043.48 = $14,000.008 (rounddown 14,000). Jan 2025 RIF Study (Kimley-Horn) confirms 4.60 veh-mi/SFD and lists the higher MAXIMUM assessable fee ($18,359 SA1 to $18,382 SA5; max per-veh-mi $3,048-$3,996); the city collects at the reduced $3,043.48 rate. The collection rate and $14,000 figure are NOT in the RIF study itself — they come from the adopted estimator. Applies to plats dated on/after 3/12/2025. | per dwelling unit | $14,000 | City of Celina, Texas Mar 12, 2025High |
Transportation / roads Roadway Impact Fee (Service Area 6) — Mutually-exclusive service-area variant. VERIFIED 2026-06-17: Estimator LUE Table 2025 Study cell U10 confirms SA6 collection rate $1,934.78/veh-mi. 4.6 x $1,934.78 = $8,899.99 (rounds to ~$8,900). Correctly excluded; Service Areas 1-5 row ($14,000) is the representative primary. RIF max assessable for SA6 is $8,906/SF home. alternative · not added to total | per dwelling unit | $8,900 | City of Celina, Texas Mar 12, 2025High |
Transportation / roads Roadway Impact Fee (Service Area 7) — Mutually-exclusive service-area variant. VERIFIED 2026-06-17: Estimator LUE Table 2025 Study cell U11 confirms SA7 collection rate $1,565.22/veh-mi. 4.6 x $1,565.22 = $7,200.01 (rounddown 7,200). Correctly excluded; Service Areas 1-5 row is the representative primary. RIF study max assessable for SA7 is $7,277/SF home. alternative · not added to total | per dwelling unit | $7,200 | City of Celina, Texas Mar 12, 2025High |
Parks & recreation Park Improvement Fee (Single-Family) — Park improvement fee on new 1 & 2 family dwellings. VERIFIED 2026-06-17 verbatim in Master Fee Chart Nov 2025 residential building permit section (Park Improvement $1,500 per unit). NOTE: Texas LGC Ch. 395 does NOT authorize park impact fees; this is a parkland-dedication/development exaction levied under the city's subdivision/zoning authority, not a Ch. 395 impact fee. Builder pays it regardless. | per dwelling unit | $1,500 | City of Celina, Texas Nov 11, 2025High |
Public safety Outdoor Warning Device Fee (Single-Family) — Outdoor warning (storm-siren) device fee charged per new single-family dwelling at building permit. VERIFIED 2026-06-17 verbatim in Master Fee Chart Nov 2025 (Outdoor Warning Device $40 per unit (SF); $14/unit for multi-family). Permit-time exaction, not a Ch. 395 impact fee. | per dwelling unit | $40 | City of Celina, Texas Nov 11, 2025High |
General government / capital Civil/Site Development Permit Fee (Residential, per lot) — Site development (civil) permit fee billed per residential lot at the subdivision/civil stage, typically paid by the developer rather than per home permit. VERIFIED 2026-06-17 verbatim in Master Fee Chart Nov 2025 Site Development Fees (Civil Permit) section (Civil Permit Fee - Residential $601 (per lot)). Correctly excluded from the per-dwelling-unit impact-fee total to avoid mixing process fees with capacity fees. alternative · not added to total | per dwelling unit | $601 | City of Celina, Texas Nov 11, 2025High |
Water & sewer connection fees
| Fee (local term) | Basis | Amount | Source · effective |
|---|---|---|---|
Water connection (tap / SDC) Water Impact Fee — Water impact fee per Texas LGC Ch. 395, for the standard 1-inch residential meter (1.0 service unit). VERIFIED 2026-06-17: confirmed verbatim in the 2025 Impact Fee Estimator 'Water-Sewer 2025' tab (Single-Family, 1", Displacement, SUE 1, Water Impact Fee 6815) and main Worksheet row 38. Independently corroborated by July 2025 W&W Impact Fee Report (Freese & Nichols) Tables ES-2 and 4-4: Maximum Water Impact Fee per SU $13,631, 50% credit, Maximum Allowable Water Impact Fee = $6,815. Replaced the 2021 rate of $4,400 (1-inch). | per dwelling unit | $6,815 | City of Celina, Texas Mar 12, 2025High |
Water connection (tap / SDC) Water Impact Fee (3/4" meter variant) — Mutually-exclusive meter-size variant. VERIFIED 2026-06-17: 'Water-Sewer 2025' tab shows Single-Family 3/4" Displacement SUE 0.625 Water Impact Fee 4259 (= 6815 x 0.625 = 4259.4). City standardized residential to 1-inch meters, so the 1-inch row is the representative primary; this 3/4-inch row is correctly excluded from the total. (Note: W&W report Table 4-1 displays 3/4" SUE as 0.6 rounded, but the operative adopted estimator uses 0.625.) alternative · not added to total | per dwelling unit | $4,259 | City of Celina, Texas Mar 12, 2025High |
Sewer connection (tap / SDC) Wastewater (Sewer) Impact Fee — Wastewater impact fee per Texas LGC Ch. 395, standard 1-inch residential meter (1.0 service unit). VERIFIED 2026-06-17: confirmed in the 2025 Impact Fee Estimator 'Water-Sewer 2025' tab (sewer column = 10233; row total 17048 = 6815 + 10233) and Worksheet row 38. Corroborated by W&W Impact Fee Report Tables ES-3 and 4-5: Maximum Wastewater Impact Fee per SU $20,467, 50% credit, Maximum Allowable Wastewater Impact Fee = $10,233. (The W&W report's narrative ES paragraph contains a typo '$10,496' but all controlling tables state $10,233.) Replaced the 2021 rate of $5,200 (1-inch). | per dwelling unit | $10,233 | City of Celina, Texas Mar 12, 2025High |
Sewer connection (tap / SDC) Wastewater (Sewer) Impact Fee (3/4" meter variant) — Mutually-exclusive meter-size variant (0.625 SU). VERIFIED 2026-06-17: 'Water-Sewer 2025' tab shows 6395 (= 10233 x 0.625 = 6395.6). Correctly excluded; the 1-inch standard meter row is the representative primary. alternative · not added to total | per dwelling unit | $6,395 | City of Celina, Texas Mar 12, 2025High |
Water connection (tap / SDC) Water Connection / Access (Tap) Fee - 1" — Water tap/connection ('access') fee for a 1-inch service (standard residential), separate from and additive to the water impact fee. VERIFIED 2026-06-17 verbatim in Master Fee Chart Nov 2025 (Water/Wastewater Connection Fees, Water: 1" Access $2,175). A separate boring fee of $1,200 may apply. This is the physical tap installation charge, not the Ch. 395 capacity/impact fee. | per meter | $2,175 | City of Celina, Texas Nov 11, 2025High |
Water connection (tap / SDC) Water Meter Fee - 1" — Water meter fee for the 1-inch minimum residential meter. VERIFIED 2026-06-17 verbatim in Master Fee Chart Nov 2025 (Meter Fees: 1" $480 (minimum meter size); 3/4" $415 existing meters only). Additive to tap and impact fees. | per meter | $480 | City of Celina, Texas Nov 11, 2025High |
Sewer connection (tap / SDC) Sewer Connection (Tap) Fee - 4" — Sewer tap/connection fee for a standard residential 4-inch service lateral, separate from and additive to the wastewater impact fee. VERIFIED 2026-06-17 verbatim in Master Fee Chart Nov 2025 (Sewer: 4" Tap $1,500; Boring Fee $1,000). A separate sewer boring fee of $1,000 may apply. | per meter | $1,500 | City of Celina, Texas Nov 11, 2025High |
Town
Erie, CO
$94,679
Total per single-family home
impact + connection fees
$16,329
Impact / development fees
roads, parks, schools…
$78,350
Water & sewer connection
tap / capacity / SDC
$9,216
Per multifamily unit
total fees / unit
Impact / development fees
| Fee (local term) | Basis | Amount | Source · effective |
|---|---|---|---|
Parks & recreation Parks & Recreation Impact Fee | per dwelling unit | $2,803 | Town of Erie, CO Jan 1, 2026High |
Police Police Facilities Impact Fee | per dwelling unit | $686 | Town of Erie, CO Jan 1, 2026High |
General government / capital Public Facilities Impact Fee — General/municipal capital facilities impact fee. | per dwelling unit | $4,276 | Town of Erie, CO Jan 1, 2026High |
Drainage / stormwater Storm Drainage System Impact Fee | per dwelling unit | $1,862 | Town of Erie, CO Jan 1, 2026High |
Transportation / roads Transportation Facilities Impact Fee (standard area) — PRIMARY transportation rate; applies to property outside the Town Center PD and Historic Old Town (covers most new residential development). | per dwelling unit | $6,402 | Town of Erie, CO Jan 1, 2026High |
Transportation / roads Transportation Facilities Impact Fee (Town Center / Old Town) — Mutually-exclusive geographic variant (Town Center PD / Historic Old Town OTR/NMU/DT/MR zones); excluded from total in favor of the townwide standard rate. Verified verbatim on live 2026 page. alternative · not added to total | per dwelling unit | $4,546 | Town of Erie, CO Jan 1, 2026High |
Other Tree Impact Fee — Per-dwelling-unit tree/urban-forestry impact fee; same $300 for all dwelling types (page shows 'All other dwelling units $300'). | per dwelling unit | $300 | Town of Erie, CO Jan 1, 2026High |
Water & sewer connection fees
| Fee (local term) | Basis | Amount | Source · effective |
|---|---|---|---|
Water connection (tap / SDC) Potable Water Tap Fee (3/4 inch residential) — Base 3/4" residential meter (typical single-family). Fees double for parcels outside Town limits. Confirmed by Ordinance 039-2024 ($17,290). | per meter | $17,290 | Town of Erie, CO Jan 1, 2026High |
Water connection (tap / SDC) Fee in Lieu of Water Dedication / Raw Water Fee (single-family residential) — SEPARATE, ADDITIVE one-time fee on top of the water tap fee (Ordinance 039-2024: 'separate and distinct fees'). Single largest residential charge. VERIFIED at $52,200 verbatim on the live 2026 fee schedule (sourceIndex 0). NOTE: Ordinance 039-2024 and the Water Dedication Guide state the 2025 fee-in-lieu was $31,400/SFE; the fee escalated to $52,200 for 2026. The 2026 amount is NOT supported by the Water Dedication Guide (which still shows $31,400) — confirmation rests on the live 2026 fee schedule only. | per dwelling unit | $52,200 | Town of Erie, CO Jan 1, 2026High |
Sewer connection (tap / SDC) Wastewater (Sewer) Tap Fee (3/4 inch) — Base 3/4" residential. Fees double for parcels outside Town limits. Confirmed by Ordinance 039-2024 ('Wastewater tap fee: ¾ inch 8,860.00'). | per meter | $8,860 | Town of Erie, CO Jan 1, 2026High |
Water connection (tap / SDC) Potable Water Tap Fee (1 inch) — Larger meter variant; excluded in favor of the base 3/4" residential meter. Confirmed by Ordinance 039-2024. alternative · not added to total | per meter | $28,820 | Town of Erie, CO Jan 1, 2026High |
Sewer connection (tap / SDC) Wastewater (Sewer) Tap Fee (1 inch) — Larger meter variant; excluded in favor of the base 3/4" residential meter. Confirmed by Ordinance 039-2024 ('1 inch 14,767.00'). alternative · not added to total | per meter | $14,767 | Town of Erie, CO Jan 1, 2026High |
What drives the difference
Erie’s $94,679 per single-family home is $57,936 (158%) above Celina’s $36,743. The largest single difference is in water connection (tap / sdc): Erie charges about $69,490 there versus $9,470 in Celina — a $60,020 swing that accounts for much of the overall gap. The two also differ in how much falls on water and sewer connection charges: $21,203 in Celina versus $78,350 in Erie.
Keep comparing
Celina vs Erie impact fees — FAQ
- Which has higher impact fees, Celina or Erie?
- Erie, CO is higher. A single-family home pays about $94,679 per unit in Erie versus $36,743 in Celina, TX — $57,936 (158%) more, as of 2026.
- How much more does it cost to build a home in Erie than in Celina?
- About $57,936 more per single-family home — $94,679 in Erie, CO versus $36,743 in Celina, TX, a difference of 158% in total development impact and connection fees.
- What's the difference between impact fees in Celina and Erie for a single-family home?
- Celina, TX charges about $36,743 per single-family home ($15,540 impact + $21,203 water/sewer connection), while Erie, CO charges about $94,679 ($16,329 impact + $78,350 connection). Figures are normalized from official sources for 2026.